Skip to main content

The Putah Creek Bridge of Monticello (former California State Route 28)

The Putah Creek Bridge was a masonry structure constructed during 1896 by Napa County to serve the community of Monticello.  The Putah Creek Bridge would be annexed into the State Highway System in 1933 when Legislative Route Number 6 was extended from Woodland Junction to Napa.  The Putah Creek Bridge was a component of the original California State Route 28 from 1934-1952.  The span briefly became part of California State Route 128 in 1953 until the highway was relocated as part of the Monticello Dam project in 1955.  Today the Putah Creek Bridge sits at the bottom of the Lake Berryessa reservoir and is accessible to divers.  Pictured as the blog cover is the Putah Creek Bridge as it was featured in the September 1950 California Highways & Public Works.  

California State Route 28 can be seen crossing the Putah Creek Bridge near Monticello on the 1943 United States Geological Survey map of Copay.  


The history of the Putah Creek Bridge

The site of Monticello lies under the waters of the Lake Berryessa reservoir in what was once known as Berryessa Valley.  The Berryessa Valley name is derived from the Berryessa family which was granted the lands of Rancho Las Putas by Mexican Governor Manual Micheltorena during 1843.  The Berryessa sold their stake in Rancho Las Putas to American investors during 1853.  

Rancho Las Putas was subdivided during 1866 and the farming community of Montecillo was plotted.  By 1870 a franchise wagon road from Napa was constructed via a new bridge over Putah Creek.  By 1875 Napa County purchased the road connecting Napa-Monticello and declared it a public highway.  The highway connecting Napa-Monticello can be seen on the 1882 Bancroft's Map of California.  

The history of the Putah Creek Bridge was featured in the September 1950 California Highways & Public Works Centennial Edition.  The Putah Creek Bridge was referenced in the issue as being a notable example of a masonry bridge in the State Highway System (then part of California State Route 28 and Legislative Route Number 6).  The Putah Creek Bridge was constructed during 1896 by Napa County. The structure was cut from native sourced sandstone and was 70 feet long. The article notes the Putah Creek Bridge was subject to being inundated if the construction of Monticello Dam proceeded.





During 1933 Legislative Route Number 6 (LRN 6) was extended from Woodland Junction to Napa by way of Monticello. The extension of LRN 6 annexed the Putah Creek Bridge into the State Highway System.

The initial run of Sign State Routes was announced in the August 1934 California Highways & Public Works.   The Putah Creek Bridge was assigned as a component of the original California State Route 28 which utilized LRN 6 in the Monticello area.  


California State Route 28/LRN 6 can be seen crossing the Putah Creek Bridge near Monticello on the 1935 Division of Highways Map of Napa County.  

California State Route 28/LRN 6 can be seen crossing the Putah Creek Bridge near Monticello on the 1943 United States Geological Survey map of Copay.  


The May/June 1953 California Highways & Public Works announced that California State Route 28 was redesignated as California State Route 128.  The California State Route 28 designation was moved to the north shore of Lake Tahoe to be continuous with the long existing Nevada State Route 28.  


The March/April 1955 California Highways & Public Works depicts the progress of the realignment of California State Route 128/LRN 6 at the site of the 270-foot-high Monticello Dam.  The Monticello Dam project broke ground in 1953 along Putah Creek with the end goal of creating the Lake Berryessa Reservoir.  The construction of Monticello Dam required both California State Route 37 and California State Route 128 be realigned to the south of the planned Lake Berryessa.   California State Route 128/LRN 6 in particular was heavily impacted by the Monticello Dam project as it followed Putah Creek from the outskirts of the Town of Monticello east to the Yolo County Line.  Additionally, the Town of Monticello in Berryessa Valley was slated to be inundated by 100 feet of water.  In total 16.3 miles of new highway was slated to be constructed which was largely comprised of a realigned California State Route 128.  The realigned California State Route 128 would make a brief swing into Solano County near the site of Monticello Dam.   Monticello Dam was topped out during November of 1957, but Lake Berryessa wouldn't fill to capacity until April of 1963.



The newly realigned California State Route 128/LRN 6 south of the planned Lake Berryessa appears on the 1956 Division of Highways State Map.  


The former site of Monticello and location of Putah Creek can be seen on the 1959 United State Geological Survey map of Lake Berryessa.  The Putah Creek Bridge was not demolished during the Monticello Dam project and generally is located 100 feet beneath the waters of Lake Berryessa.  


The Putah Creek Bridge has become a well-known dive site at Lake Berryessa.  Underwater footage from the Putah Creek Bridge can be seen below as it was presented on YouTube in 2011.  

Comments

Bako_Jeff said…
Thank you for sharing. Very detailed and informative.

Popular posts from this blog

Caliente-Bodfish Road

Caliente-Bodish Road is one of the finest driving roads in the southern Sierra Nevada range and has rich history. The approximately thirty-two-mile-long highway connects from Kern River Road in Bodfish south to Bena Road (former US Route 466) via Caliente siding. Caliente-Bodfish Road is a segment of Thomas Baker's stage road which facilitated overland travel to the claims of the Kern River Gold Rush. The Baker Stage Road was constructed during the 1860s-1870s and spanned from the outskirts of Caliente north to the Stockton-Los Angeles Road near Tailholt in Tulare County. The blog cover photo is from the nine-mile segment north of Caliente Creek Road which is known as the "Lion's Trail." Caliente-Bodish Road carries the internal designation of Kern County Road 483. Part 1; the history of Caliente-Bodfish Road Caliente-Bodish Road is a segment of what was Thomas Baker's stage road to Kern River Valley.  The Kern River Gold Rush began in 1853 and spurred devel

The Dummy Lights of New York

  A relic of the early days of motoring, dummy lights were traffic lights  that  were  placed  in the middle of a street intersection. In those early days, traffic shuffled through busy intersections with the help of a police officer who stood on top of a pedestal. As technology improved and electric traffic signals became commonplace, they were also  originally  positioned on a platform at the center of the intersection. Those traffic signals became known as  " dummy lights "  and were common until  traffic lights were moved  onto wires and poles that crossed above the intersection.  In New York State, only a handful of these dummy lights exist. The dummy lights  are found  in the Hudson Valley towns of Beacon and Croton-on-Hudson, plus there is an ongoing tug of war in Canajoharie in the Mohawk Valley, where their dummy light has been knocked down and replaced a few times. The dummy light in Canajoharie is currently out of commission, but popular demand has caused the dummy

Colorado Road (Fresno County)

Colorado Road is a rural highway located in San Joaquin Valley of western Fresno County.  Colorado Road services the city of San Joaquin in addition the unincorporated communities of Helm and Tranquility.  Colorado Road was constructed between 1910 and 1912 as a frontage road of the Hanford & Summit Lake Railway.  The roadway begins at California State Route 145 near Helm and terminates to the west at James Road in Tranquility.   Part 1; the history of Colorado Road Colorado Road was constructed as frontage road connecting the sidings of the Hanford & Summit Lake Railway.  The Hanford & Summit Lake Railway spanned from South Pacific Railroad West Side Line at Ingle junction southeast to the Coalinga Branch at Armona.  The Hanford & Summit Lake Railway broke ground during August 1910 and was complete by April 1912. The Hanford & Summit Lake Railway established numerous new sidings.  From Ingle the sidings of the line were Tranquility, Graham, San Joaquin, Caldwell, H