I took a trip back to the completely open I-74/US 74 freeway to check out the westbound side, which was closed before, and to see what they had done to solve the exit number problem.

I approached the new freeway via I-95. The new Exit 13 signs start out 2 miles in advance.
They have completely demolished the former US 74 (Exit 14) ramps as you can see just before the ramps for the new exit begin. The closeness of the 2 ramps shows why they could not keep the old ramp in service...
The ramps lead to, depending on your point of view, some of the most unique or most confusing BGSs ever to appear on an interstate. Here are photos from both north and south off ramps...
These are taken from the C/D ramps heading southbound on I-95, the only destination I-74 currently goes to is Laurinburg.

I took the eastbound ramp to see how close to completion the freeway was east of I-95.

Coming back, I did a quick 180 to show the signs from the C/D ramps going northbound for those who may be coming to investigate from points south.

This is from the on ramp to Alternate US 74. As you can see there still doing work there, though all the signs are up. Again, these signs may be confusing to some. They have not finished putting the final coat of pavement on the last 2 miles of the freeway and there are no I-74 signs or mileposts past the Alternate 74 exit. Here's a closeup of signs going further along Alternate 74...
For those wondering what the control cities at the various exits east of I-95 are, this should satisfy your curiosity...
Laurinburg is used in place of Rockingham at on ramps closer to that city.

I took the following photos to show how the interchange at NC 710 had changed, formerly the end of the freeway....
This is the NC 710 exit westbound. First, you'll notice the old exit numbers are used. They have started the process of removing the original mileposts that are wrong between what is now Exit 203 (Dew Rd) and is still Exit 220 (Alt/Bus US 74) to the west, but the none of the exit numbers on the old stretch have been changed to back the new. This will probably be Exit 199.

The previous version of the photo you may have seen had the east 74/74 signs covered up. This ramp design is unique in that the entrance is to the left due to the existing road the van is parked on to the right.

I continued on to Laurinburg to see if they had switched out the previous 55 mph speed limit signs. Not only is the speed now 70 for all of the new freeway, the 70 mph limit continues all along the Maxton Bypass until the Scotland County line where it is reduced to 60 mph. The 70 mph stretch is still not up to Interstate standards, as this photo will attest...
Exit numbers have not changed along the Laurinburg Bypass, but they have been covered over for what was Exit 207 (Business US 74) and Exit 209, since these match numbers further east, they also need to cover Exit 210 and Exit 212, since these will be repeats as well. Here's one of the exit signs along the Bypass...
This exit number will be changed to something around 186. For a complete list of current numbers and probable future ones, see my I-74 Exit List.

Lastly, here's a photo of the only triplex eastbound on ramp sign displays in Laurinburg...
Does adding US 501 to the mix make it more or less confusing?

Additional I-73/74 Notes: I returned up US 220 and the I-73/74 corridor. A stretch of the substandard I-73/74 highway north of Candor is signed as a work zone with signs every 1/2 mile warning of 'Low/Soft Shoulder" on both sides of the northbound roadway. The only thing I can think this can be is the widening of the shoulders to Interstate standards. However, according to the latest state TIP this project is supposed to be a couple of years off. Did they get money to do it early, or is NCDOT going overboard in warning of future construction?

Speaking of construction, progress is proceeding on the 2 Visitor's Centers/ Rest Areas near the Randolph/Montgomery county line. The freeway is only 1 lane in each direction around the construction zone. The future northbound rest area can be seen in the distance in the photo below...
Some of the photos above and others will be featured in updated I-74 Segment 15 and Segment 16 pages in the near future.

Comments

Anonymous said…
very nice .. descriptions and pictures too. It will be nice when it is all done. It will be still a few more years.


Dino
Anonymous said…
I don't get how some freeways are classified as Interstates when they have grass shoulders, while others with substandard paved shoulders cannot be posted as an Interstate.
because interstates classify as a highway where it intersects other states (Example: Interstate 40). Sure some roads are classified as interstates when they are only 9 miles long that circles a city, they should have called them SPURS.

Popular posts from this blog

The Central Freeway of San Francisco (US Route 101)

The Central Freeway is a 1.2-mile elevated limited access corridor in the city of San Francisco.  As presently configured the Central Freeway connects from the end of the Bayshore Freeway to Market Street.  The Central Freeway carries the mainline of northbound US Route 101 from the Bayshore Freeway to Mission Street. The Central Freeway has origins with the establishment of Legislative Route Number 223 and is heavily tied to the history of the once proposed Panhandle Freeway.  The Central Freeway between the Bayshore Freeway and Mission Street was completed during 1955.  The corridor was extended to a one-way couplet located at Turk Street and Golden Gate Avenue in 1959 which served to connect US Route 101 to Van Ness Avenue.  The Central Freeway was damaged by the 1989 Loma Prieta Earthquake and has since been truncated to Market Street.   The Central Freeway as pictured on the blog cover was featured in the May/June 1959 California Highways & Public Works.  The scan below is fro

The Bayshore Freeway (US Route 101)

The Bayshore Freeway is a 56.4-mile component of US Route 101 located in the San Francisco Bay Area.  The Bayshore Freeway connects the southern extent of San Jose to the Central Freeway in the city of San Francisco.  The corridor was originally developed as the Bayshore Highway between 1923 and 1937.  The Bayshore Highway would serve briefly as mainline US Route 101 before being reassigned as US Route 101 Bypass in 1938.  Conceptually the designs for the Bayshore Freeway originated in 1940 but construction would be delayed until 1947.  The Bayshore Freeway was completed by 1962 and became mainline US Route 101 during June 1963.   Part 1; the history of the Bayshore Freeway Prior the creation of the Bayshore Highway corridor the most commonly used highway between San Jose and San Francisco was El Camino Real (alternatively known as Peninsula Highway).  The  American El Camino Real  began as an early example of a signed as an Auto Trail starting in 1906.  The era of State Highway Mainte

Former US Route 101 and California State Route 41 through Paso Robles

Paso Robles is a city located on the Salinas River of San Luis Obispo County, California.  As originally configured the surface alignments of US Route 101 and California State Route 41 converged in downtown Paso Robles.  US Route 101 originally was aligned through Paso Robles via Spring Street.  California State Route 41 entered the City of Paso Robles via Union Road and 13th Street where it intersected US Route 101 at Spring Street.  US Route 101 and California State Route 41 departed Paso Robles southbound via a multiplex which split near Templeton.   Pictured above is the cover of the September/October 1957 California Highways & Public Works which features construction of the Paso Robles Bypass.  Pictured below is the 1935 Division of Highways Map of San Luis Obispo County which depicts US Route 101 and California State Route 41 intersecting in downtown Paso Robles.   Part 1; the history of US Route 101 and California State Route 41 in Paso Robles Paso Robles ("Pass of the