Skip to main content

New Exit Signs on Durham Freeway (NC 147)

Recently I posted to SERoads about an NCDOT press release regarding the replacement of interstate exit signs in Mecklenburg County. According to the press release "New signs with reflective sheeting will be installed, improving reflectivity and removing the need for lighting on the sign structure. The completion date is September 3."

New signs will be installed in the following locations:

  • I-77, Exits 1-23
  • I-85, Exits 27-42
  • I-485, Exits 1 and 32-67
  • I-277, Exits 1 and 2
Well, as it turns out, NCDOT has been for the last week installing similar signs (currently only on overhead structures) on the Durham Freeway, mostly southbound. I decided it was easier to show examples of the new signs by driving around Durham instead of traveling to Charlotte:

Here's a couple of the new signs at Exit 16A for US 15/501 North:
A closer look at the next sign for Hillandale Road reveals the light fixtures formerly at the bottom of the sign have been removed:
Sign changes have also occurred further south the last two days towards downtown Durham:
These signs changes are somewhat bittersweet for me, since the old ones were the first signs I saw heading south on the Freeway from my first apartment in Durham on Swift Road. The Freeway ended at Erwin Road at that time and the Swift Road southbound off ramp was the first exit ramp heading south. Exit 13 is also one of the ways to get to the Durham Bulls ballpark.

It appears they haven't quite finished installing the signs south of the city at Briggs Road, yet:
Notice no exit tab over the Briggs Avenue South sign (with, like for route numbers, the larger first letter in the direction label) and the new NC 147 sign still has lights installed. The placement of the exit tab on a separate sign makes it easier to remove for changes. Will there be changes in exit numbers when the Triangle Parkway, an extension of NC 147, is built? MassDOT is now doing the same thing with their new signs in case the FHWA refuses to exempt them from replacing their current consecutive exit numbers scheme with milepost based numbers.

Lastly, since I was there, I am throwing in a photo of the new pedestrian bridge near Alston Avenue completed earlier this spring:
They have posted a couple new signs northbound also. I'll wait though until the project is finished to take a look at those.

Comments

Anonymous said…
Just wanted to point out that they have propagated the error on the Exit 12 sign--that is US 15/US 501 BUSINESS but there's no mention of that fact...
Anonymous said…
I got some of the new sigh replacements when i was in Charlotte. Here is the link.
http://www.flickr.com/photos/azehner/4822047574/
BrentWhite said…
I-77 except for a handful of signs has been upgraded now.

I-85 has been upgraded from Exit 27 (Southbound only) to I-77.
Exit Signs said…
@Brent
Yes i noticed that it has been upgraded now.

Popular posts from this blog

Paper Highways: The Unbuilt New Orleans Bypass (Proposed I-410)

  There are many examples around the United States of proposed freeway corridors in urban areas that never saw the light of day for one reason or another. They all fall somewhere in between the little-known and the infamous and from the mundane to the spectacular. One of the more obscure and interesting examples of such a project is the short-lived idea to construct a southern beltway for the New Orleans metropolitan area in the 1960s and 70s. Greater New Orleans and its surrounding area grew rapidly in the years after World War II, as suburban sprawl encroached on the historically rural downriver parishes around the city. In response to the development of the region’s Westbank and the emergence of communities in St. Charles and St. John the Baptist Parishes as viable suburban communities during this period, regional planners began to consider concepts for new infrastructure projects to serve this growing population.  The idea for a circular freeway around the southern perimeter of t

Hernando de Soto Bridge (Memphis, TN)

The newest of the bridges that span the lower Mississippi River at Memphis, the Hernando de Soto Bridge was completed in 1973 and carries Interstate 40 between downtown Memphis and West Memphis, AR. The bridge’s signature M-shaped superstructure makes it an instantly recognizable landmark in the city and one of the most visually unique bridges on the Mississippi River. As early as 1953, Memphis city planners recommended the construction of a second highway bridge across the Mississippi River to connect the city with West Memphis, AR. The Memphis & Arkansas Bridge had been completed only four years earlier a couple miles downriver from downtown, however it was expected that long-term growth in the metro area would warrant the construction of an additional bridge, the fourth crossing of the Mississippi River to be built at Memphis, in the not-too-distant future. Unlike the previous three Mississippi River bridges to be built the city, the location chosen for this bridge was about two

Memphis & Arkansas Bridge (Memphis, TN)

  Like the expansion of the railroads the previous century, the modernization of the country’s highway infrastructure in the early and mid 20th Century required the construction of new landmark bridges along the lower Mississippi River (and nation-wide for that matter) that would facilitate the expected growth in overall traffic demand in ensuing decades. While this new movement had been anticipated to some extent in the Memphis area with the design of the Harahan Bridge, neither it nor its neighbor the older Frisco Bridge were capable of accommodating the sharp rise in the popularity and demand of the automobile as a mode of cross-river transportation during the Great Depression. As was the case 30 years prior, the solution in the 1940s was to construct a new bridge in the same general location as its predecessors, only this time the bridge would be the first built exclusively for vehicle traffic. This bridge, the Memphis & Arkansas Bridge, was completed in 1949 and was the third