Skip to main content

April 7 Roadtrip to Augusta, GA

Left Raleigh on Saturday Afternoon to head to Augusta, GA.

Route: I-440, I-40, I-95, Future I-295, I-95, US 78, SC 781, US 278, SC/GA 28, I-520 (GA/SC), I-20, GA 28

Accomplishments: With traveling through Barnwell County in South Carolina, I have completed the Palmetto State. Future I-295 clinched (until they extend it, whenever that will be), SC 781 clinched, I-520 in GA clinched also I-520 in SC clinched (again until they extended it, whenever that will be.) New mileage on US 78, US 278, SC/GA 28.

Notes:

There is a lot of work going on at where the US 70 Clayton Bypass meets I-40. More than I expected. The interchange will be a high speed trumpet.

Future I-295 does not have any exit numbers. And is a rather quiet freeway.




There is still a lot of work to be done at the I-95 and I-74 interchange south of Lumberton. Bridge beams are just now being set into place for the bridge that will carry the travel lanes of I-74 over I-95. They are currently only over the southbound lanes of I-95.

US 301/601 is detoured through Bamberg. I am not sure what is going on but the entire route of US 301/601 through town has been torn up and is just red clay and sand right now.

In both Bamberg and Williston, an abandoned rail line that parallels US 78 through town has been converted to a walkway. Williston is a little more elaborate with replica gas lamps along the trail.

I was surprised to see a brief Business US 78 through Blackville.

US 78 is pretty much a quite and rural route. The small towns aren't much of a delay and as you approach Aiken the terrain becomes more rolling.


Where US 278 meets SC 125 and SC 28 is a little bit confusing. The aging grade separated intersection is not well signed.

At least for now, South Carolina is using Georgia's I-520 mileage for exits. US 1 in North Augusta is Exit 17.

On I-520 West the signage for Exit 16 (GA 28) follows the South Carolina template (even within Georgia) vs. the traditional Georgia style.

Comments

Popular posts from this blog

The case to move Interstate 73 in Southern Ohio onto US 33

Every decade or so, Ohio pushes to revisit the proposed Interstate 73 that would connect Michigan to Myrtle Beach, South Carolina.  It's been happening since Congress legislated the route in 1991.  Within Ohio, Interstate 73 generally follows the US 23 corridor from Portsmouth through Columbus to Toledo, and into Michigan. Since High Priority Corridor Five was created , Ohio has really done nothing to move forward with Interstate 73.  Sure, there have been feasibility studies here and there.  But actual dollars and construction just haven't occurred. The US 33 Nelsonville Bypass appears to have been built to Interstate standards. However, Ohio has been slowly upgrading US 33 to a full freeway through Southeastern Ohio.  Bypasses of Lancaster and Nelsonville opened in 2004 and 2013, respectively.  Other sections of two-lane road are being twinned, some to freeway or, at a minimum, to expressway standards.  Currently, a $274 million widening project in...

Rep. Sue Myrick's letter to Gov. Easley and Sect. Tippett published in Charlotte Observer

US. Representative Sue Myrick's (R-Charlotte) letter to North Carolina's Governor Mike Easley and NC Transportation Secretary Lyndo Tippett was published in the Friday, November 30th edition of the Charlotte Observer . Why are we delaying the completion of 1-485 in Charlotte again? I read in The Charlotte Observer how rising prices of materials are leading to the delay. Why didn't these same rising costs delay the loops in Fayetteville and Wilmington? Why are we building loops in Fayetteville and Wilmington before we complete the one in Charlotte? We were working on the one in Charlotte back when I was mayor. That was 20 years ago! ... Last I looked Charlotte was the largest city in the state. There seems to be no recognition of that fact in Raleigh. No recognition that we are at a standstill with traffic. No recognition that we have a traffic problem. Nor is there any recognition of the fact that the state DOT utterly botched up the southern leg of our yet to be completed ...

Local Sign Find - The last remnant of Business Interstate 95 between Kenly and Rocky Mount , NC

As you head north on Interstate 95 at Exit 107 for Kenly and US 301, you'll notice something odd about the overhead sign for the exit.  Peeling off the sign for all that can see is the word 'NORTH' off-center from the US 301.  This old sign (probably close to original from when this section of I-95 opened - more on that in a little bit) gives a hint to a short-lived Business Interstate Route that ran from here to Rocky Mount. The last hint of the Kenly-Wilson-Rocky Mount Business I-95 (Shaun White - August 2020) Interstate 95 in North Carolina has a unique history.  But one of the overlooked and forgotten pieces of Interstate 95 in North Carolina is the 38 mile section between Kenly and Rocky Mount.  When opened to traffic in late 1978, it was the next to last piece of Interstate 95 in North Carolina to open replacing a four lane US 301 from Battleboro through Rocky Mount and Wilson to eventually tying back into the Interstate in Kenly. Though it was not delayed in l...