Skip to main content

Is Virginia considering to extend I-785 further North?

Though it's not even a signed route, Interstate 785 may be extended further north within Virginia.  The 'Future' Interstate, which is to run from I-85 east of Greensboro, NC then follow US 29 to Danville, Virginia, was first came into existence in 1997 when AASHTO approved the designation.  In 1998, Congress passed a bill authorizing the designation.  Later that same year, a "public announcement" was held trumpeting the new Interstate.

Fast forward another 13 years to the present, and the Virginia State Assemblyman, Daniel W. Marshall, III (R), proposed a resolution (HB 2481) to extend Interstate 785 northwards along US 29 to Altavista.

The summary of the bill is as follows:

Designating a portion of U.S. Route 29 as Interstate 785.  Designates U.S. Route 29 from the Virginia-North Carolina line to north of the Town of Altavista as Interstate 785. The bill provides that such designation shall not take effect until the Virginia Department of Transportation consults with the Federal Highway Administration to identify any steps that need to be taken along the designated route to meet federal interstate standards, and VDOT shall report to the Joint Commission on Transportation Accountability the steps that need to be taken for such designation by December 1, 2011.

 The bill is currently in the Virgina House Transportation Sub-committee.

For Interstate 785 to even exist to Altavista, the non-access controlled segments of US 29 between the Danville and Chatham bypasses, the Chatham and Gretna bypasses, and the Gretna and Hurt/Altavista bypasses would have to be upgraded.  That is about 22 miles of roadway.

In addition, upgrades to the Chatham (1965), Gretna (1975), and Hurt/Altavsta (1974) would be necessary.  These would be just the key points the FHWA would suggest to VDOT for any Interstate designation to take place.  

Furthermore, Altavista doesn't seem to make sense as the northern terminus for the Interstate.  Lynchburg, a much larger city, is located approximately 18 miles further north on US 29.  Virginia has plans to build the South Lynchburg Bypass from where US 29 (Madison Heights Bypass) meets US 460 southeast of Lynchburg to near where current US 29 meets VA 24 today.  The City of Lynchburg is currently not served by an Interstate; and if Interstates mean "economic development" then the route should ultimately reach Lynchburg.   Which, personally, I believe is the ultimate goal for I-785. 

Interstate 785 shield courtesy Shields Up! 

Comments

Will Weaver said…
You're right, Altavista is a rather bizarre choice for the northern terminus of the route. The route should probably terminate at the northern end of the Amherst-Madison Heights-Lynchburg bypass, although parts of that route are certainly not up to interstate standards. The Lynchburg Expressway most definitely isn't.
Anonymous said…
i still think that the whole US 29 corridor should get a new number or an extension of an existing number. I think 73 should be extended up from greensboro to Atleast 64 if not 66 along US 29. this would open up a new route through virginia. Or even more crazy have it follow US 15 all the way to Harrisburg, PA!!!
Anonymous said…
Back in the 90s, VDOT did a study on the US 29 corridor that recommended making the whole section between the NC state line and the north end of Amherst County (roughly around where VA 151 branches off) a freeway, with the remaining stretches north of there improved as some type of arterial/parkway. As I recall, that plan called for completion of the South Lynchburg bypass (using either the east or west alignment option), upgrades to Chatham, Gretna, Altavista, and Amherst's bypasses, freeway upgrades of the existing 29 alignment between Chatham and Gretna and between Gretna and Altavista, and new alignment between Blairs and Chatham and between Altavista and Yellow Branch. But that was back in the 90s, when VDOT was flush with money (or at least thought it was flush). Nowadays, I doubt any of this would actually happen. If we're lucky and the planets align just right, they might build the South Lynchburg Bypass, but the rest is probably wishful thinking. Anything further north than Amherst is pretty much out of the question (Charlottesville would never go for it).
Unknown said…
Why not bring 73 up from greensboroto Lynchburg the west towards Roanoke.

Popular posts from this blog

The Tale of Tollhouse Road, western California State Route 168 and failed Piute Pass Highway

Western California State Route 168 is entirely located in Fresno County and is linked historically to the Tollhouse Road corridor.   Tollhouse Road is one of the oldest highways in the Sierra Nevada range of Fresno County. The corridor presently begins in at Clovis Avenue in downtown Clovis and extends northeast to Huntington Lake. In 1866 the Woods Brothers established mining claims on Pine Ridge. In 1867 Fresno County would grant the brothers a toll franchise to construct a roadway to the desirable logging areas atop Pine Ridge and near Dinkey Creek. The Woods would establish a tollhouse at the start of their franchise road and lumber mill. The lumber mill attracted settlers which led to the establishment of the mountain town of Tollhouse. Fresno County would purchase the Tollhouse Road in 1878 and make it a public highway. The county would remove the tolls and incorporate the corridor into the existing county road network. Prior to the establishment of Clovis in 1...

Old Dunlap Road (former California State Route 180 in Yokuts Valley)

When California State Route 180 was commissioned in August 1934 the alignment in took in Sierra Nevada range was very different than from today.  The original highway alignment from Squaw Valley (now Yokuts Valley) to east Grant Grove (then part of General Grant National Park) originally followed what is now Ruth Hill Road, Dunlap Road, Pinehurst Road (modern California State Route 245), Dark Canyon Road (partially now Forest Road 14S45).  After funding fell through for the planned Kings Canyon Road the was corridor eventually picked up as a 30-mile-long cooperative project between the Division of Highways and Federal Government.  Much of current alignment of California State Route 180 bypassing Squaw Valley (now Yokuts Valley) and Dunlap was complete by 1941.  The post-1941 alignment of California State Route 180 in Squaw Valley was shifted onto what was once Dunlap Road in Squaw Valley.  This alignment itself was later bypassed by modern California State Route...

New River Gorge National Park & Preserve - Thurmond

New River Gorge National Park and Preserve is best known for whitewater rafting and other forms of adventure tourism.  Yet, found in the hollows and isolated valleys are quiet farms and former coal mining towns.  Well off the beaten path and isolated from much of its surroundings, Thurmond provides a unique view into Central West Virginia's industrial past. Thurmond began as a railroad town in the late 1800s.  Sparked by the arrival of the Chesapeake & Ohio Railroad and the local coal industry, Thurmond quickly grew into a sizeable transportation and coal center.  When it incorporated as a town in 1903, Thurmond was a full-fledged community - home to two banks, two hotels, and many other services and stores. A CSX freight train passes the old coaling tower in Thurmond.  It was here that many steam locomotives would refill and refuel. Thurmond was home to a C&O railyard which serviced the numerous steam engines passing through the narrow valley.  Thu...