Skip to main content

I-540 getting a new name

I read the headline, "New bit of Outer Loop renamed," in the paper this morning and thought nothing of it -- they were simply giving the western stretch of 540 a secondary name after some legislator or governor that had something to do with building the road. Right?

Well...
Days before the next stretch of Raleigh's Outer Loop is due to open for traffic, the state Department of Transportation is scrambling to give it a new name.

Workers this week began replacing red-and-blue Interstate 540 shields with black-and-white diamond signs to mark the new 4.5-mile stretch of six-lane freeway as N.C. 540.

"It's going to look like an interstate, and it's going to drive like an interstate, but it's just going to be called N.C. 540," said Kevin Lacy, state traffic engineer.

The 540 identity crisis stems from a state Turnpike Authority plan to build the 18-mile Triangle Expressway through RTP and western Wake County. The toll road would overlap with part of the new 540.

After gaining federal approval in January for the future switch to a toll road, turnpike officials lobbied the DOT not to label the new stretch of 540 an interstate. Transportation Secretary Lyndo Tippett, who doubles as turnpike board chairman, settled on the N.C. 540 name in May.

"The final decision was to maintain the 540 designation for continuity ... so drivers would not all of a sudden lose the road they were driving on completely," Lacy said, adding that "we are also, believe it or not, trying to minimize the confusion. We didn't want I-540 to end at some point for no reason."

Earth to Lacy: I-540 is going to end at some point (I-40, specifically) for no reason. Not only does this violate North Carolina's rules against duplicating route numbers -- although I guess I-/US 74 and I-/NC 73 have already destroyed those rules -- but there's long been a precedent established in other states where toll roads can have Interstate numbers as long as no federal money was used to build them. Not to mention, how much money are they going to waste on now-useless I-540 shields on the new section of the freeway?

This thing stinks on so many different levels that it could only happen in North Carolina.

Comments

Adam said…
Or could it be a hedge against the tolled Triangle Expressway not being built at all? If it is not built as a toll road that road isn't going any further for a decade or two,what's the point of calling it Future I-540 then?

Either way it doesn't make sense and just another feather in the NCDOT Dunce Cap.
Anonymous said…
The only name that needs to be on I-540 is VOID. The reason I moved to Apex was to get away from North Raleigh life, to be in the country. Now with this monster trying to come through all of that is going to be a thing of the past.

Is there not enough retail and strip malls in Wake county? All I hear is talk about how great it will be for people living in Holly Springs and how much growth will result. Those people need to move closer to RTP and not expect Apex residents to lose their homes to bail them out of there commute. I am being forced to move because I don't want to live beside a 6 lane interstate in Scotts Mill.

No one talks about people like us who do not want the road at all...
And yes we all knew it was coming but only now do we all see the massive scope of this that was unknown 10 years ago when the neighborhood was being built. Kill the project!!!! Its not fair to those who live in Apex and have no need for it.

Popular posts from this blog

Paper Highways: The Unbuilt New Orleans Bypass (Proposed I-410)

  There are many examples around the United States of proposed freeway corridors in urban areas that never saw the light of day for one reason or another. They all fall somewhere in between the little-known and the infamous and from the mundane to the spectacular. One of the more obscure and interesting examples of such a project is the short-lived idea to construct a southern beltway for the New Orleans metropolitan area in the 1960s and 70s. Greater New Orleans and its surrounding area grew rapidly in the years after World War II, as suburban sprawl encroached on the historically rural downriver parishes around the city. In response to the development of the region’s Westbank and the emergence of communities in St. Charles and St. John the Baptist Parishes as viable suburban communities during this period, regional planners began to consider concepts for new infrastructure projects to serve this growing population.  The idea for a circular freeway around the southern perimeter of t

Hernando de Soto Bridge (Memphis, TN)

The newest of the bridges that span the lower Mississippi River at Memphis, the Hernando de Soto Bridge was completed in 1973 and carries Interstate 40 between downtown Memphis and West Memphis, AR. The bridge’s signature M-shaped superstructure makes it an instantly recognizable landmark in the city and one of the most visually unique bridges on the Mississippi River. As early as 1953, Memphis city planners recommended the construction of a second highway bridge across the Mississippi River to connect the city with West Memphis, AR. The Memphis & Arkansas Bridge had been completed only four years earlier a couple miles downriver from downtown, however it was expected that long-term growth in the metro area would warrant the construction of an additional bridge, the fourth crossing of the Mississippi River to be built at Memphis, in the not-too-distant future. Unlike the previous three Mississippi River bridges to be built the city, the location chosen for this bridge was about two

Memphis & Arkansas Bridge (Memphis, TN)

  Like the expansion of the railroads the previous century, the modernization of the country’s highway infrastructure in the early and mid 20th Century required the construction of new landmark bridges along the lower Mississippi River (and nation-wide for that matter) that would facilitate the expected growth in overall traffic demand in ensuing decades. While this new movement had been anticipated to some extent in the Memphis area with the design of the Harahan Bridge, neither it nor its neighbor the older Frisco Bridge were capable of accommodating the sharp rise in the popularity and demand of the automobile as a mode of cross-river transportation during the Great Depression. As was the case 30 years prior, the solution in the 1940s was to construct a new bridge in the same general location as its predecessors, only this time the bridge would be the first built exclusively for vehicle traffic. This bridge, the Memphis & Arkansas Bridge, was completed in 1949 and was the third