The Last Chance Grade of US Route 101 refers to a segment of the highway in Del Norte County, California from Crescent City southward through Del Norte Coast Redwoods State Park.  The Last Chance Grade traditionally has been a slide prone choke point through much of the history of US Route 101 and the Redwood Highway.  




The history of the Last Chance Grade

Prior to a highway being constructed over the Last Chance Slide overland transportation between Crescent City southward to Klamath River was virtually non-existent.  Travelers and freight would arrive in Crescent City where it they would be loaded onto rowboats.  The rowboats would follow the coastline southward and turn inland via the Klamath River to the village of Requa.  Requa and the Klamath River served as the gateway to reach Klamath County (annexed into Humboldt County by 1874).  This corridor between Crescent City and the Klamath River can be seen on the 1873 Bancroft's Road Map of California


The 1884 California Office of the State Engineer Map of Del Norte County also shows no established foot path or road from Crescent City south to the Klamath River.  Notably a foot path is shown existing from Wilson's Creek south to the Klamath River.  


In 1888 the Del Norte County Board of Supervisor's authorized construction of a road from Crescent City south to Requa and the Klamath River.  This road was placed under construction in 1889 and was known as the Crescent City-Requa Road.  The Crescent City-Requa Road would be completed by 1895 and ascended the notable slope of the Last Chance Slide.  Journeys on the Crescent City-Requa Road were made via four horse or six horse teams which took ten to sixteen hours to complete depending on the weather conditions.  Fare for a trip on the Crescent City-Requa Road cost travelers a fee of $5 dollars.  

Much of the Crescent City-Requa Road was constructed by way of use of Coastal Redwood puncheons.  A photo of a derelict segment of the Crescent City-Requa Road can be seen in the March 1934 California Highways & Public Works.  

The history of what would become US Route 101 ("US 101") over the Last Chance Grade begins with the approval of the 1909 First State Highway Bond Act.  The First State Highway Bond Act was approved by voters during 1910 and was the genesis point of some of the most notable highways in California.  Legislative Route Number 1 ("LRN 1") as originally plotted was a new State Highway which was designated between San Francisco north to Crescent City.  The route of LRN 1 would be extended to the Oregon State Line during the 1919 Third State Highway Bond Act and was came be known as the Redwood Highway.  LRN 1 can be seen aligned over the Last Chance Grade via the Crescent City-Requa Road on the 1917 California State Automobile Association Map

The existing Crescent City-Requa Road was upgraded and modernized to State standards by 1920.  Much of the previous Redwood puncheon roadway from Crescent City south to Wilson's Creek was abandoned as it was not suited to automotive traffic.  This 1920 alignment of LRN 1/Redwood Highway now exists as Enderts Beach Road and the California Coastal Trail in Del Norte Coast Redwoods State Park.  LRN 1 and the Redwood Highway can be seen aligned over the Last Chance Grade between Crescent City-Requa on the 1920 Clason Highway Map of California.  

In November 1926 the US Route System was created.  US Route 101 from San Francisco north to Crescent City was aligned over the Redwood Highway.  Both US 101 and the Redwood Highway between Crescent City-Requa can be seen on the 1927 Rand McNally Highway Map of California.  

The March 1934 California Highways & Public Works describes the nearly completed realignment of US 101 and the Redwood Highway south of Crescent City.  Specifically new alignment of US 101/Redwood Highway would eliminate 205 curves south of Crescent City to the Last Chance Slide.  The new alignment of US 101 was cited to have only 34 curves which shortened the distance between Crescent City and the Last Chance Slide from 10.31 miles to 9.52 miles.  The article cites the new alignment of US 101 and the Redwood Highway as having expected completion date by late 1934.  Note; the history of the Crescent City-Requa Road can be found in the March 1934 California Highways and Public Works.





The September 1935 California Highways & Public Works features the formal dedication of the US 101/Redwood realignment south of Crescent City to the Last Chance Slide.  The formal dedication ceremony took place on August 18th, 1935.  



The 1935 California Division of Highways Map of Del Norte County displays the new alignment of US 101 south of Crescent City to the Last Chance Slide alongside the 1920 alignment.  

Since 1935 US 101 and the Redwood Highway have changed minimally.  The climb via the Last Chance Grade still has the signature vista of Crescent City described in the September 1935 California Highways & Public Works and serves as a boundary of the Redwood National Park & State Parks system.  









According to CAhighways.org from July 2012 to February 2013 the Last Chance Grade experienced over 200 slides.  The road deck of US 101 subsequently slid 13 inches horizontally and 10 inches vertically.  In March 2014 Caltrans established the Last Chance Grade Partnership to work with local authorities on the feasibility of realigning US 101 off the Last Chance Grade.  As of 2019 Environmental studies have been continuing to progress regarding potential realignments of US 101.  This image snip from CAhighways.org shows the multiple alignments under study from Postmile DN 19.81 south to DN 13.47.

Comments

Popular posts from this blog

Paper Highways: The Unbuilt New Orleans Bypass (Proposed I-410)

  There are many examples around the United States of proposed freeway corridors in urban areas that never saw the light of day for one reason or another. They all fall somewhere in between the little-known and the infamous and from the mundane to the spectacular. One of the more obscure and interesting examples of such a project is the short-lived idea to construct a southern beltway for the New Orleans metropolitan area in the 1960s and 70s. Greater New Orleans and its surrounding area grew rapidly in the years after World War II, as suburban sprawl encroached on the historically rural downriver parishes around the city. In response to the development of the region’s Westbank and the emergence of communities in St. Charles and St. John the Baptist Parishes as viable suburban communities during this period, regional planners began to consider concepts for new infrastructure projects to serve this growing population.  The idea for a circular freeway around the southern perimeter of t

Hernando de Soto Bridge (Memphis, TN)

The newest of the bridges that span the lower Mississippi River at Memphis, the Hernando de Soto Bridge was completed in 1973 and carries Interstate 40 between downtown Memphis and West Memphis, AR. The bridge’s signature M-shaped superstructure makes it an instantly recognizable landmark in the city and one of the most visually unique bridges on the Mississippi River. As early as 1953, Memphis city planners recommended the construction of a second highway bridge across the Mississippi River to connect the city with West Memphis, AR. The Memphis & Arkansas Bridge had been completed only four years earlier a couple miles downriver from downtown, however it was expected that long-term growth in the metro area would warrant the construction of an additional bridge, the fourth crossing of the Mississippi River to be built at Memphis, in the not-too-distant future. Unlike the previous three Mississippi River bridges to be built the city, the location chosen for this bridge was about two

Memphis & Arkansas Bridge (Memphis, TN)

  Like the expansion of the railroads the previous century, the modernization of the country’s highway infrastructure in the early and mid 20th Century required the construction of new landmark bridges along the lower Mississippi River (and nation-wide for that matter) that would facilitate the expected growth in overall traffic demand in ensuing decades. While this new movement had been anticipated to some extent in the Memphis area with the design of the Harahan Bridge, neither it nor its neighbor the older Frisco Bridge were capable of accommodating the sharp rise in the popularity and demand of the automobile as a mode of cross-river transportation during the Great Depression. As was the case 30 years prior, the solution in the 1940s was to construct a new bridge in the same general location as its predecessors, only this time the bridge would be the first built exclusively for vehicle traffic. This bridge, the Memphis & Arkansas Bridge, was completed in 1949 and was the third