Skip to main content

King's Highway 401 from Woodstock to Windsor

This past April I drove a large portion 230 Kilometer portion of King's Highway 401 from KH 403 near Woodstock to KH 3 in Windsor.



KH 401 is largest 400 series freeway in the Province of Ontario spanning 828 Kilometers/514.5 Miles from Ojobway Parkway in Windsor east to Auto Route 20 in the Quebec Provincial line.  KH 401 carries a segment of freeway in Toronto which has an average daily traffic volume of 416,500 vehicles a day which makes it the busiest road in North America.  KH 401 opened in segments from 1947 through 1968 while the current number designation dates to 1952.

My approach to KH 401 west was from the south terminus of KH 403 near Woodstock of Oxford County.






Windsor is signed as being 225 KM away from Woodstock on KH 401.


Near Woodstock KH 401 west has one of the many On-Route service plazas.  the On-Route plazas are similar to service plazas that are usually found on American Toll-Ways.







At Exit 218 KH 401 west meets KH 19 on Plank Line Road.



West of KH 19 the route of KH 401 enters Middlesex County the Municipality of Thames Center.


KH 401 west in Thames Center has a truck inspection station.



KH 401 west next passes through the City of London and has a major junction with KH 402.






At Exit 177 B-A KH 401 west meets KH 4 on Colonel Talbot Road.




West of KH 4 the route of KH 401 enters Elgin County.


The Elgin County segment of KH 401 west includes another On-Route plaza.





KH 401 west next enters the Municipality of Chatham-Kent.


The Chatham-Kent portion of KH 401 includes yet another On-Route.



KH 401 westbound enters Essex County and meets KH 77 at Exit 48.




KH 401 west enters the City of Windsor and meets KH 3 at Exit 10.



KH 401 west multiplexes KH 3 to Exit 5 on the approach to the Ambassador Bridge on Huron Church Road.









Presently the route of KH 401 is slated to be extended to the new Gordie Howe International Bridge which is presently under construction.   The Gordie Howe Bridge will complete a limited access connection over the International Border between Detroit and Windsor when it opens in 2024.

Comments

Popular posts from this blog

Former California State Route 198 at the bottom of Lake Kaweah

East of Lemon Cove of Tulare County one can find several old alignments of California State Route 198 at the bottom of the Lake Kaweah Reservoir.  In particularly dry years these early alignments of California State Route 198 can be accessed as hiking trails.   Part 1; a brief history of California State Route 198 in the Lake Kaweah Reservoir The current corridor of California State Route 198 ("CA 198") in Lake Kaweah has a lengthy history.  The present corridor around Lake Kaweah first became a popular route of travel for European settlers during the mining boom of Mineral King Valley.   Through the 1860s prospectors arrived in Mineral King Valley by way of the Kaweah River and East Fork Kaweah River.  In 1870 John Lovelace and his family built a stock trail up to what was known as Milk Ranch on the East Fork Kaweah River.  The Lovelace extended their trail all the way up to Mineral King Valley and the prospector camp sites.  In 1871 the stock trail was greatly improved

Legend of the Ridge Route; a history of crossing the mountains between the Los Angeles Basin and San Joaquin Valley from wagon trails to Interstates

Over the past two decades I've crossed the Interstate 5 corridor from Los Angeles north over the Sierra Pelona Mountains and Tehachapi Range to San Joaquin Valley what seems to be an immeasurable number of times.  While Interstate 5 from Castaic Junction to Grapevine via Tejon Pass today is known to most as "The Grapevine" it occupies a corridor which has been traversed by numerous historic highways.  The most notable of these highways is known as the "Ridge Route."  This article is dedicated to the Ridge Route and the various highways that preceded it.  The Ridge Route is a 44 mile section of highway which was completed in 1915.  The Ridge Route originally stretched from Castaic Junction north over Liebre Summit and Tejon Pass to the tiny community of Grapevine.  In spite of a roadway that once utilized nearly 700 curves the Ridge Route is generally considered far ahead of it's time and one of the first modern highways in California constructed for auto

I-73/I-74 and NC Future Interstates Year in Review 2020

I'm back with my annual review of what happened the past year with North Carolina's Favorite(?) Interstates, I-73 and I-74, and with other interstate routes proposed and/or under construction. Needless to say, 2020 was a difficult year. The Covid-19 pandemic had its effects on road construction too. NCDOT seeing a decline in its gas tax revenues put a hold on all future projects in the spring. In the fall the 2020-2029 State TIP was revised, restoring funding for some future projects, but also delaying or postponing many more. In my summary by route I'll discuss what was planned at the beginning of 2020 and where things stand at the end of the year. Was a very quiet year for I-73. No additions to the route, but a couple construction projects for future routings. In Richmond County work on the I-73/I-74 Richmond Bypass continued. Substantial clearing for the future interchange with the US 74 Rockingham Bypass was seen, as here in May, photo by Tracy Hamm: As of November 30,