I-74/US 74 Freeway Now Open Eastbound from Maxton to Lumberton

Since Duke wasn't playing today and I figured all the Raleigh people may want to stay and watch the NC State-ECU game, I decided to take a tour to see the progress of the I-74 freeway in Robeson County. Since there had been no publication about an opening date I assumed the best I would find was a change in exit numbers based on an e-mail I sent to the project's engineer earlier this year in which he acknowledged the numbers were wrong. I thus was surprised when I got to (still) Exit 320 on I-74/US 74 and noticed traffic no longer had to get off the highway to proceed on the interstate eastbound. When I got to Exit still numbered 226 I had another surprise....
The road was open beyond the exit. Thus curious, I decided to proceed on. The next exit as listed in the plans should be Dew Road, Pembroke. It was, but notice the exit number...


It is now 203, 27 miles less than it should be and equal to the number for the milepost I sent to the NCDOT earlier in the year when I noticed the exit numbers were too large. The remaining exits match my mileposts (as posted in my I-74 Exit List) almost exactly:
Exit Plan Mile # Malme Mile # Actual Exit #
Dew Rd, Pembroke 230 203 203
Back Swamp Rd 234 207 207
I-95/US 301 235A/B 208A/B 209A/B
Alternate US 74 237 210 210
I assume as part of completing the project the rest of the exits starting in Laurinburg will be changed as well, I will post what those numbers should be on my exit list. I am assuming that NCDOT will not force the traveling public to use two sets of exit numbers on one continuous freeway.

Continuing on, here are some other photos of some of the signs along the eastbound route:

The speed limit is 70 mph, though they have not adjusted up the speed around the Exit (for now) 320 interchange which is still 55.
Here's the next exit eastbound Back Swamp Road, there's no obvious reason for an interchange here, development will occur, I guess, eventually.
Here's the first sign for the upcoming I-95/US 301 interchange, the only ground mounted sign.
The remainder are overhead assemblies, with separate ramps for north and southbound. The freeway becomes 3 lanes in each direction at that point.

Here's the overheads at Exit 209B. Coming back around I took the ramp that leads to C/D ramps paralleling I-95.

All is ready except opening the ramp and removing the cover on the I-74/US 74 West sign. The east signs on the C/D ramps were uncovered, but the interchange was not open and all I-74 signs on I-95 going south were covered as well.

Here's the last exit currently with a number, US 74 Alternate, there is one more exit, NC 41, but the signs haven't been updated there yet. They still have to do work to complete this final 2 mile section to bring it up to interstate standards, update the signs and close the former left turn ramps. The traffic on US 74 west still uses the old route alignment. The still need to fully grade between the old and new highways before this section can be open. The section west of I-95 was being worked on and appeared almost ready to open.

After turning around and using the existing US 74, I accessed the Dew Road interchange by taking Chicken Road off of US 74 to confirm all the westbound ramps were still not open to the east of NC 710. The eastbound signs were up, as expected, the one control city listed was Wilmington. The western ramps were closed and all the signs for the westbound roadway were up, but covered.

I believe construction could be totally finished in the next few weeks. I'll wait until an official announcement to make another tour, other interested parties are invited.

Comments

Anonymous said…
This comment has been removed by a blog administrator.
Bob Malme said…
NCDOT will open the rest of the freeway (at least west of I-95) after a ribbon cutting ceremony on Friday Sept. 26 at 10AM.
Bob Malme said…
The road is now open in both directions according to this NCDOT press release:
https://apps.dot.state.nc.us/pio/releases/details.aspx?r=1869s

Hopefully more photos of the route will be up soon.

Popular posts from this blog

The Pollasky Bridge

The Pollasky Bridge near modern day Friant is a ruined highway bridge which was completed during early 1906 as part of the Fresno-Fresno Flats Road.  The structure is one of the oldest known arch concrete spans to have been constructed in California.  The bridge briefly carried California State Route 41 following the destruction of the Lanes Bridge in 1940.  The Pollasky Bridge itself was destroyed by flooding during 1951, but the ruins can still be found on the Madera County side of the San Joaquin River.   Pictured as the blog cover is the Pollasky Bridge as it was featured in the 1913 book "The Concrete Bridge."  The structure can be seen crossing the San Joaquin River near Friant below on the 1922 United States Geological Survey Map.   Part 1; the history of the Pollasky Bridge The Pollasky Bridge site is near modern day Friant of Fresno County.  The community of Friant was established as Converse Ferry during 1852 on the San Joaquin Rive...

Trimmer Springs Road (Fresno County)

Trimmer Springs Road is an approximately forty-mile rural highway located in Fresno County.  The corridor begins near in California State Route 180 in Centerville and extends to Blackrock Road at the Kings River in the Sierra Nevada range near the Pacific Gas & Electric Company town of Balch Camp. The roadway is named after the former Trimmer Springs Resort and was originally constructed to facilitate access to the Sanger Log Flume.  Trimmer Springs Road was heavily modified and elongated after construction of Pine Flat Dam broke ground in 1947.   Part 1; the history of Trimmer Springs Road Much of the original alignment of Trimmer Springs Road was constructed to facilitate access to the Sanger Log Flume.   The  Kings River Lumber Company  had been established in 1888 in the form of a 30,000-acre purchase of forest lands in Converse Basin.  This purchase lied immediately west of Grant Grove and came to be known as "Millwood."  The co...

When was Ventura Avenue east of downtown Fresno renamed to Kings Canyon Road? (California State Route 180)

California State Route 180 was one of the original Sign State Routes designated in August 1934.  The highway east of Fresno originally utilized what was Ventura Avenue and Dunlap Road to reach what was then General Grant National Park.  By late year 1939 the highway was extended through the Kings River Canyon to Cedar Grove.   In 1940 General Grant National Park would be expanded and rebranded as Kings Canyon National Park.  The Kings Canyon Road designation first appeared in publications circa 1941 when the California State Route 180 bypass of Dunlap was completed.  Kings Canyon Road ultimately would replace the designation of Dunlap Road from Dunlap to Centerville and Ventura Avenue west to 1st Street in Fresno.   The Kings Canyon Road would remain largely intact until March 2023 when the Fresno Council designated Cesar Chavez Boulevard.  Cesar Chavez Boulevard was designated over a ten-mile corridor over what was Kings Canyon Road, remaini...