Skip to main content

WVDOH: We may have the Mon-Fayette Expressway done by the end of this year

A WVDOH official indicated that the WV portion of the Mon-Fayette Expressway could be open by the end of the year.

The I-68/Bower's Lane interchange project should be completed by November. The northern half of the interchange which connects to Bower's Lane is 40 percent complete. The southern half of the interchange - a direct tie in to Interstate 68 - is 25 percent finished.

Story Links:
W. Va. portion of expressway could open this year ---The Charleston Gazette
Mon-Fayette Expressway ---WDTV w/video

Commentary:
I just can't see how the direct connection with I-68 will be finished by the end of the year. I expect that West Virginia will open the highway to Bower's Lane - forcing traffic to take a less than one mile detour on WV 857 to get to I-68 - then open the direct connection to I-68 sometime next year.

Comments

Anonymous said…
I can see crews making progress on the Bowers Lane interchange contract, but nothing extremely drastic appears to be happening at the site of the proposed I-68 interchange. You can see construction near the I-68 westbound offramp to Cheat Lake, but nothing is happening on the other side of the interchange near the Burger King. A flyover ramp from the Mon-Fayette Expressway to I-68 East is supposed to be built in that area in conjunction with a "flyunder" ramp that will carry traffic from I-68 East to Route 43 North. At least, those are the plans that I've seen.

I can't picture the I-68 interchange opening by next fall.
Anonymous said…
Actually, according to the link below as well as several other articles, the I-68 interchange is not going to be all that much initially. Right now, according to the article, crews are working on the first phase of the I-68 interchange. The second phase will make the new interchange similar to the one at the western end of I-68, but this contract won't be let until traffic volumes increase.

That seems accurate as there are no evidence of construction at the proposed location of the flyover ramps. Wonder what phase 1 of the I-68 interchange includes? It seems like it's going to initially be of an odd hybrid design.

In any sense, I think it's incorrect for officials to say that West Virginia's portion of the Mon-Fayette Expressway will be totally finished by the end of this year.

http://www.allbusiness.com/transportation/road-transportation-trucking-road/13715110-1.html

Popular posts from this blog

Abandoned US Route 40 in the Truckee River Canyon

Within the Truckee River Canyon in the Sierra Nevada range numerous abandoned portions of US Route 40 can be found alongside modern Interstate 80.   This segment of highway was opened during 1926 as a bypass of the Dog Valley Grade which carried the early North Lincoln Highway and Victory Highway. The corridor of the Truckee River Canyon State Highway would be assigned as US Route 40 when the US Route System was commissioned during November 1926. During 1958 the segment of Interstate 80 between Boca, California and the Nevada state line was complete. When Interstate 80 opened east of Boca numerous obsolete portions of US Route 40 were abandoned. Some of these abandoned segments have been incorporated into the Tahoe-Pyramid Trail.  Part 1; the history of US Route 40 in the Truckee River Canyon The Truckee River Canyon for centuries has been an established corridor of travel known to native tribes crossing the Sierra Nevada range.  The first documented wagon crossi...

Former California State Route 41 past Bates Station

When California State Route 41 was commissioned during August 1934 it was aligned along the then existing Fresno-Yosemite Road north of the San Joaquin River.  Within the Sierra Nevada foothills of Madera County, the original highway alignment ran past Bates Station via what is now Madera County Road 209, part of eastern Road 406 and Road 207.   Bates Station was a stage station plotted during the early 1880s at what was the intersection of the Coarsegold Road and Stockton-Los Angeles Road.   The modern alignment bypassing Bates Station to the east would be reopened to traffic during late 1939.   Part 1; the history of California State Route 41 past Bates Station Bates Station was featured as one of the many 1875-1899 Madera County era towns in the May 21, 1968, Madera Tribune .  Post Office Service at Bates Station is noted to have been established on November 23, 1883 and ran continuously until October 31, 1903.  The postal name was sourced...

The William Flinn (not Flynn) Highway - Pittsburgh's Misspelled Street

For decades if you traveled along PA Route 8 in Pittsburgh's North Hills suburbs, you would have noticed signs that read "William Flynn Highway" at every intersection.  Even today, many businesses and residences have their addresses listed as XXXX William Flynn Highway.  However, it's not William Flynn Highway, it is William FLINN Highway - and the gentleman who it is named for has a long and storied past in Pittsburgh's infrastructure history. William Flinn was born in England in 1851; however later that year, his family emigrated to the United States and would settle in Pittsburgh.  A 10-year-old school dropout, Flinn grew interested in politics and would join the Allegheny County Republican Party in 1877 as a ward commissioner and a seat on the Board of Fire Commissioners.  Flinn would serve in the Pennsylvania State House of Representatives and Senate from 1877 to 1902. (1) Flinn along with James J. Booth would found the Booth and Flinn construction firm ...