Skip to main content

Is Virginia considering to extend I-785 further North?

Though it's not even a signed route, Interstate 785 may be extended further north within Virginia.  The 'Future' Interstate, which is to run from I-85 east of Greensboro, NC then follow US 29 to Danville, Virginia, was first came into existence in 1997 when AASHTO approved the designation.  In 1998, Congress passed a bill authorizing the designation.  Later that same year, a "public announcement" was held trumpeting the new Interstate.

Fast forward another 13 years to the present, and the Virginia State Assemblyman, Daniel W. Marshall, III (R), proposed a resolution (HB 2481) to extend Interstate 785 northwards along US 29 to Altavista.

The summary of the bill is as follows:

Designating a portion of U.S. Route 29 as Interstate 785.  Designates U.S. Route 29 from the Virginia-North Carolina line to north of the Town of Altavista as Interstate 785. The bill provides that such designation shall not take effect until the Virginia Department of Transportation consults with the Federal Highway Administration to identify any steps that need to be taken along the designated route to meet federal interstate standards, and VDOT shall report to the Joint Commission on Transportation Accountability the steps that need to be taken for such designation by December 1, 2011.

 The bill is currently in the Virgina House Transportation Sub-committee.

For Interstate 785 to even exist to Altavista, the non-access controlled segments of US 29 between the Danville and Chatham bypasses, the Chatham and Gretna bypasses, and the Gretna and Hurt/Altavista bypasses would have to be upgraded.  That is about 22 miles of roadway.

In addition, upgrades to the Chatham (1965), Gretna (1975), and Hurt/Altavsta (1974) would be necessary.  These would be just the key points the FHWA would suggest to VDOT for any Interstate designation to take place.  

Furthermore, Altavista doesn't seem to make sense as the northern terminus for the Interstate.  Lynchburg, a much larger city, is located approximately 18 miles further north on US 29.  Virginia has plans to build the South Lynchburg Bypass from where US 29 (Madison Heights Bypass) meets US 460 southeast of Lynchburg to near where current US 29 meets VA 24 today.  The City of Lynchburg is currently not served by an Interstate; and if Interstates mean "economic development" then the route should ultimately reach Lynchburg.   Which, personally, I believe is the ultimate goal for I-785. 

Interstate 785 shield courtesy Shields Up! 

Comments

Will Weaver said…
You're right, Altavista is a rather bizarre choice for the northern terminus of the route. The route should probably terminate at the northern end of the Amherst-Madison Heights-Lynchburg bypass, although parts of that route are certainly not up to interstate standards. The Lynchburg Expressway most definitely isn't.
Anonymous said…
i still think that the whole US 29 corridor should get a new number or an extension of an existing number. I think 73 should be extended up from greensboro to Atleast 64 if not 66 along US 29. this would open up a new route through virginia. Or even more crazy have it follow US 15 all the way to Harrisburg, PA!!!
Anonymous said…
Back in the 90s, VDOT did a study on the US 29 corridor that recommended making the whole section between the NC state line and the north end of Amherst County (roughly around where VA 151 branches off) a freeway, with the remaining stretches north of there improved as some type of arterial/parkway. As I recall, that plan called for completion of the South Lynchburg bypass (using either the east or west alignment option), upgrades to Chatham, Gretna, Altavista, and Amherst's bypasses, freeway upgrades of the existing 29 alignment between Chatham and Gretna and between Gretna and Altavista, and new alignment between Blairs and Chatham and between Altavista and Yellow Branch. But that was back in the 90s, when VDOT was flush with money (or at least thought it was flush). Nowadays, I doubt any of this would actually happen. If we're lucky and the planets align just right, they might build the South Lynchburg Bypass, but the rest is probably wishful thinking. Anything further north than Amherst is pretty much out of the question (Charlottesville would never go for it).
Unknown said…
Why not bring 73 up from greensboroto Lynchburg the west towards Roanoke.

Popular posts from this blog

2018 Mojave Road Trip Part 2; The deadly desert highway (California State Route 127 and Nevada State Route 373)

After leaving Barstow via Old Highway 58 my next destination was in Death Valley.  To access Death Valley from rural San Bernardino County required a trek on north on Interstate 15 to California State Route 127 which becomes Nevada State Route 373 at the state line. Along I-15 I encountered the road sign oddity that is Zzyzx Road about eight miles south of Baker.   Zzyzx Road is a four mile road that used to go to the Zzyzx Mineral Springs and Health Spa.   The spa was founded in the 1940s and the owner made up the name "Zzyzx" to claim it was the last word in the English Language.  The spa has been shut down since the 1970s and is now part of a Desert Studies Center for California State University. The southern terminus of CA 127 in Baker is located at I-15 exit 246.  CA 127 is a 91 mile north/south highway which runs to the Nevada State Line in Inyo County.  CA 127 is called Death Valley Road from I-15 northward.  South of CA 127 ...

Finding the Pre-Emption Road of New York State

  The Pre-Emption Road (or rather a series of roads named Pre-Emption Road) follows a survey line called the Pre-Emption Line, drawn in the early days of the United States. The story begins with Massachusetts and New York having competing land claims to modern day Western New York State that have their roots in colonial charters granted by the British. After the Revolutionary War ended, this land became the frontier of the nation and its settlement became a priority for the new American government. During this era, there were a lot of competing land claims that needed to be settled. It was no different with the land claims between New York State and Massachusetts. On November 30, 1786, Massachusetts and New York sent representatives to Hartford, Connecticut to resolve their competing land claims. In less than three weeks, the representatives had reached a compromise. Massachusetts would receive pre-emption rights, meaning the right to sell the land after the Indian title ...

What's In a Name?: When the Roads Really Do Tell a Story

  Our tagline on the Gribblenation blog is "because every road tells a story". Some roads tell different stories than others. Along our travels, we may see historic markers that tell us a little story about the roads we travel or the places we pass by. Some historic markers are more general, as to telling us who lived where or what old trail traversed between two towns. During my travels across New York State and other states or provinces, I pass by many historic markers, some with interesting or amusing references to roads. I wanted to highlight a few of the markers I've seen along my travels around the Empire State and help tell their stories. Those stories may be as specific as explaining the tales of a tree that was used to help measure a distance of eight miles from Bath to Avoca in Steuben County, as referenced on the Eight Mile Tree historical marker above. They may also help point the way along historical roads first used centuries ago, or may help tell a local l...