Skip to main content

An I-540 Preview

With the next segment of I-540 about a month away from opening to traffic, I took a small ride out to Western Wake County and took a look at the highway before it opens.

Note: The official exit number is within the parentheses. An error in signing plans caused the exit numbers to be 20 miles off.

Exit 47 (67): NC 55
This exit will be a six ramp partial cloverleaf interchange. This will be the current end of I-540.

Approaching I-540 from NC 55 West in Morrisville.

This time I am on NC 55 East at the interchange. I-540 will include the 'Future' designation. This is because of a rule that says Interstates must end at a National Highway System (NHS) route. NC 55 obviously is not a part of the NHS.

Exit 49 (69): Davis Drive/Research Triangle Park

This exit is an expansive Y-shaped interchange linking I-540 to the heart of Research Triangle Park. The interchange flows into Kit Creek Drive which provides quick access to Davis Drive.

Kit Creek Drive ends as the ramps to/from I-540 begin/end.

A wide view of the expansive I-540/Davis Drive Interchange.

Folks leaving RTP to get on I-540 will come to this split on the on ramp. What's interesting is that the 'Future' tab is missing here.

A full 22x zoom looks over a mile north/east on I-540 towards NC 54 and I-40. I didn't have my tripod with me or the Future East 540 shield that sits behind the 1/2 mile guide sign for NC 54 would be clearer.

Exit 50 (70): NC 54

The last of the three new exits for I-540 will be for NC 54 just on the Northeastern edge of RTP. Unlike the interchange at NC 55, signs aren't up for I-540 nor is the highway opened to four lanes.

Heading east on NC 54 approaching the I-540 interchange. The new travel lanes on the right aren't quite ready for NC 54 East to move onto them. The interchange with I-540 will be a partial cloverleaf known as a folded diamond.

Closed off and unpaved ramps to/from I-540 East at NC 54.

Comments

Anonymous said…
Nice pics! Any sign that they have started land purchase for the next part of the western leg?
Adam said…
There hasn't been any, yet. Once and if the NCTA gets funding from the General Assembly, the land purchases on the Western Wake Expressway will begin.

Popular posts from this blog

Crescent City Connection (New Orleans, LA)

The Crescent City Connection is a massive dual-span steel truss bridge that spans the lower Mississippi River at downtown New Orleans, about 95 river miles upstream from the mouth of the great river at the Head of Passes Light. If counted as a single bi-directional highway bridge, the parallel spans combine to form the single busiest bridge on the Mississippi River and its importance as a linchpin in the region’s transportation network cannot be overstated. While there have been various schemes over the years to construct bridges downriver from Algiers Point, this bridge has been the southernmost bridge on the Mississippi River since its initial construction in the 1950s. The years immediately following the end of World War II were a transformational period in the history of New Orleans. Already one of the great economic and cultural centers of the American Deep South, it was recognized at this time that major changes and improvements to the city’s transportation infrastructure would b...

Old US Route 99 through Tipton, Tulare, and Tagus Ranch

This summer I had a look into the alignment history of US Route 99 through the Tulare County communities of Tipton, Tulare, and Tagus Ranch.  While this slab below might seem like much it is one of the few remaining reminders of how US Route 99 was during the 1920s in Tulare County. This blog is part of the larger Gribblenation US Route 99 Page.  For more information pertaining to the other various segments of US Route 99 and it's three-digit child routes check out the link the below. Gribblenation US Route 99 Page Part 1; the history of US Route 99 in Tipton, Tulare, and Tagus Ranch Tipton and Tulare were both founded in 1872 as sidings of the Southern Pacific Railroad.  The Southern Pacific Railroad laid the groundwork for development of southern San Joaquin Valley.  Previous to the Southern Pacific Railroad travel via wagon or foot in Central California tended to avoid San Joaquin Valley in favor of the Stockton-Los Angeles Road.  The Stockton Los Ange...

Winnemucca to the Sea Highway

The Winnemucca to the Sea Highway was conceived as an idea to establish a continuous, improved route branching from what was then US Highway 40 (now I-80) in Winnemucca, Nevada to the Pacific Coast in Crescent City, California . This highway was to span 494 miles as it crossed through deserts, mountains and forests on its way to the Pacific Ocean. Community leaders from points along this proposed highway formed the Winnemucca to the Sea Highway Association, which worked with state and local governments to obtain funding for the planning, construction and upgrade of the highway. The original proposal was to create one highway, numbered 140, which was to be applied to the complete route as the parent major US highway was coast-to-coast US-40, the Victory Highway. However, this idea never fully came to fruition. Currently, a traveler driving on the Winnemucca to the Sea Highway actually follows seven different highway numbers, which are US 95, NV 140, OR 140, US 395, OR 62, I-5, US 19...