First Tour of the TriEx in 2010

Adam Prince and I took a Sunday morning tour to check out construction of the Triangle Expressway, NC's first Toll Road. I had not been down to check progress since I first toured the area last fall. The TriEx (as the Turnpike Authority is trying to get potential users to call it) is made up of 2 parts: The Triangle Parkway (an extension of NC 147) and the Western Wake Freeway, an extension of NC 540 from NC 55 north of Apex to the NC 55 Bypass in Holly Springs.
Here's a map to help explain the two parts and to identify the locations where we went on this trip (map excerpt taken from NCTA 2009 Annual Report, p. 17):
We expected to see more progress on the Triangle Parkway than the Western Wake Freeway, but it turns out it was the exact opposite. The contractors (who are working under the name The Raleigh Durham Roadbuilders, very original) started tree cutting and landscaping at the northern end of the Triangle Parkway, starting where it will depart from the existing NC 147:
Above is a photo from the southbound lanes while below is a view going northbound:
The tree cutting and landscaping continues, but only as far as just south of the US EPA complex. Here's a view north from the end of the cutting back toward Hopson Road, which will have the one of the two interchanges on the parkway (the other being for Davis Drive, number 3 in the map above:
Here's a view from the overlook on the other side of the road:
The ground overlooking the above view will be used as part of building a bridge for the road/ parkway intersection. The dimensions of the bridge were marked by stakes like below:
This was on the west side of the Parkway right-of-way, a similar stake was marked on the east side. Here was some of the equipment doing preliminary work on the bridge:
There was no work going on here, in contrast to where we went next, the current end of NC 540 at Exit 66:
Notice the cars parked on the left for contractors doing work even on Sunday.
Now an indulgence:
A closeup of the Exit 66A gore sign. Since I'm partially responsible for the taped over number, and the map shows different interchange numbers, I thought I'd take a photo before 'my exit numbers' were possibly removed.
Now back to the overview of construction progress:
The crane truck seen two photos above. Where this equipment and road closed signs are, is where the groundbreaking took place last fall, not even the potted plants remain. Here's a view beyond the barriers:
Just in case you wanted to see an official sign as who is constructing the parkway:
You can tell their tree cutting is very environmental from the color of the highway and the flower in the middle of the logo (plus you can work on your Spanish).

We thought that there would not be much tree cutting and landscaping work for this part of the Expressway as for the Parkway. Turns out there was more. The clearing proceeds further south, over McCrimmon Parkway, just to the west of Panther Creek High School, and all the way to Carpenter Fire Station Road in Cary (that's just about where the purple NC 540 shield is in the map above, if you're not familiar with the area). We plan to go out again in late March to get the next update on construction. The NCTA still says the Triangle Parkway will be open in 2011.

Comments

Anonymous said…
Thank you for updating us, esp since the news and county don't seem to care to. Really wished they were further along.
Anonymous said…
Let's get some of the stimulus $$$ to build it quicker. We can surely use the 64 to US1 section as soon as possible. Every day I go against the traffic it will be great to see the fuel economy savings as folks avoid the traffic.
Anonymous said…
Well this week April 5-9 they have cleared Kitt Creek/540 to Davis, I imagine Davis to hopason next week for the Triangle parkway.
They are moving fast. Once those crews go in, they clear many acres a day.

Popular posts from this blog

Crescent City Connection (New Orleans, LA)

The Crescent City Connection is a massive dual-span steel truss bridge that spans the lower Mississippi River at downtown New Orleans, about 95 river miles upstream from the mouth of the great river at the Head of Passes Light. If counted as a single bi-directional highway bridge, the parallel spans combine to form the single busiest bridge on the Mississippi River and its importance as a linchpin in the region’s transportation network cannot be overstated. While there have been various schemes over the years to construct bridges downriver from Algiers Point, this bridge has been the southernmost bridge on the Mississippi River since its initial construction in the 1950s. The years immediately following the end of World War II were a transformational period in the history of New Orleans. Already one of the great economic and cultural centers of the American Deep South, it was recognized at this time that major changes and improvements to the city’s transportation infrastructure would b...

Old US Route 99 through Tipton, Tulare, and Tagus Ranch

This summer I had a look into the alignment history of US Route 99 through the Tulare County communities of Tipton, Tulare, and Tagus Ranch.  While this slab below might seem like much it is one of the few remaining reminders of how US Route 99 was during the 1920s in Tulare County. This blog is part of the larger Gribblenation US Route 99 Page.  For more information pertaining to the other various segments of US Route 99 and it's three-digit child routes check out the link the below. Gribblenation US Route 99 Page Part 1; the history of US Route 99 in Tipton, Tulare, and Tagus Ranch Tipton and Tulare were both founded in 1872 as sidings of the Southern Pacific Railroad.  The Southern Pacific Railroad laid the groundwork for development of southern San Joaquin Valley.  Previous to the Southern Pacific Railroad travel via wagon or foot in Central California tended to avoid San Joaquin Valley in favor of the Stockton-Los Angeles Road.  The Stockton Los Ange...

Former US Route 101 and California State Route 41 through Paso Robles

Paso Robles is a city located on the Salinas River of San Luis Obispo County, California.  As originally configured the surface alignments of US Route 101 and California State Route 41 converged in downtown Paso Robles.  US Route 101 originally was aligned through Paso Robles via Spring Street.  California State Route 41 entered the City of Paso Robles via Union Road and 13th Street where it intersected US Route 101 at Spring Street.  US Route 101 and California State Route 41 departed Paso Robles southbound via a multiplex which split near Templeton.   Pictured above is the cover of the September/October 1957 California Highways & Public Works which features construction of the Paso Robles Bypass.  Pictured below is the 1935 Division of Highways Map of San Luis Obispo County which depicts US Route 101 and California State Route 41 intersecting in downtown Paso Robles.   Part 1; the history of US Route 101 and California State Route 41 i...