Skip to main content

Mass. Highway Sign Photos 2010

MassDOT's Highway Division currently has several highway sign replacement projects going on. In the Boston area, these involve I-95 (128) between US 3 in Burlington and I-93 in Woburn, MA 2 between Concord and the end of the freeway in Cambridge, and along I-93 south of the city from Columbia Road (Exit 15) to MA 24 (Exit 4). I didn't make it to that I-95 section, other than new mile markers, there was little changed on I-93. But I did capture photos of some of the new MA 2 signage going westbound:
Here's examples of the first new signage heading westbound, just beyond the Alewife MBTA station and garage, route shields and sign design with line under exit tab match current Mass DOT practice. For those unfamiliar with MA Route 2, it travels from Boston to the NY state line. The exit numbers run from I-91 eastward. The route is not all freeway, so exit numbers are assigned in the gaps to intersections that could be exits, if the road were a freeway. This leaves gaps in the 'consecutive' numbers along the route and is another argument for a milepost based system. The standard large MA state shield seen above, in closeup below:
You would think that the directional banner is misplaced atop the route shield, that it should be flush with the left side, not extending outward. But this is standard MassDOT, and before that MassHighway, practice for these signs. The following shows another new feature on Mass. freeways, 2/10 mileposts with route shields on the whole mile markers:
This milepost reads 134, which the MA 60 exit (and probably the exit before and after) would be numbered under a milepost system.
The following sign was either not changed, or failed to get the line under the exit tab:
The following photo is taken going up the hill from Belmont into Lexington. It again shows another huge MA 2 shield with leading directional banner. This hill not only has a great view of Boston heading eastbound, but is the result of crossing the geologic boundary between the Boston Basin formation, and the bedrock lying under the rest of Massachusetts. The Basin had much younger and mostly sedimentary rocks. So when the ice age came, glaciers scooped more material out of the basin, than from the surrounding area, leaving what would become Boston at a lower elevation. Much of this lowland was then flooded after the ice melted, creating Boston Harbor and its surrounding bays:
But enough geology, back to the road signage. Here again are typical new Mass. highway signs:
Notice the MUTCD compliant large letters for directions, however the new signs do not have the Clearview lettering recommended in the new manual, not that I'm complaining. It's not the first time MassDOT and its predecessors have ignored some of the MUTCD directives.

We are now approaching the I-95 interchange:
If you look closely at the I-95 exit tab, below where it says EXITS, there appears to be a line text. Zooming in it turns out to be a line of numbers. There's another one on the bottom of the exit sign too, and on all other tabs and signs I have photos of above, it turns out. The MassDOT spokesman who answered my inquiry about mileage based exits said they had a system in place to rapidly change the numbers if required by the FHWA, are these numbers part of that system?

Now a mile from I-95. If you think it looks like it might rain soon from the above photo:
You would be correct. Thus I wasn't able to take any more photos along Route 2. You'll notice that the I-95 overhead exit signs are not accompanied by any ground mounted MA 128 signs, as is customary at other exits. It may be those will be coming when the project is completed, or maybe it's another attempt to remove 128 from the I-95 section, another example of no 128 signs is at the MA 109 exit. Ironically, the mile marker you see in the distance beyond the exit sign is for mile 129, meaning if MA does adopt mile-based exit numbering, the number for the I-95 exits would probably be 128.

Speaking of I-95 and 128. I returned from the trip to Route 2 going south along that route to I-93. The US 1 interchange provided a good comparison between the last two iterations of MA highway signing. The former:
And the latest version, no more button copy interstate numbers:
You can also see the exit sign for South I-95/North US 1 on the highway above. This is an older version sign that is accompanied by MA 128 ground signs, one barely visible through the fence.

This sign for the I-93/I-95 split is a vast improvement over what existed before:
That sign just said 'I-93/I-95, 2 miles.' Here is another view of new signs at the I-93 interchange and the two lane I-95 off-ramp, which has helped with traffic flow:

This also shows the new location of the 'End 128' sign, there used to be two following the exit. Not that this has changed any traffic reporter from referring to the rest of the road to Braintree as 128. They moved the 128 signs apparently to make room for a new 'Begin I-93' sign. I saw it too late to take a picture, but here it is, in the lower right corner, from one of MassDOT's traffic cameras:

Finally, since I was up visiting my hometown on the 4th of July, I want to note how the town's highway department showed their patriotic spirit:
Since the town had only put down one of the two new layers of asphalt on Main Street, part of the parade route, they put down non-MUTCD compliant red, white and blue stripes. Alas, these stripes are to be paved over and replaced by standard two yellow stripes by the end of the month.

Comments

Anonymous said…
Penndot District 5 does the exact same thing with their bigger route markers (examples of PA 33, US 209, PA 309)
Carl said…
These highway signs are bigger ad clearer and I'm sure that every motorists will get to see it more than old road signs.

A friend of mine once told me that road signs nowadays have better government steel strapping structure and stainless steel banding strap so that it will stay longer and it will not fall or break.

Popular posts from this blog

The case to move Interstate 73 in Southern Ohio onto US 33

Every decade or so, Ohio pushes to revisit the proposed Interstate 73 that would connect Michigan to Myrtle Beach, South Carolina.  It's been happening since Congress legislated the route in 1991.  Within Ohio, Interstate 73 generally follows the US 23 corridor from Portsmouth through Columbus to Toledo, and into Michigan. Since High Priority Corridor Five was created , Ohio has really done nothing to move forward with Interstate 73.  Sure, there have been feasibility studies here and there.  But actual dollars and construction just haven't occurred. The US 33 Nelsonville Bypass appears to have been built to Interstate standards. However, Ohio has been slowly upgrading US 33 to a full freeway through Southeastern Ohio.  Bypasses of Lancaster and Nelsonville opened in 2004 and 2013, respectively.  Other sections of two-lane road are being twinned, some to freeway or, at a minimum, to expressway standards.  Currently, a $274 million widening project in...

Rep. Sue Myrick's letter to Gov. Easley and Sect. Tippett published in Charlotte Observer

US. Representative Sue Myrick's (R-Charlotte) letter to North Carolina's Governor Mike Easley and NC Transportation Secretary Lyndo Tippett was published in the Friday, November 30th edition of the Charlotte Observer . Why are we delaying the completion of 1-485 in Charlotte again? I read in The Charlotte Observer how rising prices of materials are leading to the delay. Why didn't these same rising costs delay the loops in Fayetteville and Wilmington? Why are we building loops in Fayetteville and Wilmington before we complete the one in Charlotte? We were working on the one in Charlotte back when I was mayor. That was 20 years ago! ... Last I looked Charlotte was the largest city in the state. There seems to be no recognition of that fact in Raleigh. No recognition that we are at a standstill with traffic. No recognition that we have a traffic problem. Nor is there any recognition of the fact that the state DOT utterly botched up the southern leg of our yet to be completed ...

I-90 in Albany, New York and the Berkshire Spur

Today's Albany Times Union has a segment in their weekly Getting There? column that explains some of the history behind how I-90 is designated in the Albany, NY area as well as the Berkshire Spur. The long and short of the article was that I-90 was originally designated on the unsigned portion of the Berkshire Spur, but as free I-90 was built, the designation was moved onto the free portion of road. Additionally, there were talks in 1999 between state and federal officials about the possibility of moving I-90 back onto the unsigned portion of the Berkshire Spur, while extending I-88 onto what we know as free I-90. There would have also had been an I-88/I-90 multiplex between Rotterdam and Albany as a result. http://www.timesunion.com/AspStories/story.asp?storyID=916307