Skip to main content

Madera County Road 603


Madera County Road 603 is an approximately nine-mile rural highway located in the Sierra Nevada foothills.  The corridor was previously known as Daulton Road and passes the former Raymond Branch Railroad siding of Daulton.  Much of early Daulton Road serviced the numerous copper mines of Daulton Ranch between modern Roads 29 and 600.  The corridor was extended east to Road 400 as part of the construction of Hidden Dam and the Hensley Lake reservoir in 1974.  




Part 1; the history of Madera County Road 603

Historically Madera County Road 603 was known as Daulton Road.  Daulton Ranch was the locale of numerous mines which began being worked in the 1860s.  These mines were operated by the California Copper Company.  

During 1886 Daulton siding would be established along the Raymond Branch of the Southern Pacific Railroad. The siding name "Daulton" is a reference to Henry C. Daulton who granted an easement through his ranch for the Raymond Branch to be constructed. Henry C. Daulton was also part of the commission which led to split of Madera County from northern Fresno County in 1893. The Raymond Branch would see a major realignment of the Yosemite Stage Road which brought the southern terminus to nearby Raymond. Daulton would be served by a Post Office from 1899 to 1908.

Daulton can be seen on the Raymond Branch (shown as Yosemite Division) on the 1891 Thompson map of Fresno County.


Daulton can be seen in detail on the 1912 United States Geological Survey map of Mariposa.  The Daulton townsite can be seen along the Raymond Branch roughly where modern Madera County Roads 603 and Road 602 intersect.  An earlier alignment of Daulton Road can be seen originating at Raymond Road.  Daulton Road can be seen running west through Daulton Ranch and nearby Daulton.  


Daulton Road can be seen running west of Daulton to approximately where Madera County Road 29 and Avenue 26 now meet on the 1919 United States Geological Survey map of Raynor Creek. 


Daulton Road appears straightened to modern standards on the 1935 Division of Highways map of Madera County.  The roadway is shown spanning from what is modern Madera County Road 29 east through Daulton to Raymond Road.  Ultimately the Raymond Branch northeast of Daulton would be abandoned and removed by 1946. The remainder of the branch railroad south of Daulton would be removed by 1956.


During the mid-twentieth century Madera County would drop their name conventions for roads and replace them with numeric designations.  Daulton Road can be seen renamed as Road 603 on the 1962 United States Geological Map of Daulton.  


During 1974 the U.S. Army Corps of Engineers completed Hidden Dam along the Fresno River.  Madera County Road 603 was extended east of Road 600 (formerly Raymond Road) over the Fresno River below the dam to Road 400 (formerly River Road).  The eastern extension of Road 603 can be seen on the 1980 United States Geological Survey map of Shaver Lake.  




Part 2; a drive on Madera County Road 603

Eastbound Madera County Road 603 begins abruptly via a sharp left hand turn from Road 29.  Road 29 continues ahead southward as a dirt highway.  



Road 603 eastbound ascends numerous hills common to the Sierra Nevada foothills of Madera County and passes the site of Daulton near Road 602.  Daulton is easy to identify due to the few remaining buildings and the prevalent foliage.  Traffic approaching the Road 603/Road 602 junction is advised Hensley Lake is 5 miles away continuing east.  











Road 603 continues east of Daulton to Road 600.  Traffic wishing to access Hensley Lake is directed to stay on Road 603 eastbound.  













Road 603 continues east and crosses the Fresno River below Hidden Dam.  The highway ends at Road 400 at the outskirts of the Hensley Lake Recreation Area.  













Comments

Popular posts from this blog

The case to move Interstate 73 in Southern Ohio onto US 33

Every decade or so, Ohio pushes to revisit the proposed Interstate 73 that would connect Michigan to Myrtle Beach, South Carolina.  It's been happening since Congress legislated the route in 1991.  Within Ohio, Interstate 73 generally follows the US 23 corridor from Portsmouth through Columbus to Toledo, and into Michigan. Since High Priority Corridor Five was created , Ohio has really done nothing to move forward with Interstate 73.  Sure, there have been feasibility studies here and there.  But actual dollars and construction just haven't occurred. The US 33 Nelsonville Bypass appears to have been built to Interstate standards. However, Ohio has been slowly upgrading US 33 to a full freeway through Southeastern Ohio.  Bypasses of Lancaster and Nelsonville opened in 2004 and 2013, respectively.  Other sections of two-lane road are being twinned, some to freeway or, at a minimum, to expressway standards.  Currently, a $274 million widening project in...

SCDOT to present I-73 wetland replacement proposal on May 3rd

It looks like SCDOT may soon clear an environmental hurdle when they present a plan to replace 27 acres of wetlands on May 3rd. If approved, the plan will replace 27 acres of wetlands in the Little Pee Dee Heritage Preserve that will be impacted by construction of Interstate 73 through the area. Approval of the wetland replacement proposal is necessary for SCDOT to get federal permits that will allow them to build the new highway. The DOT and the Department of Natural Resources (DNR) are working together on the plan. Recently, the SC Legislature made two attempts to allow recent wetland gains by the state as compensation for the affected 27 acres. Both attempts failed. The DNR has stated it would not oppose I-73 even though some environmental-oriented groups have been vocal against it. The Southern Environmental Law Center , based in Chapel Hill, is one of the groups hoping that the routing through the preserve can still be changed. They point to federal law that prohibits buildi...

Local Sign Find - The last remnant of Business Interstate 95 between Kenly and Rocky Mount , NC

As you head north on Interstate 95 at Exit 107 for Kenly and US 301, you'll notice something odd about the overhead sign for the exit.  Peeling off the sign for all that can see is the word 'NORTH' off-center from the US 301.  This old sign (probably close to original from when this section of I-95 opened - more on that in a little bit) gives a hint to a short-lived Business Interstate Route that ran from here to Rocky Mount. The last hint of the Kenly-Wilson-Rocky Mount Business I-95 (Shaun White - August 2020) Interstate 95 in North Carolina has a unique history.  But one of the overlooked and forgotten pieces of Interstate 95 in North Carolina is the 38 mile section between Kenly and Rocky Mount.  When opened to traffic in late 1978, it was the next to last piece of Interstate 95 in North Carolina to open replacing a four lane US 301 from Battleboro through Rocky Mount and Wilson to eventually tying back into the Interstate in Kenly. Though it was not delayed in l...