Skip to main content

The Carolina Bays Parkway Extension to North Carolina is getting a fresh new look

Since the last time the Carolina Bays Parkway was mentioned on this blog, Bob moved north and my family doubled in size (we now have two boys along for our adventures).  In that January 2010 entry, I mentioned how South Carolina State Representative Tracy Edge asked SCDOT to begin studying an extension of the route into North Carolina.

Now it's the Summer of 2016 and NCDOT has selected an engineering firm to begin conducting an environmental study of six alternatives that will connect US 17 at Hickman Road to the existing Carolina Bays Parkway (SC 31) at SC Highway 9.  This would be the first step in selecting and eventually building the six lane freeway that is estimated to cost between $202 and 280 million.

At this time, there is no overall plan or schedule to build the eventual link.

Story Link: Remember the Carolina Bays Parkway extension? It might be back. ---Wilmington Star-News

Editors Note: With this post our total entries for 2016 (13) has exceeded the combined total of the past two years (12).  With any luck we may blow past the 2013 total of 16!  Amazing what a semester off of grad school can do!

Comments

Popular posts from this blog

Where the hell is Hill Valley? (US Route 8 south/US Route 395 east)

Recently I made a visit to Universal Studios near Los Angeles.  While on the back lot tour I came across a piece of infamous movie-borne fictional highway infamy; the location of town square of Hill Valley, California on US Route 8/US Route 395. The above photo is part of the intro scene to the first Back-to-the-Future movie which was set in 1985. To anyone who follows roadways the signage error of US 8 meeting US 395 in California is an immediately notable error.  For one; US 8 doesn't even exist anywhere near California with present alignment being signed as an east/west highway between Norway, Michigan and Forest Lake, Minnesota.  To make matters worse US 8 is signed as a southbound route and US 395 (a north/south highway) is signed as an eastbound route.  At minimum the cut-out US 8 and US 395 shields somewhat resemble what Caltrans used in the 1980s. Assuming Hill Valley is located on what would have been US 395 by 1985 what locales would be a viable real world analog? 

Legend of the Ridge Route; a history of crossing the mountains between the Los Angeles Basin and San Joaquin Valley from wagon trails to Interstates

Over the past two decades I've crossed the Interstate 5 corridor from Los Angeles north over the Sierra Pelona Mountains and Tehachapi Range to San Joaquin Valley what seems to be an immeasurable number of times.  While Interstate 5 from Castaic Junction to Grapevine via Tejon Pass today is known to most as "The Grapevine" it occupies a corridor which has been traversed by numerous historic highways.  The most notable of these highways is known as the "Ridge Route."  This article is dedicated to the Ridge Route and the various highways that preceded it.  The Ridge Route is a 44 mile section of highway which was completed in 1915.  The Ridge Route originally stretched from Castaic Junction north over Liebre Summit and Tejon Pass to the tiny community of Grapevine.  In spite of a roadway that once utilized nearly 700 curves the Ridge Route is generally considered far ahead of it's time and one of the first modern highways constructed for automotive use. 

Closing the Gap - How Interstate 77 in North Carolina and Virginia Came To Be

Interstate 77 through the Virginias and Carolinas was not an original Interstate Highway proposal.  In 1957, Interstate 77 was born as an over 400-mile southwards extension of a previously approved Cleveland to Canton, Ohio Interstate.  The new road would extend through four states before terminating at Interstate 85 near Charlotte, North Carolina.  This extension would bring an additional north-south highway connecting the industrial Midwest to the South.   During the early planning stages of Interstate 77 from the late 1950s through the mid-1960s, North Carolina and Virginia had different plans routing the Interstate that took over five years to settle. While the new Ohio to Charlotte Interstate would follow the WV Turnpike to its terminus at US 460 near Princeton, its route through the remainder of West Virginia, Virginia, and North Carolina was uncertain.  The route south from Princeton into Virginia and to Interstate 81 near Wytheville consisted of two options.  An eastern option