Skip to main content

FHWA Secretary Discusses I-73 in SC

According to the article linked in the title from a news conference held today in Florence, SC, FHWA secretary Ray LaHood "was positive it (I-73) will get some federal funding. The interstate would start in Michigan, pass through Ohio and two other states.

Supporters of I-73 were thrilled to have LaHood in their backyard, discussing the virtues of their favorite road. But their enthusiasm depends on what Congress does with a new transportation funding bill that will come up next year."

"LaHood says, next year, President Barack Obama will put a 6-year, $500-billion transportation funding bill before Congress. He says I-73 is a perfect fit for that bill. "If this is South Carolina's priority, if this is the region's priority, I have no doubt it will be a part of the 6-year plan."

I-73 supporters have been waiting a long time. Chamber of Commerce leaders told LaHood, the interstate was first proposed in 1980, when textiles and tobacco were South Carolina's big industries."

"LaHood said one factor that will help ensure funding, is to push the multi-state coalition, getting states like Michigan and Ohio involved. He says there's more power when states work together.

Supporters say construction of I-73 would create 38,000 jobs over five years. The interstate would start in Michigan, pass through Ohio, West Virginia, Virginia, and North Carolina near Highway 52. The interstate would then intersect with I-95, head toward Myrtle Beach and connect with Highway 501 before merging with Highway 22, the Conway Bypass. Highway 22 would actually become I-73."

The article has a couple news video links with LaHood's remarks. The I-73/74 Association's idea to bring back Ohio and Michigan back to the table is to add I-75 to the Priority Corridor. What do you do though when you have a Washington Rally to discuss this with corridor politicians, most of whom had left town already (oops). You make news by renaming your association the I-73/74/75 Association. Don't look for this news on their web site, as usual it hasn't been updated in a couple months.

Meantime, here's the Michigan perspective on what happened in DC and SC:

http://www.uppermichiganssource.com/news/story.aspx?list=~\home\lists\search&id=523218

Comments

Frank Brosnan said…
Michigan should not be a priority for I-73. If they are not smart enough to figure the potential economic benefit that the highway would bring to the region then start the road in Toledo and allocate the funds to building the road in the states that want it.

Popular posts from this blog

I-40 rockslide uncovers old debates on highway

The Asheville Citizen-Times continues to do a great job covering all the angles of the Interstate 40 Haywood County rock slide. An article in Sunday's edition provides a strong historical perspective on how the Pigeon River routing of Interstate 40 came about. And perhaps most strikingly, in an article that ran just prior to the highway's opening in the fall of 1968, how engineers from both Tennessee and North Carolina warned "...that slides would probably be a major problem along the route for many years." On February 12, 1969, not long after the Interstate opened, the first rock slide that would close I-40 occurred. Like many other Interstates within North Carolina, Interstate 40 through the mountains has a history prior to formation of the Interstate Highway System and was also a heated political battle between local communities. The discussion for a road that would eventually become Interstate 40 dates back to the 1940's as the idea for interregional high

Interstate 210 the Foothill Freeway

The combined Interstate 210/California State Route 210 corridor of the Foothill Freeway is approximately 85.31-miles.  The Interstate 210/California State Route 210 corridor begins at Interstate 5 at the northern outskirts of Los Angeles and travels east to Interstate 10 in Redlands of San Bernardino County.  Interstate 210 is presently signed on the 44.9-mile segment of the Foothill Freeway between Interstate 5 and California State Route 57.  California State Route 210 makes up the remaining 40.41 miles of the Foothill Freeway east to Interstate 10.  Interstate 210 is still classified by the Federal Highway Administration as existing on what is now signed as California State Route 57 from San Dimas south to Interstate 10.  The focus of this blog will mostly be on the history of Interstate 210 segment of the Foothill Freeway.   Part 1; the history of Interstate 210 and California State Route 210 Interstate 210 (I-210) was approved as a chargeable Interstate during September of

White Rock Road; the historic highway corridor serving Mariposa County since the 1850s

White Rock Road is a twenty-eight-mile-long highway corridor which begins at the Chowchilla River in Merced County and ends at Old Highway 18 in Mariposa County near the town site of Bridgeport.  The portion of White Rock Road between the Merced County and Mariposa County line to Bridgeport (via the town site of White Rock) is one of the oldest continuously used highway corridors in California.  Once known as the "Mariposa River Road" the corridor was developed in the 1850s as one of the two primary highways to the mining communities of Mariposa County.   White Rock Road was bypassed in 1918 when Legislative Route Number 18 was completed between Merced and Mariposa.  The corridor was for time known as Mariposa and Le Grand Road prior to the construction of Mariposa Creek Dam (formerly Mariposa River) in 1948.  Following construction of the dam the roadway took the name it has now and was extended through Merced County to the Chowchilla River.  Much of modern White Rock Road i