Skip to main content

Florida Friday; The Great 2012 Florida Trip Part 6 (The southern end of I-95, I-195, I-395, and US 1/Biscayne Boulevard)

After leaving Biscayne National Park I headed northward via Florida State Road 874/Don Shula Expressway and FL 878/Snapper Creek Expressway to US 1/Biscayne Boulevard towards my hotel in Miami.  After hitting the city limit of Miami I encountered the Southern Terminus of Interstate 95 and took it into downtown.






I continued north on I-95 and took I-195 over the Julia Tuttle Causeway towards Miami Beach and FL A1A.





Not a bad view looking back westwards towards downtown Miami.




After stopping at a couple locales in Miami Beach I headed back over I-195 to US 1 on Biscayne Boulevard.





I believe that I actually stayed the downtown Hilton which had a hell of a view of Biscayne Boulevard/US 1 south.





Not a bad view of I-395 on the MacArthur Causeway towards the Port of Miami.





If memory serves correct I-195 was completed back in 1961 along with the grid-anomaly of FL 112.  FL 112 should be in the 8XX grid but appears to have retained the planning route number it was originally assigned.  I-395 I believed opened in the early 1970s I believe as part of an extension of FL 836.

Comments

TIm Ho said…
FYI: Jacksonville citizens voted for increased fuel taxes rather than toll roads some years ago. The Florida DOT disregarded that finding "Lexus [tolling for those who will pay] Lanes" on the east beltway which open shortly.
One news article:

DOT's 1st toll-reader structure goes up on I-295 - News4Jax
https://www.news4jax.com/traffic/first-toll-gantry-goes-up-along-i-295

Aug 11, 2017 - JACKSONVILLE, Fla. - The first toll structure in Jacksonville in 28 years went up last weekend without any fanfare. While traffic was detoured between Interstate 95 and Old St. Augustine Road early Sunday morning, construction crews put up the first toll gantry on I-295. The gantry will be part of a system to ...

It's very own web site!
First Coast Expressway: FDOT
firstcoastexpressway.com/

TIm Ho said…
Go to this NorthEast Florida FDOT page . click on 'larger map' to view the extent of (forever) crashway construction: http://northfloridaexpress.com/

Popular posts from this blog

Abandoned US Route 40 in the Truckee River Canyon

Within the Truckee River Canyon in the Sierra Nevada range numerous abandoned portions of US Route 40 can be found alongside modern Interstate 80.   This segment of highway was opened during 1926 as a bypass of the Dog Valley Grade which carried the early North Lincoln Highway and Victory Highway. The corridor of the Truckee River Canyon State Highway would be assigned as US Route 40 when the US Route System was commissioned during November 1926. During 1958 the segment of Interstate 80 between Boca, California and the Nevada state line was complete. When Interstate 80 opened east of Boca numerous obsolete portions of US Route 40 were abandoned. Some of these abandoned segments have been incorporated into the Tahoe-Pyramid Trail.  Part 1; the history of US Route 40 in the Truckee River Canyon The Truckee River Canyon for centuries has been an established corridor of travel known to native tribes crossing the Sierra Nevada range.  The first documented wagon crossi...

Former California State Route 41 past Bates Station

When California State Route 41 was commissioned during August 1934 it was aligned along the then existing Fresno-Yosemite Road north of the San Joaquin River.  Within the Sierra Nevada foothills of Madera County, the original highway alignment ran past Bates Station via what is now Madera County Road 209, part of eastern Road 406 and Road 207.   Bates Station was a stage station plotted during the early 1880s at what was the intersection of the Coarsegold Road and Stockton-Los Angeles Road.   The modern alignment bypassing Bates Station to the east would be reopened to traffic during late 1939.   Part 1; the history of California State Route 41 past Bates Station Bates Station was featured as one of the many 1875-1899 Madera County era towns in the May 21, 1968, Madera Tribune .  Post Office Service at Bates Station is noted to have been established on November 23, 1883 and ran continuously until October 31, 1903.  The postal name was sourced...

The William Flinn (not Flynn) Highway - Pittsburgh's Misspelled Street

For decades if you traveled along PA Route 8 in Pittsburgh's North Hills suburbs, you would have noticed signs that read "William Flynn Highway" at every intersection.  Even today, many businesses and residences have their addresses listed as XXXX William Flynn Highway.  However, it's not William Flynn Highway, it is William FLINN Highway - and the gentleman who it is named for has a long and storied past in Pittsburgh's infrastructure history. William Flinn was born in England in 1851; however later that year, his family emigrated to the United States and would settle in Pittsburgh.  A 10-year-old school dropout, Flinn grew interested in politics and would join the Allegheny County Republican Party in 1877 as a ward commissioner and a seat on the Board of Fire Commissioners.  Flinn would serve in the Pennsylvania State House of Representatives and Senate from 1877 to 1902. (1) Flinn along with James J. Booth would found the Booth and Flinn construction firm ...