Skip to main content

The Laurinburg-Maxton Bypass, The Once and Future I-74

I went down to Laurinburg today (11/15) to check out the news I heard earlier in the week. First, for those not subscribed to SERoads, a recap. I sent an e-mail to a reporter for the Laurinburg Exchange in response to a quote by the city's mayor in an article of his about the appointment of a new member for their NCDOT district on the NC Board of Transportation. The mayor said one of the new members priorities should be making US 74, I-74. My question was why was the mayor making this comment when the Laurinburg and Maxton Bypasses have been signed I-74 since the fall of 2007? His response was that NCDOT took down all the I-74 shields along the route in Maxton and Laurinburg a few months ago because the freeways were not up to interstate standards. I too a quick roadtrip down to confirm this and take some updated photos for my website.

Did NCDOT take down all references to I-74 in Laurinburg and Maxton? Most of them, but not all. First of all they did not do anything to the overhead or exit signs, at least for now:
However, all signs on poles along the highway have been removed:
The poles remain, either for the return of the I-74 shields, or possibly the old Future I-74 signs that once were here. The I-74 mileposts and exit numbers, though, have not changed:
Which is just as well, as any change would be the third set of exit numbers along this stretch in 3 years. Originally there were no exit numbers along the bypasses, then they put up I-74 exit numbers that were based on faulty mileposts, then they put up the correct numbers last year.

While all the I-74 signs have disappeared from the highway, there appears to be a discrepancy at on-ramps between Scotland and Robeson counties. In Scotland County, all I-74 signs are gone:
Again, with the former interstate shield poll remaining, here's another example:
Here, one wonders why the US 74 signs weren't moved up, unless they do not want to move them down again in a short period of time. The reporter said any upgrade of the Laurinburg Bypass is at least 10 years away. It is different in Robeson County though, the I-74 shields remain at the onramps, both at NC 71 and here at the US 74 Alternate/US 74 Business interchange. This is where the real I-74 East now begins:
Once back on the new section, one is officially now on I-74/US 74 East:
Commentary: One simple question to a reporter thus brings up more questions. The I-73/74 legislation allows states to sign routes designated by the law as interstates once the FHWA certifies the routes are up to interstate standards (or allows exceptions). Did the FHWA allow the signs to be put up in Maxton and Laurinburg in the first place, then change their mind? Did NCDOT provide the complete plans to the FHWA for approval? The plans for the new I-74 freeway from Maxton to NC 41 included sign plans for placing I-74 shields on the bypasses, did someone at the FHWA miss this or did NCDOT not include it? Did NCDOT do this without consulting the FHWA in the first place? Why are parts of US 220 that are substandard allowed to be signed as interstates and this part of US 74 not? The reporter said I could follow up with him if I have any questions, I think I may have. Meanwhile it might be ten years or longer before I-74 signs once again appear in Laurinburg and Maxton. I will revise my I-74 pages to match the current reality.

Comments

Alex said…
That is pure sillyness, especially considering that the US 220 stretch currently signed as I-73/74 includes grass shoulders, but the Ellerbe bypass, which has full shoulders, is signed as Future I-73/74...
James Mast said…
Only NCDOT......
Da-ud said…
Now if we could just get these FHWA eagle eyes up to things like I-78 between Allentown, PA and I-81 and strip down those signs! And to make that I-180 go away in WY. And even remove I-40 between Asheville, NC and I-81. Clearly that's not up to standards either, it's raining rocks!
J-Dawg's Realm said…
Whats funny about this, especially as a truck driver, is that as soon as you enter NC from VA on I-77, it all the sudden becomes I-77/I-74...and then I-74 branches off at Brintle's in Mt Airy...and then once you are on I-74 you get halfway to W-S and the I-74 designations disappear again! Either make it an interstate and bring it up to interstate standards, or dont. You cant have it both ways :)

Last I heard on the rock slide in "The Gorge" was that it would not be re-opened until at least mid January since they have to blast from the top and do more cleanup and that takes a long time.
Anonymous said…
North Carolina's a mess with Interstates. The I-40 Greensboro fiasco, four I-74s, I-485...I'm surprised anybody knows where they're driving in that state.

Popular posts from this blog

Rep. Sue Myrick's letter to Gov. Easley and Sect. Tippett published in Charlotte Observer

US. Representative Sue Myrick's (R-Charlotte) letter to North Carolina's Governor Mike Easley and NC Transportation Secretary Lyndo Tippett was published in the Friday, November 30th edition of the Charlotte Observer . Why are we delaying the completion of 1-485 in Charlotte again? I read in The Charlotte Observer how rising prices of materials are leading to the delay. Why didn't these same rising costs delay the loops in Fayetteville and Wilmington? Why are we building loops in Fayetteville and Wilmington before we complete the one in Charlotte? We were working on the one in Charlotte back when I was mayor. That was 20 years ago! ... Last I looked Charlotte was the largest city in the state. There seems to be no recognition of that fact in Raleigh. No recognition that we are at a standstill with traffic. No recognition that we have a traffic problem. Nor is there any recognition of the fact that the state DOT utterly botched up the southern leg of our yet to be completed ...

New River Gorge National Park & Preserve - Sandstone Falls

The New River, which runs through New River Gorge National Park & Preserve, is best known for its dramatic rapids and whitewater adventures.  Those features begin at one of the river's widest points: Sandstone Falls. From the Sandstone Falls Boardwalk a look at just a small part of the falls. Though the vertical drop of roughly 20 feet is less than many other well-known waterfalls in the state, the falls' expanse, where the river approaches 1500 feet wide, makes Sandstone Falls impressive.   The Boardwalk Trail leads to a better vantage point of the overall falls. It is a great spot for photography, fishing, or laying out in the sun. Access to the falls is relatively easy: from Hinton, cross the New River on Highway 20, then turn right onto CR 26 and follow New River Road to the Sandstone Falls Parking Area. The Island Loop Trail is a short detour off the Boardwalk Trail and shows a quieter side of the area. At Sandstone Falls, you will find a variety of activities fr...

I-90 in Albany, New York and the Berkshire Spur

Today's Albany Times Union has a segment in their weekly Getting There? column that explains some of the history behind how I-90 is designated in the Albany, NY area as well as the Berkshire Spur. The long and short of the article was that I-90 was originally designated on the unsigned portion of the Berkshire Spur, but as free I-90 was built, the designation was moved onto the free portion of road. Additionally, there were talks in 1999 between state and federal officials about the possibility of moving I-90 back onto the unsigned portion of the Berkshire Spur, while extending I-88 onto what we know as free I-90. There would have also had been an I-88/I-90 multiplex between Rotterdam and Albany as a result. http://www.timesunion.com/AspStories/story.asp?storyID=916307