Skip to main content

Remaining stretch of I-485 will feature three unique types of interchanges

The remaining 5.4 miles of I-485 currently under construction in Mecklenburg County will feature three unique interchanges.  All three are in use elsewhere within the country, but would be the first ones built in the Tar Heel State.

At two of the interchanges, the new designs are considered upgrades (in traffic flow and cost savings) versus what had originally been planned.

The interchange design names are Split Diamond, Diverging Diamond, and Turbine.

Heading East from the current terminus at NC 115, the three new interchange designs run as follows:

The Split Diamond interchange will be located at Prosperity Church Road.  This interchange will consist of two access roads and six roundabouts.

Split Diamond Interchange with Prosperity Church Road (NCDOT)
The Diverging Diamond Interchange (DDI), first used in Missouri, is starting to catch interest in North Carolina.  The interchange design, actually reverses the lanes of traffic on the surface/cross street.  This will be located at the Mallard Creek Road exit on I-485.

This design replaces a planned Single Point Urban Interchange (SPUI) for 485 and Mallard Creek.


We covered a Diverging Diamond Interchange back in October when NCDOT announced it is considering the design on NC 133 where it meets the US 74/76 freeway in Leland.  These two intersections, along with two more on nearby Interstate 85 at NC 73 and Poplar Tent Road, are some of seven prospective locations for this new style of interchange.

Finally, the Turbine - an interchange that has all left turn movements circling around a central bridge in a clockwise direction, creating a seamless movement between the two highways.  This replaces the previously planned four-level stack interchange.  (Similar in design to where I-77 and 485 meet in Southern Mecklenburg County.)

The new "Turbine" interchange at 85/485.  (NCDOT)      
According to NCDOT, this type of interchange will cost less to build and maintain, take up less space, and allow for less interruptions to existing I-85 traffic during construction.


Story Links:
Last Outerbelt juntions to display unique functions ---Charlotte Observer
I-485 Charlotte Outer Loop ---NCDOT

Comments

Froggie said…
NCDOT apparently doesn't see it as such, but I-40/Exit 195 (at NC 109) in Winston-Salem, is very much a split-diamond.
Anonymous said…
Should that be counterclockwise, or am I missing something? (Maybe clockwise in countries that drive on the left...)
Reminds me of my Alexandria Orb proposal:

http://wwwtripwithinthebeltway.blogspot.com/2007/02/alexandria-orb-page-one-news-december.html

http://wwwtripwithinthebeltway.blogspot.com/search/label/Alexandria%20Orb

Popular posts from this blog

I-40 rockslide uncovers old debates on highway

The Asheville Citizen-Times continues to do a great job covering all the angles of the Interstate 40 Haywood County rock slide. An article in Sunday's edition provides a strong historical perspective on how the Pigeon River routing of Interstate 40 came about. And perhaps most strikingly, in an article that ran just prior to the highway's opening in the fall of 1968, how engineers from both Tennessee and North Carolina warned "...that slides would probably be a major problem along the route for many years." On February 12, 1969, not long after the Interstate opened, the first rock slide that would close I-40 occurred. Like many other Interstates within North Carolina, Interstate 40 through the mountains has a history prior to formation of the Interstate Highway System and was also a heated political battle between local communities. The discussion for a road that would eventually become Interstate 40 dates back to the 1940's as the idea for interregional high

Mines Road

Mines Road is an approximately twenty-eight-mile highway located in the rural parts of the Diablo Range east of the San Francisco Bay Area.  Mines Road begins in San Antonio Valley in Santa Clara County and terminates at Tesla Road near Livermore of Alameda County.  The highway essentially is a modern overlay of the 1840s Mexican haul trail up Arroyo Mocho known as La Vereda del Monte.  The modern corridor of Mines Road took shape in the early twentieth century following development of San Antonio Valley amid a magnesite mining boom.  Part 1; the history of Mines Road Modern Mines Road partially overlays the historic corridor used by La Vereda del Monte (Mountain Trail).  La Vereda del Monte was part of a remote overland route through the Diablo Range primarily used to drive cattle from Alta California to Sonora.  The trail was most heavily used during the latter days of Alta California during the 1840s. La Vereda del Monte originated at Point of Timber between modern day Byron and Bre

Former California State Route 41 past Bates Station

When California State Route 41 was commissioned during August 1934 it was aligned along the then existing Fresno-Yosemite Road north of the San Joaquin River.  Within the Sierra Nevada foothills of Madera County, the original highway alignment ran past Bates Station via what is now Madera County Road 209, part of eastern Road 406 and Road 207.   Bates Station was a stage station plotted during the early 1880s at what was the intersection of the Coarsegold Road and Stockton-Los Angeles Road.   The modern alignment bypassing Bates Station to the east would be reopened to traffic during late 1939.   Part 1; the history of California State Route 41 past Bates Station Bates Station was featured as one of the many 1875-1899 Madera County era towns in the May 21, 1968, Madera Tribune .  Post Office Service at Bates Station is noted to have been established on November 23, 1883 and ran continuously until October 31, 1903.  The postal name was sourced from Bates Station owner/operator George Ba