The few clues of the Northern Durham Parkway

Sometimes when you look through a box of maps for the first time in five years, you come across something you may have easily over looked.  Such was the case when I found a 2004 (so rather recent) map of Raleigh.  This map was made by the Dolph Map Company for WakeMed.  In the Northwestern corner of Wake County, there were two items to the map showing roads that are still not in existence 13 years later.

The road is the Northern Durham Parkway - this is a proposed 19 mile highway from US 501 north of Durham to the Raleigh-Durham International Airport.  The first proposals for this highway date back to 1967 when Eno Drive-Gorman Road was listed on the Durham Area Thoroughfare Plan. (1)  Other proposals called the highway the Northwest and Northeast Durham Loop. (2)  The route would serve as a northern and eastern bypass of Durham almost serving as a near loop.  The route was fought vigorously for three decades by the Eno River Association citing concerns for the the Eno River, nearby neighborhoods, and Eno River State Park.

In the late 1990s, Durham County Commissioners and the Durham City Council put together a compromise plan that eliminated the proposed loop west of US 501.  This plan would be called the Northern Durham Parkway. (2)  In December of 2002, it was agreed to go forward with the compromise plan - the Northern Durham Parkway. (3)  The route would now run from Interstate 540 at Exit 2 (Aviation Parkway) north to Interstate 85 and north to Old Oxford Road before turning to the Northwest to end at US 501.

The proposed route of the Northern Durham Parkway/NC 472 - Source: NCDOT
There is at least one example of planning maps that show the full route of the Northern Durham Parkway along the Eno River.  At one of NCDOT's transportation management centers, the route of the proposed Northern Durham Parkway is shown.


The Northern Durham Parkway would have served as a Northern Arc of Interstate 85 in Northern Durham County (Ben Thurkill)
In 2014, NCDOT completed a feasibility study that estimated the cost of completing the highway at between $254 and $361 million.  The price range is dependent on how much of the highway would be built as a freeway vs. how much built as a boulevard.  Section AA which is the Aviation Parkway extension to US 70/Glenwood Avenue would be built as a freeway in all scenarios.  One proposal has the highway being a freeway for sections AA, AB and AC - all the way to Interstate 85. NCDOT has reserved NC 472 for this route.  There is no current discussion proposing, that if the Northern Durham Parkway is built as a freeway from Interstate 540 to Interstate 85, it would be designated as a new Interstate.

Currently, two small sections of the highway are open.  Aviation Parkway from I-540 to Globe Road and a small section of highway called the Northern Durham Parkway off Sherron Road.



In addition, there is a small section of preserved right of way in the Copley Farm area just north of Mineral Springs Road (Section AC).  The preserved width of the right-of-way is 130' to carry a four lane divided highway. (4)

2017 Durham City/County Planning Department map that shows the reserved right of way for the Northern Durham Parkway near Mineral Springs Road (November 2017)
Additional clues to the Parkway's routing come into play with the 2004 Raleigh map find.  The map, as shown below, shows an extension of Aviation Boulevard (the Airport Blvd. notation is in error) beyond its current end at a 'T' intersection with Globe Road to just beyond T.W. Alexander Blvd.  It also shows that the intersection with Globe Road would become a partial-cloverleaf interchange.  This is confirmed in the 2014 NCDOT Feasibility Study.

Aviation (not Airport) Boulevard is shown going north beyond Globe Road towards T.W. Alexander.  This would be great except in 2004 Aviation ended and still ends today at Globe Road. (Dolph Map Co., 2004)
Further, this same map also includes an item that I am not sure is on NCDOT's books anymore.  It is a direct connector from Interstate 540 to the Northern Durham Parkway.  This connector would begin at Interstate 540 between Exits 4 and 7 (Glenwood/US 70 and Leesville Road).  In fact, if you are traveling on I-540 East and look closely you will see what is left of the grading of off and on ramps for the exit to the connector.  They are now overgrown with pine trees, but it's there.



You can somewhat see the grading for the ramps to the Northern Durham Connector Interchange.  What is more obvious is the reserved right of way to the north of Interstate 540.  It appears that the interchange was to be a trumpet interchange with the highway not continuing southwards towards Glenwood Avenue.  However, the 2004 map shows a different type of highway and interchange altogether.

Another highway that isn't there - the 540 connector to the Northern Durham Parkway (Dolph Map Co., 2004)
This shows a full fledged freeway to freeway cloverleaf interchange.  According to Brian LeBlanc, this was never to be a full freeway but a boulevard like connector.  Further supporting that this is just a map error is that a full freeway would be difficult to shoehorn south of I-540 through the number of commercial and light industrial businesses that occupy this corridor. These businesses can clearly be seen in the Google Satellite image earlier in the article.  I do not know if this connector is still a possibility; the 2014 NCDOT study does not include it.

As for the future of this highway, it is pretty much unknown.  It was listed as an unfunded project as late as June 2015.  Additionally, the current State Transportation Improvement Program does not have the project listed.  However, the region's growth will most likely cause the need for this highway to surface in the near future. When that may happen, it is unknown.  But thanks to a trip to the attic and a look through a box of old maps - a little more detail about this planned highway is now known

If you have any information about the Northern Durham Parkway, shoot me a note or leave a comment below.

Sources & Links:

Comments

Anonymous said…
I want to know what is the possibility of Northern Durham Pkwy expansion in near future if it comes into existence in terms of timelines like 2-5yrs or 5-10 yrs from now.
I am planning to buy a house which is near to this Expansion Route and concerned about the future effect on the house.
Anonymous said…
We’re building a home in NE Durham and after reviewing the re-zoning approval, you can see the city/county stills has an interest in maintaining right-of-way for the Northern Durham Pkwy project.

https://durhamnc.gov/AgendaCenter/ViewFile/Item/2029?fileID=7281
Adam said…
Thanks for the information and link! I added to the article the information about the preserved right of way! Thanks again! --Adam

Popular posts from this blog

Tulare Lake returns

During the winter of 2023 California experienced one of the wettest seasons in recent decades.  Enough snow and water were deposited into the Sierra Nevada Mountains that the runoff was enough to partially reform Tulare Lake within San Joaquin Valley.  Tulare Lake was once the largest lake west of the Mississippi River by surface area.  Tulare Lake has been largely dried for the past century due to irrigation divisions and upstream impoundments.  This blog will examine the history of Tulare Lake and its recent return.  Pictured as the blog cover is Tulare Lake from 19th Avenue in Kings County during early May 2023.  Tulare Lake can be seen near its maximum extent below on the 1876 P.Y. Baker Map of Tulare County .   Part 1; the history of Tulare Lake Tulare Lake is the largest remnant of Lake Corcoran.  Lake Corcoran once covered much of the entire Central Valley due to being it being located at a in natural low point from where mountain run-off would accumulate.  Lake Corcoran is thou

Former US Route 101 through Sargent

  Sargent is a ghost town and siding of the Southern Pacific Railroad located in southern Santa Clara County.  The original alignment of US Route 101 was aligned through Sargent via what is now known as Old Monterey Road.  Sargent was bypassed gradually due to shifts of the alignment of US Route 101 which occurred during 1941 and 1950.  Pictured as the blog cover is a view on Old Monterey Road which is now no longer accessible to the general public.  Below is a scan of the 1935 Division of Highways Map of Santa Clara County which depicts the original alignment US Route 101 through Sargent.   Part 1; the history of US Route 101 in Sargent Sargent lies on land which was once part of Rancho Juristac.  During 1856 James P. Sargent purchased Rancho Juristac and plotted what was known as Sargent Ranch.  By 1869 the Southern Pacific Railroad coast line reached the relocated town site of Gilroy.  The Southern Pacific Railroad coast line would be constructed through Chittenden Pass by 1871 whic

California State Route 60/Former US Route 60/70 through the Moreno Valley Badlands west to Riverside

This past month I drove California State Route 60 through the Moreno Valley Badlands westward towards the City of Riverside.  CA 60 through the Moreno Valley Badlands was once part of the corridors of US Route 60 and US Route 70. The present route of CA 60 is a 70 mile (76 counting multiplex) slice of former US 60 between downtown Los Angeles east to I-10 near Beaumont.  The vast majority of CA 60 aside from a small section in the Moreno Valley Badlands is presently a freeway grade. For me CA 60 holds some personal history as it was the route I used most frequently accessing work sites in the Inland Empire circa 2011-2013.  Despite what many others probably would say I always really enjoyed the Moreno Valley Badlands portion of CA 60.  Considering I frequently worked on US 60 through Arizona and New Mexico the route holds even more appeal.  I even have a CA 60 shield hanging up in my garage. Part 1; History of Roadways in the Moreno Valley Badlands CA 60 between B