Skip to main content

Sunburn at Wrightsville Beach

Dad is in town for the weekend. So on Saturday, we went down to Wrightsville Beach for the day.

Route: I-440, I-40, US 117/NC 132, US 74, and US 76.

Nothing really spectacular about the route down. Although I was surprised to see the amount of guide signs on I-40 that only listed the route number and no control city destination. I guess it's our small slice of the west.

Not sure why I-140 currently ends at I-40 instead of continuing to what will be its terminus at US 17 anyways.

We accessed the beach at the Masonboro Inlet Parking Lot...which also happens to be the end of US 76.

The beach was great. Waves were four to six feet as Tropical Storm Gabrielle was a few hundred miles off shore. If it wasn't for the endless hype about the storm (we really need therain) around these parts. You would have no idea that a storm was off the horizon. Blue skies and slight ocean breezes were dominant. Yes, the waves were a bit rougher and would get stronger as the day went on. But unless you knew what was in the Atlantic, you'd have no clue.

So some of the photos from yesterday's trip.

The view from my chair. By the way, sunburn on the top of your feet really sucks, if you've never experienced it.

A lone surfer vs. the waves.


This beach house may have the best view on Wrightsville...The Atlantic and Masonboro Inlet.

A sail boat was out today. You can see the waves were a bit choppy.

On the list of things to do in my life, sea fishing and deep sea fishing.

Is this heaven? 'No, it's North Carolina.'

Above and Below: Sand dunes around Masonboro Inlet.


I didn't have the best luck getting photos of surfers catching a wave.

One last view of the ocean. For some reason, the water is a little more clear at Wrightsville than other beaches nearby. I hope some of the shots show this.

Comments

Anonymous said…
Beautiful pictures you took.

Popular posts from this blog

Chowchilla Mountain Road to Yosemite National Park

Chowchilla Mountain Road of Mariposa County is one of the oldest roadways servicing Yosemite National Park.  As presently configured this fourteen-mile highway begins at California State Route 49 near Elliot Corner and terminates at the Wawona Road in Yosemite National Park.  Chowchilla Mountain Road was constructed as a franchise toll road over Battalion Pass circa 1869-1870.  The highway was built at behest of Galen Clark to connect the town of Mariposa to his property near the South Fork Merced River at what is now Wawona.   In late 1874 the highway along with Clark’s Station would be purchased by the Washburn Brothers.  The Washburn Brothers would continue to toll Chowchilla Mountain Road as part of their Yosemite Stage Route lines.  The highway would ultimately become a Mariposa County public highway in 1917.  Mariposa would later be more directly linked with Yosemite Valley in 1926 following the completion of the Yosemite All-Year Highwa...

Interstate 40's Tumultuous Ride Through the Pigeon River Gorge

In the nearly 60 years Interstate 40 has been open to traffic through the Pigeon River Gorge in the mountains of Western North Carolina, it has been troubled by frequent rockslides and damaging flooding, which has seen the over 30-mile stretch through North Carolina and Tennessee closed for months at a time. Most recently, excessive rainfall from Hurricane Helene in September 2024 saw sections of Interstate 40 wash away into a raging Pigeon River. While the physical troubles of Interstate 40 are well known, how I-40 came to be through the area is a tale of its own. Interstate 40 West through Haywood County near mile marker 10. I-40's route through the Pigeon River Gorge dates to local political squabbles in the 1940s and a state highway law written in 1921. A small note appeared in the July 28, 1945, Asheville Times. It read that the North Carolina State Highway Commission had authorized a feasibility study of a "...water-level road down [the] Pigeon River to the Tennessee l...

Angus L. Macdonald Bridge

At 1.3 kilometers (or about 0.84 miles) in length, the Angus L. Macdonald Bridge is one of two bridges crossing over the Halifax Harbour between Halifax, Nova Scotia and Dartmouth, Nova Scotia, with the other bridge being the A. Murray Mackay Bridge . Opened in 1955 and named after former Nova Scotia Premier and Canadian Minister of Defense for Naval Services Angus L. Macdonald, the Macdonald Bridge was the first bridge that crossed Halifax Harbour that was opened to traffic. The Macdonald Bridge was also the subject of the Big Lift, which was only the second time in history that the span of a suspension bridge were replaced while the bridge was open to traffic. Planning began in 2010 for the Big Lift, while construction took place between 2015 and 2017. Similar work occurred on the Lion's Gate Bridge in Vancouver, British Columbia before the project took place on the Macdonald Bridge. At this time, much of the bridge infrastructure is new, leaving only the towers, main cables and...