The Center Leg Freeway of the District of Columbia (former Interstate 95, current Interstate 395 and future Interstate 195)


The Center Leg Freeway is a 1.8-mile corridor which is located in the District of Columbia and presently signed as Interstate 395.  The Center Leg Freeway is aligned from the junction of what is presently signed Interstate 695 north to through the Mall Tunnel and 3rd Street Tunnel to US Route 50 at New York Avenue NW.  The Center Leg Freeway was part of the original path of Interstate 95 through the District of Columbia prior to it being realigned onto the eastern Capital Beltway.  During 1976 the Center Leg Freeway was reassigned as a segment of Interstate 395.  During 2021 the Center Leg Freeway was approved to for new designation of Interstate 195.  Featured as the blog cover is a view of Center Leg Freeway facing southward toward the Mall Tunnel from E Street NW.




Part 1; the history of the Center Leg Freeway

Note: much of the history of the Center Leg Freeway is sourced from dcroads.net:


The origin of the Center Leg Freeway began with a 1946 National Capital Planning Commission study which recommended a north/south freeway between the planned K Street Freeway to the South Capital Street Bridge.  Ultimately no action was taken towards constructing a north/south freeway through the District of Columbia.  

During 1955 the Center Leg Freeway reemerged as a part of an 18-mile inner freeway loop proposed De Leuw, Cather & Company.  The Center Leg Freeway was conceptualized with two 1.7-mile corridor alternatives.  The first alternative was included a freeway which a of cut-and-cover tunnel design for the entire corridor length.  The second alternative included a tunnel under the National Mall and an open cut north of Pennsylvania Avenue NW.  

The map below (source: Douglas A Willinger) depicts the Center Leg Freeway as proposed by De Leuw, Cather & Company.


On June 29th, 1956, the Federal Highway Aid Act of 1956 was signed into law on the Federal Level.  During 1958 the planned Center Leg Freeway was assigned as part of the chargeable mileage of Interstate 95.  Interstate 95 as originally planned would have passed through the District of Columbia via the Southwest Freeway, Center Leg Freeway, North Central Freeway and Northeast Freeway.  

By 1963 a short stub of the Center Leg Freeway north from the junction of the Southwest Freeway/Southeast Freeway Interchange was completed.  On November 1, 1965, a coalition District of Columbia Officials approved the final routing of the Center Leg Freeway.   The finalized plan for the Center Leg Freeway included two cut-an-cover tunnels and an otherwise open cover design.  Construction of the Mall Tunnel would begin during 1966 and would open to traffic as part of Interstate 95 on November 5, 1973.  By the time the Mall Tunnel segment of the Center Leg Freeway was completed the future of Interstate 95 in the District of Columbia was up in the air due to the cancellation of the North Central Freeway and Northeast Freeway earlier in the year.  
 
During January 1975 a contract to construct the 3rd Street Tunnel was awarded by the District of Columbia.  Construction of the 3rd Street Tunnel would initially be slowed due to a Federal Lawsuit against the general contractor for discriminatory against minority owned sub-contractors.  

On October 7, 1975, the District of Columbia along with the states of Virginia and Maryland submitted an application to the American Association of State Highway Officials to renumber existing Interstate 95 inside the Capital Beltway as Interstate 395.  Interstate 95 was to be relocated to the eastern Capital Beltway and would serve as a bypass of the District of Columbia.  The American Association of State Highway Officials considered the application for Interstate 395 inside the Capital Beltway on November 11, 1975, conditional approval was given.  




A series of letters dated May-June 1976 between the Virginia Department of Highways & Transportation and the American Association of State Highway Officials noted the Federal Highway Administration had previously designated Interstate 395 over the corridor of the Richmond-Petersburg Turnpike.  The Virginia Department of Highways & Transportation Chief Engineer advised he was unaware the Federal Highway Administration had final numbering authority over the Interstate Highway System.  The Virginia Department of Highways & Transportation Chief Engineer noted he would work with the Federal Highway Administration to free up the Interstate 395 for the Southwest and Center Leg Freeways.     



A letter from the American Association of State Highway Officials dated July 28, 1976, to the Deputy Commission of Viriginia Department of Highways & Transportation noted the Federal Highway Administration withdrew their objection to applying Interstate 395 to what had been Interstate 95 inside the Capital Beltway.  With the withdrawal of objection of the Federal Highway Administration the designation of Interstate 395 was applied to the Southwest Freeway and Center Leg Freeway inside the Capital Beltway.  


The tubes of the 3rd Street Tunnel of the Center Leg Freeway were largely completed by 1978 when the District of Columbia ran out of construction funds.  During 1984 District of Columbia Mayor Marion Barry earmarked a $6,500,000 budget surplus to complete the 3rd Street Tunnel.  The northbound lanes of the 3rd Street Tunnel were opened to traffic on December 15, 1986, whereas the southbound lanes would open on February 6, 1987.  With the opening of the 3rd Tunnel the Center Leg Freeway was completed between New York Avenue NW and the Interstate 695 interchange.  

The Center Leg Freeway and the south portal of the Mall Tunnel can be seen during 1992 in a Library of Congress photo.  


On November 18, 2020, the District of Columbia Department of Transportation Director submitted an application to the American Association of State Highway Transportation Officials to renumber the Center Leg Freeway as Intestate 195.  The request to renumber the Center Leg Freeway included an additional application to realign Interstate 395 onto what was Interstate 695 on the Southeast Freeway.  The primary rationale to renumber the Center Leg Freeway to Interstate 195 and realign Interstate 395 was to ease of motorist confusion.  On July 7, 2021, wtopnews.com reported the American Association of State Highway Transportation Officials and Federal Highway Administration approved the renumbering of Center Leg Freeway as Interstate 195.  








Part 2; scenes around the Center Leg Freeway

From E Street NW the north portal of the Mall Tunnel on the Center Leg Freeway can be observed facing south.  


Traffic departing Union Station is directed to follow westbound H Street NE to reach the Center Leg Freeway.  


Presently the Center Leg Freeway and Interstate 395 have a surface alternate signed for when the tunnels are closed.  Interstate 395 Alternate below can be seen transitioning from southbound 3rd Street NW via righthand turn onto westbound F Street NW.  


Below the entrance to Interstate 395/Center Leg Freeway southbound from the intersection of 3rd Street NW/D Street NW can be observed.  The entrance ramp passes directly under the Frances Perkins Building into the Mall Tunnel.  The Frances Perkins Building was completed atop the Mall Tunnel during 1975.  



The Capitol Reflecting Pool offers no visual indication of the Center Leg Freeway and Mall Tunnel directly below the surface.  The current Capital Reflecting Pool was completed during 1971.  


Below Interstate 395 and the Center Leg Freeway emerge from the Mall Tunnel towards the junction with Interstate 695 at the Southeast Freeway.  Interstate 395 continues southward via the Southwest Freeway.  



Comments

Popular posts from this blog

Sunshine Bridge (Donaldsonville, LA)

Located about halfway between Baton Rouge and New Orleans in southern Louisiana, the Sunshine Bridge spans the lower Mississippi River near the city of Donaldsonville as part of the longer Louisiana Highway 70 corridor, which connects Interstate 10 and Airline Highway (US 61) with US 90 in Morgan City. In the years following World War II, the only bridges across the lower Mississippi River in Louisiana were located in the area of the state’s two largest cities – Baton Rouge and New Orleans. Postwar agricultural and industrial development along the river in this region led to the planning of a series of infrastructure projects in southern Louisiana that were aimed at spurring this development and modernization of the Delta region. One of these projects was known as the Acadian Thruway and was developed in the 1950s as a toll road intended to connect greater New Orleans with Lafayette and points west while providing a high-speed bypass of the Baton Rouge metro area. The Thruway, which

Horace Wilkinson Bridge (Baton Rouge, LA)

Standing tall across from downtown Baton Rouge, the Horace Wilkinson Bridge carries Interstate 10 across the lower Mississippi River between West Baton Rouge and East Baton Rouge Parishes. Unusually, the bridge is actually named for three separate people; three generations of Horace Wilkinsons who served in the Louisiana State Legislature over a combined period of 54 years. Constructed in the 1960s and opened to traffic in 1968, this is one of the largest steel bridges on the lower Mississippi. It’s also the tallest bridge across the Mississippi, with its roadway reaching 175 ft at the center span. Baton Rouge is the northernmost city on the river where deep-water, ocean-going vessels can operate. As a result, this bridge is the northernmost bridge on the river of truly gigantic proportions. Altogether, the bridge is nearly 2 ½ miles long and its massive truss superstructure is 4,550 ft long with a center main truss span of 1,235 ft. The Horace Wilkinson Bridge is one of the largest

Natchez-Vidalia Bridge (Natchez, MS)

  Located about halfway between Baton Rouge and Vicksburg near the city of Natchez, the Natchez-Vidalia Bridge crosses the lower Mississippi River between southwest Mississippi and northeastern Louisiana at the city of Vidalia. This river crossing is a dual span, which creates an interesting visual effect that is atypical on the Mississippi River in general. Construction on the original bridge took place in the late 1930s in conjunction with a much larger parallel effort by the U.S. Army Corps of Engineers to strengthen the area’s flood protection and levee system along the Mississippi River. One of the more ambitious aspects of this plan was to relocate the city of Vidalia to a location of higher ground about one mile downriver from the original settlement. The redirection of the river through the Natchez Gorge (which necessitated the relocation of the town) and the reconstruction of the river’s levee system in the area were undertaken in the aftermath of the Great Flood of 1927, wh