Skip to main content

Former US Route 99 in Red Bluff (the US Route 99 West and US Route 99 East split)


In this article we look at the history of US Route 99 within the City of Red Bluff in Tehama County, California.  Red Bluff is where US Route 99 split into East and West Routes through Sacramento Valley.

This blog is part of the larger Gribblenation US Route 99 Page.  For more information pertaining to the other various segments of US Route 99 and it's three-digit child routes check out the link the below.



Part 1; the history of US Route 99 in Red Bluff

Historically US Route 99 ("US 99") entered Red Bluff headed southbound via Main Street on what was Legislative Route Number 3 ("LRN 3").  As US 99 headed south on Main Street it picked up California State Route 36 ("CA 36") eastbound at Beagum Road which was carried by LRN 29.  US 99 south/CA 36 east continued south on Main Street/LRN 3 to downtown Red Bluff.  At the intersection of Main Street and Antelope Boulevard US 99 split into a East/West Route.  US 99E south turned eastbound along with CA 36 eastbound over the Sacramento River via Antelope Boulevard/LRN 3.  On the outskirts of Red Bluff CA 36 east split from US 99E south via LRN 29 towards Lassen Volcanic National Park.  US 99E make a southward turn towards Marysville and Roseville via LRN 3.  The route of US 99W was far more conventional as it headed directly south on Main Street via LRN 7 towards Woodland.  The below illustration depicts the historic alignments of; US 99, US 99E, US 99W, and CA 36 in Red Bluff. 

Red Bluff is the Tehama County Seat and lies at an elevation of 305 feet above sea level due to it being located on the floor of Sacramento Valley.  When gold was discovered in Yreka in 1851 it led to a rush which took travelers through Sacramento Valley.  The rush to Yreka led to a small community developing at the confluence of Reeds Creek and the Sacramento River.  The community was originally known as Leodocia and Covertsburg before Post Office Service opened as "Red Bluff" in October 1853.  The name "Red Bluff" comes from formations near the community which were once apparent on the Sacramento River.  When Tehama County was created in 1856 the community of Tehama was the initial County Seat but it was moved to Red Bluff in 1857.  The Southern Pacific Railroad reached Red Bluff in 1872 and the community incorporated as a City in March of 1876.  

Red Bluff can along the Southern Pacific Railroad on the 1873 Oregon, California, & Nevada Railroad Map.  

 
 
The emergence of the automobile led to the 1909 First State Highway Bond Act which was approved by voters during 1910.  The majority of the highways approved as part of the First State Highway Bond Act were largely well established routes of travel.  In the case of Red Bluff it was along the path of what would become LRN 3 and the north terminus of LRN 7.  According to CAhighways.org the original definition of LRN 3 was as follows:

"Sacramento to the Oregon Line."

According to CAhighways.org the original definition of LRN 7 was as follows:

"Tehama Junction to Benicia."
 
Note; Tehama Junction was simplified to "Red Bluff" when LRN 7 was codified in 1935.

By 1913 the Pacific Highway was created as a major Auto Trail between San Diego and Vancouver, British Columbia.  The Pacific Highway followed Main Street via LRN 3 into downtown Red Bluff.  From downtown Red Bluff the Pacific Highway followed LRN 7 towards Woodland and Davis.  A very early LRN 3 and LRN 7 through Red Bluff  can be seen on the 1917 California State Automobile Association Map.  Note; the 1917 California State Automobile Association Map shows LRN 7 ending in Tehama at LRN 3 which would account for it's original definition above. 

Very early survey descriptions of LRN 3 and LRN 7 can be found on the January 1915 Highway Bulletin.  LRN 7 is described as having an end point at LRN 3 at Tehama Junction (Tehama). 

 
The 1918 Division of Highways Map shows LRN 7 extended to Red Bluff as LRN 3 is shown following the east bank of the Sacramento River north of Tehama on a new alignment. 


LRN 3 was eventually realigned over the 1915 Paynes Creek Slough Bridge, 1915 Samson Slough Bridge, and 1916 Kauffman Causeway when the State purchased the right of way.  The Paynes Creek Slough Bridge and Samson Slough Bridge can both can be found on what is now Belle Mill Road.  The 1915 Paynes Creek Bridge can be view on this link on Bridgehunter.com where as the 1915 Samson Slough Bridge can be viewed on this link.  The Kauffman Causeway no longer stands but was located west of the Samson Slough Bridge.  Michael McCarty of the Historic US Highway 99 Facebook Group expounded on the Kauffman Causeway:

"The Construction of the Causeway began in August 1915; Ross Construction Co., being the winning contractor. The Causeway opened on 23rd December, 1916. Even though the floor had not been sealed as of yet.  The flooring was done and finished by the Chico Contracting Co., on 17th November, 1917. In 1921 "lighting" was added to the bridge.  The Kauffman Causeway was 2480 ft long, with 31 arches that were 75' from center to center.

The 1947/48 alignment is near the center on the right, which connected to the 2nd Sacramento bridge. Today, the West bound lane is the original side.  The original East side highway alignment with the Kauffman Causeway and the Paynes/Samson Slough bridges to the left.  You can still see the original slab top that use to connect to the original Sacramento river bridge; the Centennial bridge."
 
For context McCarty provided this photo of the Kauffman Causeway:
 
 
The 1920 Clason Highway Map of California shows the Pacific Highway and National Park to Park Highway entering Red Bluff southbound.  South of Red Bluff the Pacific Highway is shown on LRN 7 whereas the National Park to Park Highway is shown following LRN 3.  Note; the National Park to Park Highway was established as an Auto Trail in 1916. 

The initial draft of the US Route System was approved by the Secretary of Agriculture during November of 1925.  The US Route System with in California was approved by California Highway Commission with no changes recommended by January 1926.  The initial alignment of US 99 was largely planned to follow the Pacific Highway through Sacramento Valley.  US 99 is shown on a map published in the 1926 California Highways & Public Works following LRN 3 into Red Bluff and heading south towards Woodland via LRN 7. 


Thusly US 99 appears on the 1925 Rand McNally Map of California as being routed from Red Bluff south on LRN 7 to Woodland. 

 
 
During November of 1926 the US Route System was approved by the AASHO.  It seems that US 99 was approved as a single route from Red Bluff south to Woodland rather than a split route.  US 99 can be seen as a stand alone route from Red Bluff south via LRN 7 to Woodland on the 1927 National Map Company Sectional Map

The January 1928 California Highways & Public Works describes US 99 as a single route heading south out of Red Bluff via LRN 7 towards Davis.   

The AASHO data base has information pertaining to a request made by State Highway Engineer to have US 99 become a split route between Red Bluff south to Sacramento.  In a letter dated June 13th, 1928 the rationale for splitting US 99 into an East/West Route was a two-to-one traffic ratio on LRN 3 on the east bank of the Sacramento River compared to LRN 7 on the west bank.   

The proposed US 99 West/US 99 East split can be seen for the first time on this map (which was scanned upside down in the AASHO database). 

The US 99 West/US 99 East split from Red Bluff to Sacramento was approved by the AASHO on August 6th, 1928.

The first map to display US 99 as a split route south of Red Bluff is the 1930 Division of Highways State Map

During the 1964 State Highway Renumbering much of US 99 in Sacramento Valley was incorporated into Route 5 in anticipation of Interstate 5 being built.  Much of US 99E was retained as part of the new Route 99 between Red Bluff and Wheeler Ridge.  These changes can be seen on the 1964 Division of Highways State Map.  

The opening of Interstate 5 between CA 36 in Red Bluff north to Cottonwood is discussed in the January/February 1965 California Highways & Public Works.  The new segment of Interstate 5 is cited to have opened on July 2nd, 1964.  







The November/December 1965 California Highways & Public Works cites that a new segment of Interstate 5 from Willows north to Red Bluff  was slated to be open by Fall of 1966.  This segment of Interstate 5 would connect to the segment constructed north of Red Bluff.

The 1967 Division of Highways Map shows that US 99 had been decomissioned in California.  What had been US 99W and mainline US 99 in Red Bluff was replaced by Interstate 5.  Former US 99E was replaced with a stand alone CA 36 east on Antelope Boulevard to what was now CA 99.  CA 99 is shown to have a planned realignment from Vina to Interstate 5 near the southern outskirts of Red Bluff.  This planned alignment of CA 99 was never constructed. 


Part 2; a drive on former US Route 99 in Red Bluff

What was US 99W entered Red Bluff headed north on Main Street.  Main Street in Red Bluff is presently signed as I-5 Business.  This photo was taken at Main Street above I-5 Exit 647.  Main Street at Exit 647 is slightly aligned east of where US 99W once was to approximately north to Luther Road.  Note; former US 99W south of Red Bluff to 5th Street near Los Molinos is now part of Sign County Route A8. 

Former US 99W/I-5 Business continues north on Main Street to CA 36 at Antelope Boulevard.  As noted above mainline US 99 continued straight on Main Street co-signed with CA 36 west.  US 99E began at Antelope Boulevard co-signed with CA 36.  The intersection of Main Street and Antelope Boulevard can be seen on in the third photo below.  




Part 3; a drive on former US Route 99 East/California State Route 36 in Red Bluff

From the intersection of Main Street and Antelope Boulevard Former US 99E/CA 36 east crosses the Sacramento River and intersects Interstate 5. 




CA 36 east of I-5 is co-signed as "TO CA 99" on Antelope Boulevard.  At Postmile TEH 44.000 CA 36 east intersects CA 99.  US 99E once split from CA 36 where CA 99 now is signed.  




Part 4; a drive on former US Route 99/California State Route 36 in Red Bluff

CA 36 east enters the City of Red Bluff via Beagum Road, crosses the Union Pacific Railroad and makes a right hand turn onto former US 99/Main Street at Postmile TEH R41.205.  As noted in Part 2 Main Street with in Red Bluff serves as the I-5 Business.


CA 36 east follows Main Street south into downtown Red Bluff.  At Postmile TEH L41.283 CA 36 east makes a left hand turn onto Antelope Boulevard towards the Sacramento River onto what was US 99E.  As previously noted US 99W once began by continuing south on Main Street. 










Further Reading

Continuing north on US Route 99 to Cottonwood? 


Continuing south to Sacramento via US Route 99W?


Continuing south on Sacramento via US Route 99E?

Comments

Popular posts from this blog

I-40 rockslide uncovers old debates on highway

The Asheville Citizen-Times continues to do a great job covering all the angles of the Interstate 40 Haywood County rock slide. An article in Sunday's edition provides a strong historical perspective on how the Pigeon River routing of Interstate 40 came about. And perhaps most strikingly, in an article that ran just prior to the highway's opening in the fall of 1968, how engineers from both Tennessee and North Carolina warned "...that slides would probably be a major problem along the route for many years." On February 12, 1969, not long after the Interstate opened, the first rock slide that would close I-40 occurred. Like many other Interstates within North Carolina, Interstate 40 through the mountains has a history prior to formation of the Interstate Highway System and was also a heated political battle between local communities. The discussion for a road that would eventually become Interstate 40 dates back to the 1940's as the idea for interregional high

Interstate 210 the Foothill Freeway

The combined Interstate 210/California State Route 210 corridor of the Foothill Freeway is approximately 85.31-miles.  The Interstate 210/California State Route 210 corridor begins at Interstate 5 at the northern outskirts of Los Angeles and travels east to Interstate 10 in Redlands of San Bernardino County.  Interstate 210 is presently signed on the 44.9-mile segment of the Foothill Freeway between Interstate 5 and California State Route 57.  California State Route 210 makes up the remaining 40.41 miles of the Foothill Freeway east to Interstate 10.  Interstate 210 is still classified by the Federal Highway Administration as existing on what is now signed as California State Route 57 from San Dimas south to Interstate 10.  The focus of this blog will mostly be on the history of Interstate 210 segment of the Foothill Freeway.   Part 1; the history of Interstate 210 and California State Route 210 Interstate 210 (I-210) was approved as a chargeable Interstate during September of

Former California State Route 41 past Bates Station

When California State Route 41 was commissioned during August 1934 it was aligned along the then existing Fresno-Yosemite Road north of the San Joaquin River.  Within the Sierra Nevada foothills of Madera County, the original highway alignment ran past Bates Station via what is now Madera County Road 209, part of eastern Road 406 and Road 207.   Bates Station was a stage station plotted during the early 1880s at what was the intersection of the Coarsegold Road and Stockton-Los Angeles Road.   The modern alignment bypassing Bates Station to the east would be reopened to traffic during late 1939.   Part 1; the history of California State Route 41 past Bates Station Bates Station was featured as one of the many 1875-1899 Madera County era towns in the May 21, 1968, Madera Tribune .  Post Office Service at Bates Station is noted to have been established on November 23, 1883 and ran continuously until October 31, 1903.  The postal name was sourced from Bates Station owner/operator George Ba