Skip to main content

King's Highway 401 from Woodstock to Windsor

This past April I drove a large portion 230 Kilometer portion of King's Highway 401 from KH 403 near Woodstock to KH 3 in Windsor.



KH 401 is largest 400 series freeway in the Province of Ontario spanning 828 Kilometers/514.5 Miles from Ojobway Parkway in Windsor east to Auto Route 20 in the Quebec Provincial line.  KH 401 carries a segment of freeway in Toronto which has an average daily traffic volume of 416,500 vehicles a day which makes it the busiest road in North America.  KH 401 opened in segments from 1947 through 1968 while the current number designation dates to 1952.

My approach to KH 401 west was from the south terminus of KH 403 near Woodstock of Oxford County.






Windsor is signed as being 225 KM away from Woodstock on KH 401.


Near Woodstock KH 401 west has one of the many On-Route service plazas.  the On-Route plazas are similar to service plazas that are usually found on American Toll-Ways.







At Exit 218 KH 401 west meets KH 19 on Plank Line Road.



West of KH 19 the route of KH 401 enters Middlesex County the Municipality of Thames Center.


KH 401 west in Thames Center has a truck inspection station.



KH 401 west next passes through the City of London and has a major junction with KH 402.






At Exit 177 B-A KH 401 west meets KH 4 on Colonel Talbot Road.




West of KH 4 the route of KH 401 enters Elgin County.


The Elgin County segment of KH 401 west includes another On-Route plaza.





KH 401 west next enters the Municipality of Chatham-Kent.


The Chatham-Kent portion of KH 401 includes yet another On-Route.



KH 401 westbound enters Essex County and meets KH 77 at Exit 48.




KH 401 west enters the City of Windsor and meets KH 3 at Exit 10.



KH 401 west multiplexes KH 3 to Exit 5 on the approach to the Ambassador Bridge on Huron Church Road.









Presently the route of KH 401 is slated to be extended to the new Gordie Howe International Bridge which is presently under construction.   The Gordie Howe Bridge will complete a limited access connection over the International Border between Detroit and Windsor when it opens in 2024.

Comments

Popular posts from this blog

Abandoned US Route 40 in the Truckee River Canyon

Within the Truckee River Canyon in the Sierra Nevada range numerous abandoned portions of US Route 40 can be found alongside modern Interstate 80.   This segment of highway was opened during 1926 as a bypass of the Dog Valley Grade which carried the early North Lincoln Highway and Victory Highway. The corridor of the Truckee River Canyon State Highway would be assigned as US Route 40 when the US Route System was commissioned during November 1926. During 1958 the segment of Interstate 80 between Boca, California and the Nevada state line was complete. When Interstate 80 opened east of Boca numerous obsolete portions of US Route 40 were abandoned. Some of these abandoned segments have been incorporated into the Tahoe-Pyramid Trail.  Part 1; the history of US Route 40 in the Truckee River Canyon The Truckee River Canyon for centuries has been an established corridor of travel known to native tribes crossing the Sierra Nevada range.  The first documented wagon crossi...

Former California State Route 41 past Bates Station

When California State Route 41 was commissioned during August 1934 it was aligned along the then existing Fresno-Yosemite Road north of the San Joaquin River.  Within the Sierra Nevada foothills of Madera County, the original highway alignment ran past Bates Station via what is now Madera County Road 209, part of eastern Road 406 and Road 207.   Bates Station was a stage station plotted during the early 1880s at what was the intersection of the Coarsegold Road and Stockton-Los Angeles Road.   The modern alignment bypassing Bates Station to the east would be reopened to traffic during late 1939.   Part 1; the history of California State Route 41 past Bates Station Bates Station was featured as one of the many 1875-1899 Madera County era towns in the May 21, 1968, Madera Tribune .  Post Office Service at Bates Station is noted to have been established on November 23, 1883 and ran continuously until October 31, 1903.  The postal name was sourced...

The William Flinn (not Flynn) Highway - Pittsburgh's Misspelled Street

For decades if you traveled along PA Route 8 in Pittsburgh's North Hills suburbs, you would have noticed signs that read "William Flynn Highway" at every intersection.  Even today, many businesses and residences have their addresses listed as XXXX William Flynn Highway.  However, it's not William Flynn Highway, it is William FLINN Highway - and the gentleman who it is named for has a long and storied past in Pittsburgh's infrastructure history. William Flinn was born in England in 1851; however later that year, his family emigrated to the United States and would settle in Pittsburgh.  A 10-year-old school dropout, Flinn grew interested in politics and would join the Allegheny County Republican Party in 1877 as a ward commissioner and a seat on the Board of Fire Commissioners.  Flinn would serve in the Pennsylvania State House of Representatives and Senate from 1877 to 1902. (1) Flinn along with James J. Booth would found the Booth and Flinn construction firm ...