Skip to main content

Carolina Bays Parkway Extension sees alignment shift

Earlier in the month, I blogged about the possibility of part of the final segment of the Carolina Bays Parkway being shifted away from a subdivision.

Well last week after a public meeting, SCDOT decided to shift the highway and the interchange at its terminus at SC 707 1,500 hundred feet to the north. The change will spare numerous homes at The Meadows subdivision along with a few businesses. The move will actually trim $5 million in right-of-way purchases from the cost of the $235 million project.

In addition to the cost savings with the new routing, SCDOT is looking at changing the design of the Parkway's bridge over the Intracoastal Waterway and possibly having Enterprise Road cross over the highway than underneath it.

Despite the possible $20 million in savings, SCDOT is holding firm to the $235 million project cost estimate because of inflation and the rising costs of materials.

The 4.2 mile extension of the Carolina Bays Parkway, signed as SC 31, should see construction begin in 2010 and be open to traffic in 2013.

Story: Myrtle Beach Sun News

Comments

Anonymous said…
I'm interested in seeing a map of the project with revised alignment. I am considering purchasing a home and am not sure how it will affect that property.

Popular posts from this blog

I-40 rockslide uncovers old debates on highway

The Asheville Citizen-Times continues to do a great job covering all the angles of the Interstate 40 Haywood County rock slide. An article in Sunday's edition provides a strong historical perspective on how the Pigeon River routing of Interstate 40 came about. And perhaps most strikingly, in an article that ran just prior to the highway's opening in the fall of 1968, how engineers from both Tennessee and North Carolina warned "...that slides would probably be a major problem along the route for many years." On February 12, 1969, not long after the Interstate opened, the first rock slide that would close I-40 occurred. Like many other Interstates within North Carolina, Interstate 40 through the mountains has a history prior to formation of the Interstate Highway System and was also a heated political battle between local communities. The discussion for a road that would eventually become Interstate 40 dates back to the 1940's as the idea for interregional high

Interstate 210 the Foothill Freeway

The combined Interstate 210/California State Route 210 corridor of the Foothill Freeway is approximately 85.31-miles.  The Interstate 210/California State Route 210 corridor begins at Interstate 5 at the northern outskirts of Los Angeles and travels east to Interstate 10 in Redlands of San Bernardino County.  Interstate 210 is presently signed on the 44.9-mile segment of the Foothill Freeway between Interstate 5 and California State Route 57.  California State Route 210 makes up the remaining 40.41 miles of the Foothill Freeway east to Interstate 10.  Interstate 210 is still classified by the Federal Highway Administration as existing on what is now signed as California State Route 57 from San Dimas south to Interstate 10.  The focus of this blog will mostly be on the history of Interstate 210 segment of the Foothill Freeway.   Part 1; the history of Interstate 210 and California State Route 210 Interstate 210 (I-210) was approved as a chargeable Interstate during September of

Former California State Route 41 past Bates Station

When California State Route 41 was commissioned during August 1934 it was aligned along the then existing Fresno-Yosemite Road north of the San Joaquin River.  Within the Sierra Nevada foothills of Madera County, the original highway alignment ran past Bates Station via what is now Madera County Road 209, part of eastern Road 406 and Road 207.   Bates Station was a stage station plotted during the early 1880s at what was the intersection of the Coarsegold Road and Stockton-Los Angeles Road.   The modern alignment bypassing Bates Station to the east would be reopened to traffic during late 1939.   Part 1; the history of California State Route 41 past Bates Station Bates Station was featured as one of the many 1875-1899 Madera County era towns in the May 21, 1968, Madera Tribune .  Post Office Service at Bates Station is noted to have been established on November 23, 1883 and ran continuously until October 31, 1903.  The postal name was sourced from Bates Station owner/operator George Ba