Skip to main content

New England Road Trip Day 2 - Traveling VT 100

Have you ever wanted to travel on a single route number for as long as you can take it?  To make as many stops as you can along that route?

Well for a long time Vermont 100 has been one of those routes that I wanted to complete in one day.   Nearly 216 miles on one two lane highway through the heart of Vermont.  The idea of driving VT 100 in one setting was inspired by an entry in The Most Scenic Drives in America: 120 Spectacular Road Trips.  I often refer to this book and other scenic drive books as ideas for various roadtrips.

How did we drive it:  We left Doug's place at 6:30 am and arrived in North Conway, NH at around 8 pm.

Our Route: I-890, I-90, US 9/20, NY 150, NY 43, NY 351, NY/MA 2, MA/VT 8, VT 9 , VT 100, VT 105, US 5, I-91, VT 105, VT 114, VT 122, I-91, I-93, US 302.

(Full Disclosure: we did skip one small segment of VT 100 south of Wilmington - I had already driven that section of VT 100 numerous times so we stated on VT 8 and rejoined VT 100 in Wilmington.)

For the full photo set from the Vermont leg of this journey head here.

Of course a roadtrip into Vermont isn't complete without a stomp at the Medburyville Truss Bridge.

077

Doug and I now jokingly call this the "Bridge for all Seasons" or the "Bridge for all Roadtrips" because it has always been a stop.  And since this was Joe's first time in New England so it was a must stop.

As I said earlier, the day was damp and overcast.  There were some breaks of sun at times, but many times it was misty and foggy.  But it allowed for some great views like this one at where VT 100 meets VT 30.

084

Just north of here is the Town of Jamaica.  This was the first town that we stopped and walked around in.

089

096

North of Jamaica, we took a brief detour onto to VT 100A and the town of Plymouth Notch and the birthplace of President Calvin Coolidge.

The birthplace and homestead is a State Historic Site.  However, when we visited, it was closed for the season.  As a result, the visitor's center and a number of buildings were not open, but we were still able to walk around.

099

110

116

What amazed me the most about Plymouth Notch was how the Coolidge site was still part of everyday life in this part of rural Vermont.

Throughout much of our time on Vermont 100, damage from the flooding that occurred from the remnants of Hurricane Irene was painfully visible.  Temporary bridges, washed out homes, and downed trees were common place.  Here is some of the damage from just north of Killington.

124

126

We stopped in Rochester for gas and also walked around a bit.

135

138

We then took a detour on Scenic VT 125 to check out Texas Falls.  Route 125 is interesting as it contains a special 'Scenic' banner.  And the signs we saw just off of VT 100 has a slowly disappearing white on green banners.

142

Texas Falls is worth the 10 or so minute drive off of VT 100 in Hancock.  It is located within Green Mountain National Forest and is a very popular attraction.  See the entire set of Texas Falls photos here.

167

186

Back on VT 100, we come to another spectacular set of falls, and this is located right off the highway.  Moss Glen Falls (Big and Little) are a pair of spectacular falls located near Granville.

203

It wouldn't be a roadtrip with Doug without finding something absurd.

234

Old sign fun in Waterbury.

242

And what trip through Waterbury, Vermont wouldn't be complete without a stop at Ben & Jerry's!  Or even better, the Flavor Graveyard.

251

253

We stopped and walked around the resort town of Stowe.  It was very busy for a Friday afternoon in early May.

264

265

273

Just outside Stowe is another Moss Glen Falls.  This one requires a little bit of a hike but is well worth the effort!


283

284

As you get closer to Canada, VT 100 takes on more of a highlands feel.  And of course to prove that we did get to the North End of VT 100.  Here's the end sign!

307

Next was a trip to Derby Line and the furthest north we could get without getting into Canada.

In Newport, there's a nice old button copy sign left over.

Ancient Vermont Button Copy

And you can't get any further north in Vermont than here.

310

We wanted to visit the Haskell Free Library and Opera House to technically be in Quebec.  It is built on the boundaries of the two countries; however, we were about a half hour or so late.  It closed at 5 pm.

So it was onto I-91 and pretty much the beginning of Interstate 91 South - unless you were entering from Quebec.

312

After exiting off of I-91 and taking VT 105 and VT 114 south towards Lyndonville, we did find two covered bridges in the Lyndonville Area.  The Randall Bridge is off of VT 114.

317

Closer to Lyndonville and just off of VT 122 is the Miller's Run Covered Bridge.

323

From there it was back on I-91 South and then I-93 South into New Hampshire.

Beginning of Interstate 93 South

We'll pick up with our twilight journey into New Hampshire on the next blog post.

Comments

Unknown said…
Road tripping to New England has always been a dream of mine. I just booked a Cape Cod summer rental so I can this summer! I cannot wait to explore!

Popular posts from this blog

Paper Highways: The Unbuilt New Orleans Bypass (Proposed I-410)

  There are many examples around the United States of proposed freeway corridors in urban areas that never saw the light of day for one reason or another. They all fall somewhere in between the little-known and the infamous and from the mundane to the spectacular. One of the more obscure and interesting examples of such a project is the short-lived idea to construct a southern beltway for the New Orleans metropolitan area in the 1960s and 70s. Greater New Orleans and its surrounding area grew rapidly in the years after World War II, as suburban sprawl encroached on the historically rural downriver parishes around the city. In response to the development of the region’s Westbank and the emergence of communities in St. Charles and St. John the Baptist Parishes as viable suburban communities during this period, regional planners began to consider concepts for new infrastructure projects to serve this growing population.  The idea for a circular freeway around the southern perimeter of t

Hernando de Soto Bridge (Memphis, TN)

The newest of the bridges that span the lower Mississippi River at Memphis, the Hernando de Soto Bridge was completed in 1973 and carries Interstate 40 between downtown Memphis and West Memphis, AR. The bridge’s signature M-shaped superstructure makes it an instantly recognizable landmark in the city and one of the most visually unique bridges on the Mississippi River. As early as 1953, Memphis city planners recommended the construction of a second highway bridge across the Mississippi River to connect the city with West Memphis, AR. The Memphis & Arkansas Bridge had been completed only four years earlier a couple miles downriver from downtown, however it was expected that long-term growth in the metro area would warrant the construction of an additional bridge, the fourth crossing of the Mississippi River to be built at Memphis, in the not-too-distant future. Unlike the previous three Mississippi River bridges to be built the city, the location chosen for this bridge was about two

Memphis & Arkansas Bridge (Memphis, TN)

  Like the expansion of the railroads the previous century, the modernization of the country’s highway infrastructure in the early and mid 20th Century required the construction of new landmark bridges along the lower Mississippi River (and nation-wide for that matter) that would facilitate the expected growth in overall traffic demand in ensuing decades. While this new movement had been anticipated to some extent in the Memphis area with the design of the Harahan Bridge, neither it nor its neighbor the older Frisco Bridge were capable of accommodating the sharp rise in the popularity and demand of the automobile as a mode of cross-river transportation during the Great Depression. As was the case 30 years prior, the solution in the 1940s was to construct a new bridge in the same general location as its predecessors, only this time the bridge would be the first built exclusively for vehicle traffic. This bridge, the Memphis & Arkansas Bridge, was completed in 1949 and was the third