Interstate 77 in Cleveland


Interstate 77 has a northern terminus located at Interstate 90 (Innerbelt Freeway) in downtown Cleveland, Ohio.  The freeway is carried through the city by the Willow Freeway which has origins as a 1927 concept to realign US Route 21.  Much of the Willow Freeway was constructed prior to the passage of the 1956 Federal Aid Highway Act which established of the Interstate System.  The Willow Freeway was planned as part of Interstate 79 after the Interstate System was established.  The corridor was quickly renumbered as part of Interstate 77 and Interstate 177 (north of planned Interstate 80N) during 1958.  Interstate 177 would ultimately be consolidated into the parent corridor.




Part 1; the history the Willow Freeway and Interstate 77 in Cleveland

Upon the commissioning of the US Route System by the American Association of State Highway Officials (AASHO) on November 11, 1926, the corridor of downtown Cleveland was served by US Route 21.  US Route 21 can be seen entering downtown Cleveland on the 1927 Rand McNally city insert map.  The highway is shown following Brecksville Road, Canal Road, 49th Street, Broadway, Orange Avenue and Ontario Street to a terminus at Public Square in downtown. 


The Willow Freeway was first proposed in 1927 as the new routing of US Route 21.  Planning for the freeway began in May 1935 and was intended to begin at the site of Willow Station near Independence and extend north into downtown Cleveland.  Construction on the corridor broke ground in 1938 with interchange separation between US Route 21 and Ohio State Route 17.  Said interchange would be complete by October 1940 (now part of Ohio State Route 21).

The US Route 21/Ohio State Route 17 interchange can be seen complete on the 1944 Rand McNally map of Cleveland.  Construction of the Willow Freeway corridor would be shelved during World War II.   


Construction of the Willow Freeway would resume in late 1946.  The freeway corridor can be seen completed north from Ohio State Route 17 to Havard Avenue on the 1948 Rand McNally map of Cleveland.  US Route 21 is shown using a jog from the northern freeway terminus on Havard Avenue to reach 49th Street.  


Construction of the Willow Freeway north to Broadway would begin during early year 1950.  The corridor can be seen completed as the new alignment of US Route 21 to Broadway on the 1956 Rand McNally map of Cleveland.  


The Federal Aid Highway Act of 1956 was signed into law on June 29 of said year.  The act birthed the Interstate Highway System and would add the construction of the remaining segment of the Willow Freeway as a chargeable corridor.  

The Willow Freeway corridor was originally assigned as a segment of Interstate 79.  The number appears on the August 14, 1957, "Official Route Numbering For The National System Of Interstate And Defense Highways "map created by AASHO. 



During the finalization of the Interstate route numbers the Willow Freeway corridor would be assigned as Interstate 77 and Interstate 177.  The segment of Interstate 177 was intended to connect the Troy Lee James Freeway north to the Innerbelt Freeway.  

The rerouting of Interstate 77 into downtown Cleveland appears in a State of Ohio Department of Highways numbering proposal letter to AASHO dated August 8, 1958.  Interstate 77 was intended to be carried west from the Cleveland area towards Toledo west which included multiplexes of Interstates 80N, Interstate 80 and Interstate 90.  Interstate 77 was proposed in the same letter to be realigned into downtown Cleveland onto the Interstate 177 segment of the Willow Freeway.  Interstate 177 was intended to end at the Innerbelt Freeway (then planned as Interstate 71). 




The renumbering proposal letter included a map depicting the layout of the planned Interstate System in Cleveland.  Interstate 77 was proposed to enter the city of Cleveland northbound via the Willow Freeway.  The highway would intersect Interstate 80N (Troy Lee James Highway) near Industrial Valley and continue to a terminus at Interstate 71 (Innerbelt Freeway) in downtown.  


The AASHO Executive Committee advised the State of Ohio Department of Highways that their renumbering proposal was approved in a letter dated November 10, 1958.  This measure functionally made the corridor of Interstate 77 ending in downtown Cleveland active.  During the late 1950s the Willow Freeway would be extended over Kingsbury Run to the then under construction Innerbelt Freeway.  


The completed Willow Freeway north of Kingsbury Run can be seen in detail on the 1963 United States Geological Survey map of Cleveland South.  Interstate 77 and US Route 21 can be seen running concurrent into Cleveland towards Broadway.  US Route 21 is shown splitting away into downtown via Broadway.  


On May 9, 1966, the Ohio Director of Highways submitted an application to AASHO for the deletion of US Route 21 in the state pending the completion of Interstate 77.  Conditional approval was granted by the AASHO Executive Committee on October 14, 1967.  AASHO required US Route 21 be only truncated to US Route 50 Alternate in Murietta near the Ohio/West Virginia state line.  Ultimately US Route 21 signage in Ohio was first omitted in the state on the 1971 State Map edition.  This effectively meant that the lengthy concurrency between US Route 21 and Interstate 77 in Ohio was void.  The last section Interstate 77 to open was in Independence during 1976. 









Part 2; scenes along Interstate 77 in the Cleveland area

Pictured is westbound Rockside Road intersecting Interstate 77 in Independence.  



From Rockside Road northbound Interstate 77 traffic can also merge onto Interstate 480.


Northbound Interstate 77 passes through Cuyahoga Heights and Newburgh Heights before entering Cleveland proper at Fleet Avenue.  The freeway intersects Ohio State Route 14 (Broadway Avenue) at Exit 161A.


Interstate 77 northbound Exit 161B intersects Interstate 490 (westbound) and Ohio State Route 10 (eastbound).  Interstate 490 is signed as a connector route to Interstate 71.  




As northbound traffic approaches Exit 162A (Woodland Avenue and 30th Street) an overhead gantry announces Interstate 77 as ending within 1.5 miles.   Exit 162A is signed as access to westbound Ohio State Route 10.  



Northbound Interstate 77 enters downtown Cleveland and intersects numerous Exits for surface streets.  Interstate 77 terminates at a ramp onto eastbound Interstate 90/Innerbelt Freeway with little ceremony.  The highway ends at a vista of the Cleveland skyline.  









Part 3; RoadwayWiz on Interstate 77 in Cleveland

During 2012 Dan Murphy of the RoadwayWiz YouTube channel featured a real-time drive along northbound Interstate 77 in Cleveland.  

Comments

Popular posts from this blog

Ghost Town Tuesday; The Packard Plant and Michigan Central Station

A couple years back I was in Metro Detroit, against my better judgement I decided on a ruins hunt in the City. Why am I featuring a city of 673,000 approximate residents on a Ghost Town Tuesday?   The reason is two fold; back in 1950 the City of Detroit had an approximate population of 1,850,000 residents at the height of the Domestic Automotive Industry.  A common definition of a "ghost town" is either an abandoned place or a place that has lost the vast majority of it's population.  With a almost 63.6% population decline the City of Detroit would certainly meet the criteria of a place that has lost most of it's population.  The second reason is simply that Detroit is the City I was born in and the truth is that I don't have many photos from when it wasn't a civic corpse. For whatever reason the day I picked to go to downtown Detroit had to be one of the most gloomy late summer days I've ever seen in Michigan.  The rain was coming down pretty hard ...

The Tale of Tollhouse Road, western California State Route 168 and failed Piute Pass Highway

Western California State Route 168 is entirely located in Fresno County and is linked historically to the Tollhouse Road corridor.   Tollhouse Road is one of the oldest highways in the Sierra Nevada range of Fresno County. The corridor presently begins in at Clovis Avenue in downtown Clovis and extends northeast to Huntington Lake. In 1866 the Woods Brothers established mining claims on Pine Ridge. In 1867 Fresno County would grant the brothers a toll franchise to construct a roadway to the desirable logging areas atop Pine Ridge and near Dinkey Creek. The Woods would establish a tollhouse at the start of their franchise road and lumber mill. The lumber mill attracted settlers which led to the establishment of the mountain town of Tollhouse. Fresno County would purchase the Tollhouse Road in 1878 and make it a public highway. The county would remove the tolls and incorporate the corridor into the existing county road network. Prior to the establishment of Clovis in 1...

The James Dean Memorial Junction interchange (California State Routes 41 and 46)

The James Dean Memorial Junction interchange structure opened during June 2025 as a grade separation between California State Routes 41 and 46 in Cholame Valley.  This interchange structure is located a short distance eastward from the infamous 1955 crash site which took the life of actor and racecar driver James Dean.  The crash site was once a Y-junction between US Route 466 and California State Route 41 which was reconfigured in 1959.  This blog will examine the history of the highway junction in Cholame Valley from stage route times through the US Route 466-era and into construction period of the current interchange. Part 1; the history of James Dean Memorial Junction James Dean Memorial Junction is located in Cholame Valley of eastern San Luis Obispo County.  Long before the existence of the State Highway System this valley has served as the junction for the highways crossing Polonio Pass and Cottonwood Pass in the Temblor Range.  The so-called Lemoore Road...