Skip to main content

Minarets & Western Railroad

This previous month I spent some time around the North Fork area in Madera County, California tracking the remaining evidence of the Minarets & Western Railroad.


The Minarets & Western Railroad was a 53 mile standard gauge line between Pinedale (modern River Park in Fresno) of Fresno County north to Wishon at Crane Valley Dam in Madera County. The Minarets & Western Railroad was owned by the Sugar Pine Lumber Company and operated from 1921 to 1933 when it was shuttered for not being profitable. From Pinedale the Minarets & Western Railroad had sidings northward in; Friant, Bellview, Shuteye and a terminus in Wishon. The switching yard in Wishon was located next to Crane Valley Dam which was first built in 1901.  From the Wishon switching yard the Minarets & Western Railroad connected to another 11 mile line that crossed Crane Valley Dam and terminated near a lumber community that was known as Minarets.  Crane Valley Dam was expanded in 1910 which facilitated trains crossing the structure to the lumber camps on it's eastern flank.  

The entire line of the Minarets & Western Railroad can be seen on the 1935 Division of Highways Maps of Fresno County and Madera County.  Below the Minarets & Western Railroad can be seen starting in Pinedale and terminating at Crane Valley Dam.  The 1935 Division of Highways Maps does not show the connecting line over Crane Valley Dam east to Minarets.











The Minarets & Western Railroad from Pinedale approached the Madera County Line via Old Friant Road towards the community of Friant. In Friant the Minarets & Western Railroad crossed the San Joaquin River in front of Millerton Dam.  Millerton Dam was completed in 1942 and partially covers the line of the Minarets & Western Railroad.



The Minarets & Western Railroad within Madera County crossed over North Fork Road/Road 200 west of the 1947 Fine Gold Creek Bridge.  In the first photo below the grade of the Minarets & Western Railroad can be partially seen on the right. 





The Minarets & Western Railroad split from North Fork Road/Road 200 and followed Road 221 towards Wishon on Bass Lake.  The Minarets & Western Railroad crossed Road 222 and the grade was recycled into Railroad Grade Road. 




The Minarets & Western Railroad would have followed Road 222 northward towards Wishon and would have crossed the Bass Lake Flume.  The Bass Lake Flume is also known as the is also known as the Brown's Creek Ditch Flume and was constructed shortly after Crane Valley Dam was expanded in 1910.  Brown's Creek Ditch Flume was rebuilt circa 1920/1921 and includes several metal portions that funnel water from Crane Valley Dam.   The Brown's Creek Ditch Flume has a nearby popular hiking trail which is why there are so many Pacific Gas & Electricity warning signs. 









As Road 222 approaches Crane Valley Dam it enters a clearing in the forest which was the location of Wishon.  




Road 222 ascends to the top of Crane Valley Dam where the Minarets & Western Railroad would have connected to the logging spur on the opposite side of Bass Lake.  Crane Valley Dam was constructed by the San Joaquin Electric Company as earthen reservoir impounding Willow Creeks in 1901.  Crane Valley Dam was first expanded in 1905 and again in 1910.  The 1910 level of Crane Valley Dam is what the Minarets & Western Railroad crossed to the opposite side of Bass Lake.






 

Comments

Anonymous said…
I love historic information and pics of the way things used to be. Thanks for taking the time to share this information!
Anonymous said…
thanks, i find the article very interesting/helpful as i search out and visualize how it was.

Popular posts from this blog

The case to move Interstate 73 in Southern Ohio onto US 33

Every decade or so, Ohio pushes to revisit the proposed Interstate 73 that would connect Michigan to Myrtle Beach, South Carolina.  It's been happening since Congress legislated the route in 1991.  Within Ohio, Interstate 73 generally follows the US 23 corridor from Portsmouth through Columbus to Toledo, and into Michigan. Since High Priority Corridor Five was created , Ohio has really done nothing to move forward with Interstate 73.  Sure, there have been feasibility studies here and there.  But actual dollars and construction just haven't occurred. The US 33 Nelsonville Bypass appears to have been built to Interstate standards. However, Ohio has been slowly upgrading US 33 to a full freeway through Southeastern Ohio.  Bypasses of Lancaster and Nelsonville opened in 2004 and 2013, respectively.  Other sections of two-lane road are being twinned, some to freeway or, at a minimum, to expressway standards.  Currently, a $274 million widening project in...

Rep. Sue Myrick's letter to Gov. Easley and Sect. Tippett published in Charlotte Observer

US. Representative Sue Myrick's (R-Charlotte) letter to North Carolina's Governor Mike Easley and NC Transportation Secretary Lyndo Tippett was published in the Friday, November 30th edition of the Charlotte Observer . Why are we delaying the completion of 1-485 in Charlotte again? I read in The Charlotte Observer how rising prices of materials are leading to the delay. Why didn't these same rising costs delay the loops in Fayetteville and Wilmington? Why are we building loops in Fayetteville and Wilmington before we complete the one in Charlotte? We were working on the one in Charlotte back when I was mayor. That was 20 years ago! ... Last I looked Charlotte was the largest city in the state. There seems to be no recognition of that fact in Raleigh. No recognition that we are at a standstill with traffic. No recognition that we have a traffic problem. Nor is there any recognition of the fact that the state DOT utterly botched up the southern leg of our yet to be completed ...

I-90 in Albany, New York and the Berkshire Spur

Today's Albany Times Union has a segment in their weekly Getting There? column that explains some of the history behind how I-90 is designated in the Albany, NY area as well as the Berkshire Spur. The long and short of the article was that I-90 was originally designated on the unsigned portion of the Berkshire Spur, but as free I-90 was built, the designation was moved onto the free portion of road. Additionally, there were talks in 1999 between state and federal officials about the possibility of moving I-90 back onto the unsigned portion of the Berkshire Spur, while extending I-88 onto what we know as free I-90. There would have also had been an I-88/I-90 multiplex between Rotterdam and Albany as a result. http://www.timesunion.com/AspStories/story.asp?storyID=916307