Skip to main content

2009 Mackinac Bridge Walk

Over the Labor Day Holiday, I had the opportunity to go up to Michigan. I explored a heck of a lot of new territory for me, and I will have photos of that up on the blog later this month. But one of the real highlights of the trip was taking part of the 52nd Mackinac Bridge Walk on Labor Day.

The entire flickr set is here. (66 photos)

Our party left got to Mackinaw City at about 7:15. There was a long back up at Exit 337 so we went down the highway one mile and got off at Ext 338. There was a parking lot right across the end of the exit ramp - and we saved plenty of time (which would really come in handy not that long after).

The walk from the parking lot to the shuttle bus was just as the sun rose...and there were some great shots of the sun rise over the harbor.

IMG_0513

We were able to load onto to the shuttle bus to take us over to the St. Ignace side of the bridge at just before 8 am. That's when the delays started. On the southbound lanes of the bridge - two pick up trucks either got in a fender bender or stalled out. (There were various stories on what happened.) And it took us nearly an hour and a half to cross the bridge. I did manage to see the two trucks being hauled out on flatbed - it did look like they may have wrecked.

We started the walk at 9:20...and the one thing we noticed was the fog was starting to roll in from Lake Huron and the East...made for a dramatic sight!

Here I am at just about the start of the walk - you can see the fog behind me.

IMG_0525

This shot probably was taken when the fog was at its thickest.

IMG_0531

One of my favorite shots of the sun trying to burn through the fog over Lake Huron.

Lake Huron Fog

You can really see how the fog came through in this photo.

IMG_0535

The fog slowly began to lift -but the mist from the fog was a great way to keep cool during the walk. And the impressive height and size of the bridge's towers really came into view.

While walking the main span of the bridge...there was a father carrying his daughter sleeping almost perfectly still in his arms. To me - it was the best shot of the walk.

Daddy will get you home....

Near the end of the walk, the fog had mostly lifted and a clear view of the bridge could be seen.

IMG_0563

And here it is - five miles later - the 'Finish Line' - a welcomed sight to all.

IMG_0579

At the end of the walk - there are a ton of souvenir stands selling T-Shirts and Patches and also everyone gets a completed walk certificate. One of the unique things is for the cost of a postage stamp you can get the official postal cancellation stamp with stamp on your certificate. It's a nice and inexpensive way to commemorate your experience .

However, there was one other item of note. For $20 a copy of "Mighty Mac - The Official Picture History of the Mackinac Bridge" by Lawrence A. Rubin could be purchased. The book shows the construction of the bridge and was first published not long after the bridge's completion. It's a great look at how the bridge was built.

IMG_0584

Mr. Rubin, pictured above, is still with us and was signing copies of his book - and I did indeed purchase one. You were able to ask for a simple inscription for him to write in addition to his signature. Mine reads, "To Adam, Congratulations on your first bridge walk."

Hopefully, I'll be able to make it up for a second some day.

Comments

Steve A said…
Time for a vote: Does that photogenic girl have chicken pox or measles? I vote measles.

Popular posts from this blog

Rep. Sue Myrick's letter to Gov. Easley and Sect. Tippett published in Charlotte Observer

US. Representative Sue Myrick's (R-Charlotte) letter to North Carolina's Governor Mike Easley and NC Transportation Secretary Lyndo Tippett was published in the Friday, November 30th edition of the Charlotte Observer . Why are we delaying the completion of 1-485 in Charlotte again? I read in The Charlotte Observer how rising prices of materials are leading to the delay. Why didn't these same rising costs delay the loops in Fayetteville and Wilmington? Why are we building loops in Fayetteville and Wilmington before we complete the one in Charlotte? We were working on the one in Charlotte back when I was mayor. That was 20 years ago! ... Last I looked Charlotte was the largest city in the state. There seems to be no recognition of that fact in Raleigh. No recognition that we are at a standstill with traffic. No recognition that we have a traffic problem. Nor is there any recognition of the fact that the state DOT utterly botched up the southern leg of our yet to be completed ...

New River Gorge National Park & Preserve - Sandstone Falls

The New River, which runs through New River Gorge National Park & Preserve, is best known for its dramatic rapids and whitewater adventures.  Those features begin at one of the river's widest points: Sandstone Falls. From the Sandstone Falls Boardwalk a look at just a small part of the falls. Though the vertical drop of roughly 20 feet is less than many other well-known waterfalls in the state, the falls' expanse, where the river approaches 1500 feet wide, makes Sandstone Falls impressive.   The Boardwalk Trail leads to a better vantage point of the overall falls. It is a great spot for photography, fishing, or laying out in the sun. Access to the falls is relatively easy: from Hinton, cross the New River on Highway 20, then turn right onto CR 26 and follow New River Road to the Sandstone Falls Parking Area. The Island Loop Trail is a short detour off the Boardwalk Trail and shows a quieter side of the area. At Sandstone Falls, you will find a variety of activities fr...

I-90 in Albany, New York and the Berkshire Spur

Today's Albany Times Union has a segment in their weekly Getting There? column that explains some of the history behind how I-90 is designated in the Albany, NY area as well as the Berkshire Spur. The long and short of the article was that I-90 was originally designated on the unsigned portion of the Berkshire Spur, but as free I-90 was built, the designation was moved onto the free portion of road. Additionally, there were talks in 1999 between state and federal officials about the possibility of moving I-90 back onto the unsigned portion of the Berkshire Spur, while extending I-88 onto what we know as free I-90. There would have also had been an I-88/I-90 multiplex between Rotterdam and Albany as a result. http://www.timesunion.com/AspStories/story.asp?storyID=916307