Skip to main content

Ground breaks on "New Era of North Carolina Transportation"

Dignitaries break ground on the Triangle Expressway

At about 10:35 this morning, the toll road era of North Carolina transportation officially began. The ground breaking for the 18.8 mile Triangle Expressway ushers in a new and controversial era of road construction in the state.

The ground breaking ceremony was held at the current end of NC 540 at NC 55 near Apex.

"This marks a new era in transportation in North Carolina," said NC Department of Transportation Secretary Gene Conti. "With dwindling transportation revenues and more fuel efficient vehicles, the state needed another tool in its toolbox to deliver megaprojects like the Triangle Expressway."

Over 100 people witnessed the beginning of the new era.

U.S. Congressman David Price, who also spoke at the event, said that today's ceremony was an example of "where we've come from and where we're going."

Construction for the first segment of the Triangle Expressway - an extension of NC 147 from Interstate 40 to the Davis Drive Interchange with NC 540 - should begin soon. That section is expected to open in 2011.

The extension of NC 540 to the NC 55 Bypass in Holly Springs still has some land acquisition to be done. However, the road should be open to traffic in 2012.

Both segments are design-build projects. In a design-build project, the design and construction of a project happen simultaneously. Over the past decade, a number of highway projects in North Carolina used this method.

Fellow blogger, Bob Malme was also in attendance and his report on the ceremony is here.

Story Links:
State's first toll highway finally reaches beginning of road ---WRAL-TV w/video
Officials break ground on state's first toll road ---News14Carolina w/video

Photos below - for the entire set - go here.

In three years or so, this will no longer be the last exit on NC 540.

North Carolina Turnpike Authority Executive Director, David W. Joyner, speaks during the ceremony.
U.S. Congressman, David Price (4th District).
NCDOT Secretary Gene Conti:

Comments

Bob Malme said…
I took some photos too, but there mainly duplicates of what Adam shot, so I'll spare everyone another look. I was going to take some shots of the existing roadways in the Triangle Parkway corridor before construction starts, but it started to rain, so I'll try again soon.

This was my first roadway groundbreaking and it was quite similar to a couple building groundbreakings I attended at Duke. Even down to the appearance of David Price (he's a Duke professor officially 'on leave'). None of them had bulldozers moving any dirt after the dignitaries, though.
They should've given you guys a shovel and let you participate. :)

Popular posts from this blog

Paper Highways: The Unbuilt New Orleans Bypass (Proposed I-410)

  There are many examples around the United States of proposed freeway corridors in urban areas that never saw the light of day for one reason or another. They all fall somewhere in between the little-known and the infamous and from the mundane to the spectacular. One of the more obscure and interesting examples of such a project is the short-lived idea to construct a southern beltway for the New Orleans metropolitan area in the 1960s and 70s. Greater New Orleans and its surrounding area grew rapidly in the years after World War II, as suburban sprawl encroached on the historically rural downriver parishes around the city. In response to the development of the region’s Westbank and the emergence of communities in St. Charles and St. John the Baptist Parishes as viable suburban communities during this period, regional planners began to consider concepts for new infrastructure projects to serve this growing population.  The idea for a circular freeway around the southern perimeter of t

Hernando de Soto Bridge (Memphis, TN)

The newest of the bridges that span the lower Mississippi River at Memphis, the Hernando de Soto Bridge was completed in 1973 and carries Interstate 40 between downtown Memphis and West Memphis, AR. The bridge’s signature M-shaped superstructure makes it an instantly recognizable landmark in the city and one of the most visually unique bridges on the Mississippi River. As early as 1953, Memphis city planners recommended the construction of a second highway bridge across the Mississippi River to connect the city with West Memphis, AR. The Memphis & Arkansas Bridge had been completed only four years earlier a couple miles downriver from downtown, however it was expected that long-term growth in the metro area would warrant the construction of an additional bridge, the fourth crossing of the Mississippi River to be built at Memphis, in the not-too-distant future. Unlike the previous three Mississippi River bridges to be built the city, the location chosen for this bridge was about two

Memphis & Arkansas Bridge (Memphis, TN)

  Like the expansion of the railroads the previous century, the modernization of the country’s highway infrastructure in the early and mid 20th Century required the construction of new landmark bridges along the lower Mississippi River (and nation-wide for that matter) that would facilitate the expected growth in overall traffic demand in ensuing decades. While this new movement had been anticipated to some extent in the Memphis area with the design of the Harahan Bridge, neither it nor its neighbor the older Frisco Bridge were capable of accommodating the sharp rise in the popularity and demand of the automobile as a mode of cross-river transportation during the Great Depression. As was the case 30 years prior, the solution in the 1940s was to construct a new bridge in the same general location as its predecessors, only this time the bridge would be the first built exclusively for vehicle traffic. This bridge, the Memphis & Arkansas Bridge, was completed in 1949 and was the third