Skip to main content

Tour of the Triangle Expressway

On Saturday, December 10th, I took a drive to check out the newly opened NC 147 Extension and what will become on Janurary 3rd - the state's first toll road.

Of course, the entire photoset from the trip is on flickr.

066

Right before Thanksgiving, a number of us got a sneak peak at the new highway during the Expressway Trot, a 5k that went from Hopson Road to Interstate 40 and back.  Obviously, this time I was driving on it, and not running.  So let's take a look at some of the signs approaching NC 147 from I-40 and NC 147 itself.

The VMS's on I-40 in both directions announced the new highway's opening.

006

The overheads on I-40 at I-540 have been updated for the eventual extension of the Triangle Expressway and NC 540.  Some of the signs are quite gigantic.

007

The signs at NC 147 have been updated as well.  Any of the signs for the entrance to the toll road read: "NC Quick Pass" or "Bill by Mail".  Note the Exit 278 sign.  It should read "NC 55 / TO NC 54"

012

The Exit Gore on I-40 for NC 147 South read "TOLL EXIT" which I had not seen before, but I am guessing is MUTCD standard.

017

And here we are on NC 147 South TOLL.

023

This overhead is quite the size.  It's for the directional Y interchange where NC 147 meets NC 540.  Note a few things on the sign.  One NC 540 changes from East/West here (I-540 is also signed as East/West) to North/South. Also, there's space for when NC 540 becomes Toll and eventually for TO US 1 South and possibly US 64.

028

When you get to Exit 1 - you will notice ghost ramps stubs for a four lane highway.  This will one day head to Cary and meet the McKrimmon Parkway.

033

Now we're headed North on NC 540 approaching the new Exit 67 for NC 147 and the Triangle Expressway.

042

Exit 67 had previously led to Davis Drive at Kit Creek Road.  Now, Exit 67 is a high powered, free-flowing, fast moving, expressway to expressway interchange. (If I said freeway, it would be misleading since both roads will soon be tolled.)

Speaking of tolling, here's what the all electronic toll booths look like.  This is where NC 540 will transition from free to toll and vice versa.  These toll booths will remain inactive to later in 2012 when the TriEx and NC 540 is extended southwards towards Apex and eventually Holly Springs.

046

Now I am on NC 540 West/South approaching NC 147.

052

There wasn't a lot of traffic this Saturday afternoon.  It was about 12:30 when I took this photo.  It'll be interesting to see if this is what the highway will look like once the tolls begin on January 3rd.

057

An interesting oddity on NC 147, the Davis Drive/Hopson Road Interchange has a different exit number in each direction.  Southbound it is Exit 3 - and Hopson Road is the first access point.  Northbound is Exit 2 with Davis Drive it's first access point.  Here is the Exit 2 off ramp at Hopson Road.  Davis Drive traffic wanting to reach NC 147 North would also see this sign.

060

Here is an example of what the toll schedule signs look like.

064

Here's an example of the milemarkers that will be on the Triangle Expressway.  Really nothing different than what is already used.

068

One of the nicer signs on the highway is this guide sign 'END TOLL 147'/'BEGIN NC 147' combination located where NC 147 meets I-40 (Exit 5).

069

Finally, when driving for the second time down NC 147 Toll, I took a quick glimpse at where NC 147 had jogged southwest towards TW Alexander Drive.

078

I had noticed the back of the old I-40 Exits 5A-B guide sign that stood at the then beginning of NC 147.  The shot is zoomed in as the old road is fenced off.  NC 147 had ended at a stoplight at TW Alexander, which is now removed.  Here is what it looks like today.

080

I am sure it will be a matter of time until the guide sign and pavement is removed.

Overall, I like the new road.  The signs are pretty sharp and have some new changes that we're not used to seeing here in North Carolina.  I'm looking forward to seeing the NC 540 extension when it opens later in 2012.



Comments

Charlie said…
Not that I'm planning to be anywhere near the Triangle in the near future, but is NC Quick Pass E-ZPass compatible? I know Florida's SunPass isn't, but Virginia uses E-ZPass.
Bob Malme said…
Glad they kept 'my' exit numbers on 540. Too bad they didn't go with purple signs like the first maps hinted at. With all the 'toll' signage they put up, I'm surprised a small yellow banner didn't find its way on top of the mileposts.
As for compatibility with E-ZPass, not yet. The NC legislature has to pass privacy protection laws for motorists using the transponders that is identical to those in all other E-ZPass states first.
Laura said…
On Thursday at 4:30 p.m., there was the same amount of traffic that you saw on Saturday. Will definitely be interesting to see what it looks like with the toll. If it looks like that all the time, I'll happily pay cash$money to use it to bypass all the traffic on 40 from NC 147 to 540. :-)

BTW, nice writeup and good pictures!
Brian said…
If there's only controlled access through interchanges, it isn't misleading at all to call the TriEx a freeway, as that's how that word is defined (not whether the road carries tolls).

Popular posts from this blog

Paper Highways: The Unbuilt New Orleans Bypass (Proposed I-410)

  There are many examples around the United States of proposed freeway corridors in urban areas that never saw the light of day for one reason or another. They all fall somewhere in between the little-known and the infamous and from the mundane to the spectacular. One of the more obscure and interesting examples of such a project is the short-lived idea to construct a southern beltway for the New Orleans metropolitan area in the 1960s and 70s. Greater New Orleans and its surrounding area grew rapidly in the years after World War II, as suburban sprawl encroached on the historically rural downriver parishes around the city. In response to the development of the region’s Westbank and the emergence of communities in St. Charles and St. John the Baptist Parishes as viable suburban communities during this period, regional planners began to consider concepts for new infrastructure projects to serve this growing population.  The idea for a circular freeway around the southern perimeter of t

Hernando de Soto Bridge (Memphis, TN)

The newest of the bridges that span the lower Mississippi River at Memphis, the Hernando de Soto Bridge was completed in 1973 and carries Interstate 40 between downtown Memphis and West Memphis, AR. The bridge’s signature M-shaped superstructure makes it an instantly recognizable landmark in the city and one of the most visually unique bridges on the Mississippi River. As early as 1953, Memphis city planners recommended the construction of a second highway bridge across the Mississippi River to connect the city with West Memphis, AR. The Memphis & Arkansas Bridge had been completed only four years earlier a couple miles downriver from downtown, however it was expected that long-term growth in the metro area would warrant the construction of an additional bridge, the fourth crossing of the Mississippi River to be built at Memphis, in the not-too-distant future. Unlike the previous three Mississippi River bridges to be built the city, the location chosen for this bridge was about two

Memphis & Arkansas Bridge (Memphis, TN)

  Like the expansion of the railroads the previous century, the modernization of the country’s highway infrastructure in the early and mid 20th Century required the construction of new landmark bridges along the lower Mississippi River (and nation-wide for that matter) that would facilitate the expected growth in overall traffic demand in ensuing decades. While this new movement had been anticipated to some extent in the Memphis area with the design of the Harahan Bridge, neither it nor its neighbor the older Frisco Bridge were capable of accommodating the sharp rise in the popularity and demand of the automobile as a mode of cross-river transportation during the Great Depression. As was the case 30 years prior, the solution in the 1940s was to construct a new bridge in the same general location as its predecessors, only this time the bridge would be the first built exclusively for vehicle traffic. This bridge, the Memphis & Arkansas Bridge, was completed in 1949 and was the third