Skip to main content

More Signage Changes on Greensboro Loop

NCDOT posted an announcement this afternoon that they were closing 2 of 3 lanes on I-40 East at the Loop/PTI Airport/To Bryan Blvd. exit to post signs. This is hopefully to change the signs finally on the western I-40/Loop junction. Too bad I didn't know about that this morning when I went to Greensboro to photograph other recent changes, and they are many.

Starting on the I-85 Loop with the US 421 exit. The exit for US 421 North Greensboro, now just reads Greensboro, as seen below:
This is heading on the C/D ramp northbound but the Exit 126B sign south says the same thing.
They have not changed any of the ground signage which still indicates this part of the Loop is I-40/I-85.

The I-73/I-40/I-85 'Interstate Triplex' Sign is no more. Signage has been changed along the highway itself to reflect the new reality. The sign now only has 2 interstates and 1 US highway shield. Note they have not done any changes to the US 220 exit (either on the Loop or US 220/Future I-73 itself:
The I-73/US 421 and I-85 split. Signage has been changed here as well, the first and second BGS are like this:
The signage at the split itself where you see the first mention of I-40:
The signs on the I-73 C/D ramp to the right have not been changed until you reach the last one at the Grandover Parkway and Groometown Road exit (from I-85):
To the left below the sign you can see an I-73 shield milemarker (97).
Like on the I-85 portion the shield markers along the highway have not been changed. The exit numbers on most of the BGSs have, though the signs may not be completed. This is now the exit sign approaching Wendover Avenue and I-40 on I-73/US 421 North:
The overhead signs at the Wendover interchange have been changed, but they are not perfect. As seen here:
I-73 East? This is for the westbound exit, it's the same eastbound. The ground mounted sign for I-73 East has not been changed heading west. They forgot to take the 'East' down with theI-40 shield. The ground sign assemblies are correct:
As I stated they haven't completed the changes of sign going north at I-40:
The sign for westbound I-40 has been taken down but not replaced. Don't know if they'll change the To Bryan Blvd./Airport signage, though the road north of I-40 is officially I-73, currently they have a new exit gore sign marked 103B but the sign points to the right, not the left to I-40.

There's better news heading south on Future I-840. These signs have been correctly revised:
The first one could have used better spacing:
The same could be said of the Exit 1 sign at the I-73/I-40 interchange, but the I-73 sign is okay:
The Wendover Avenue exit number has been revised here too:
However, the sign on the left in the distance has not changed and still reads I-40/I-73.

Here's a closer look at an I-73 mile marker showing NCDOT believes the route will travel at least 100 miles in the state:
The next exits have been slightly altered besides numbers. Before Business 85 and I-85 had different numbers, now they are the same exit, 97 A and B.
What's this? From the left hand BGS you would believe I-73 travels beyond Business 85. The implied multiplex though is never to be:
And once again past this exit, I-73 disappears. The only hint of its presence is the I-73 Mile 96 post you can spot just before the US 220 South Ramp:
Again, I-73 exits upon itself, the exit tab should rightly be on the left BGS, maybe that will happen when I-73 becomes official south of the Loop.

I will not be able to get to Greenboro for the next few weeks at least, so if anyone wants to take photos of the new signs that are supposedly being put up tonight (6/26), you are free to do so.

Comment: The I-73 exit on the Loop (if it was marked) is 96. The I-73 exit on US 220 north is 78(B). This means there is an 18 mile difference between the two milepost systems carrying I-73 (and I-74 in part). NCDOT should, as they've done on Future I-74 in the High Point area, renumber the exits along the US 220 corridor to match I-73's mileage. Up until now there wasn't a consensus as to where I-73 would enter NC, nor what alignment it would take. Now that this is settled, and milemarkers are up elsewhere on the Loop showing NCDOT's confidence in its I-73 distances, it would be best to change the numbers along the entire corridor to I-73 miles, despite the route not being complete.

Comments

Nice photos, Bob. Wasn't able to do any "roadgeeking" around Greensboro due to Toastmasters, but hopefully, I'll make it out that way again soon, and if I do, let's all hook up for lunch. :)
S Summers said…
Nice to see the changes moving along. I see the changes have not been made at US-220/I-73/85 yet, according to the plans there will be an "End I-73" shield placed on SB US-220 south of the interchange on the South end.

Take Care.
Anonymous said…
Forgive my idiocy, but can someone help me figure out a few things about the "old," "new old," and "new" routings through this stretch?

I'm not confused about the routings of the interstate highways, except for whether I-73 and I-85 ever really share a roadbed as implied by a couple of the signs. I am, however, confused as to what are the former and present routings of US 421 and US 220 (has that even changed?), as that issue seems to keep popping up.

Also: has anyone (at NCDOT or elsewhere) ever considered signing the entirety of [planned I-840 + the newly-built southern loop] as I-840 (or possibly something better, like I-885) to encourage through traffic to avoid "Death Valley"? (Then again, that would probably face fierce local noise opposition...)
Anonymous said…
I use Future I-73 and Future I-840 all the time, and you mentioned something about that stretch of road officially being I-73 now, which I 100% think should be. It's very annoying to tell people "Take 'To Bryan Blvd'"...why wasn't this just signed as real I-73? Does anybody know if they're going to put the real signs up anytime soon? I'd hate for it to be "Future" for the next 20 years.
Bob Malme said…
According to the FHWA, AASHTO, even the NCDOT State Map, the section of the Loop north of I-40 to Bryan Blvd is I-73. So it should at least be marked I-73, Future I-840, as it's shown on the NCDOT map. Maybe Mr. Summers has plans of that area and can shed some light on whether the plans show sign changes in that area.
Anonymous said…
I don't understand why they wouldn't shield it I-73 in the first place. And now they're doing all of this sign work, but not changing those signs. I'd love to sit in on a NCDOT meeting some day and see the masterminds at work. Why have a big 6-lane highway with no name except "TO BRYAN BLVD"?
Anonymous said…
I once designed signs for North Carolina and I for the life of me can't understand how after this many years that overhead still says 'To Bryan Blvd'

Popular posts from this blog

2018 Mojave Road Trip Part 2; The deadly desert highway (California State Route 127 and Nevada State Route 373)

After leaving Barstow via Old Highway 58 my next destination was in Death Valley.  To access Death Valley from rural San Bernardino County required a trek on north on Interstate 15 to California State Route 127 which becomes Nevada State Route 373 at the state line. Along I-15 I encountered the road sign oddity that is Zzyzx Road about eight miles south of Baker.   Zzyzx Road is a four mile road that used to go to the Zzyzx Mineral Springs and Health Spa.   The spa was founded in the 1940s and the owner made up the name "Zzyzx" to claim it was the last word in the English Language.  The spa has been shut down since the 1970s and is now part of a Desert Studies Center for California State University. The southern terminus of CA 127 in Baker is located at I-15 exit 246.  CA 127 is a 91 mile north/south highway which runs to the Nevada State Line in Inyo County.  CA 127 is called Death Valley Road from I-15 northward.  South of CA 127 ...

Finding the Pre-Emption Road of New York State

  The Pre-Emption Road (or rather a series of roads named Pre-Emption Road) follows a survey line called the Pre-Emption Line, drawn in the early days of the United States. The story begins with Massachusetts and New York having competing land claims to modern day Western New York State that have their roots in colonial charters granted by the British. After the Revolutionary War ended, this land became the frontier of the nation and its settlement became a priority for the new American government. During this era, there were a lot of competing land claims that needed to be settled. It was no different with the land claims between New York State and Massachusetts. On November 30, 1786, Massachusetts and New York sent representatives to Hartford, Connecticut to resolve their competing land claims. In less than three weeks, the representatives had reached a compromise. Massachusetts would receive pre-emption rights, meaning the right to sell the land after the Indian title ...

What's In a Name?: When the Roads Really Do Tell a Story

  Our tagline on the Gribblenation blog is "because every road tells a story". Some roads tell different stories than others. Along our travels, we may see historic markers that tell us a little story about the roads we travel or the places we pass by. Some historic markers are more general, as to telling us who lived where or what old trail traversed between two towns. During my travels across New York State and other states or provinces, I pass by many historic markers, some with interesting or amusing references to roads. I wanted to highlight a few of the markers I've seen along my travels around the Empire State and help tell their stories. Those stories may be as specific as explaining the tales of a tree that was used to help measure a distance of eight miles from Bath to Avoca in Steuben County, as referenced on the Eight Mile Tree historical marker above. They may also help point the way along historical roads first used centuries ago, or may help tell a local l...