Hogback Drive (Fresno County and Tulare County)


Hogback Drive is an approximately 4.6-mile rural highway located in the Sierra Nevada range of Fresno County and Tulare County.  This corridor begins at California State Route 245 near Pinehurst in Fresno County.  From the Pinehurst area the roadway heads south onto Hogback Ridge in Tulare County and terminates after approximately 4.6 miles at Whitaker Forest Road.  The Tulare County portion is maintained as Mountain Road 254.  Hogback Drive was constructed in the 1890s to facilitate travel between Camp Badger and the Hume-Bennett Logging Company town of Noble (now Pinehurst). 




Part 1; the history of Hogback Drive

Hogback Drive was constructed in the 1890s as one of two roads which connected Camp Badger in Tulare County to the Hume-Bennett Logging Company town of Noble (alternatively known as Neff Mills) in Fresno County.  The road to between Camp Badger and Noble was constructed mostly just outside the boundary of the Sierra Forest Reserve which was established during February 1893.  The portion of the reserve which Hogback Drive now traverses was spun off as part of Sequoia National Forest during July 1908. 

Hogback Drive is named after Hogback Ridge which is mostly located in Tulare County.  Hogback Drive can be seen branching northeast from Camp Badger towards the Fresno County line on the 1892 Thompson Atlas of Tulare County in Township 15S, Range 27E.  The road directly north of Badger eventually became known as Pinehurst Road.  Pinehurst Road would later become California State Routes 65, 69 and currently 245.   


Hogback Drive can be seen connecting Badger and Neff Mills (now Pinehurst) on the 1924 United States Geological Survey map of Dinuba.  The corridor is shown to be fully east of Badger Creek atop Hogback Ridge. 


Hogback Drive can be seen beginning at California State Route 180 near Pinehurst on the 1935 Division of Highways map of Fresno County.  The corridor is shown terminate on the 1935 Division of Highways map of Tulare County at Whitaker Forest Road near Badger and California State Route 65.  During summer 1941 California State Route 180 would be relocated north of Mill Creek which led to California State Route 65 being extended through the Pinehurst area.  





Part 2; traversing Hogback Drive

Southbound Hogback Drive begins in Sequoia National Forest at California State Route 245 near Pinehurst in Fresno County.  


Hogback Drive descends via a series of switchbacks from the Pinehurst area and enters Tulare County at Hogback Ridge.  Upon entering Tulare County, the roadway departs Sequoia National Forest.  Hogback Drive within Tulare County is assigned as Mountain Road 254 and has Postmile paddles.  
































Hogback Drive passes numerous residents and rural ranches.  The corridor terminates at Whitaker Forest Road near Badger.  








Comments

Popular posts from this blog

The case to move Interstate 73 in Southern Ohio onto US 33

Every decade or so, Ohio pushes to revisit the proposed Interstate 73 that would connect Michigan to Myrtle Beach, South Carolina.  It's been happening since Congress legislated the route in 1991.  Within Ohio, Interstate 73 generally follows the US 23 corridor from Portsmouth through Columbus to Toledo, and into Michigan. Since High Priority Corridor Five was created , Ohio has really done nothing to move forward with Interstate 73.  Sure, there have been feasibility studies here and there.  But actual dollars and construction just haven't occurred. The US 33 Nelsonville Bypass appears to have been built to Interstate standards. However, Ohio has been slowly upgrading US 33 to a full freeway through Southeastern Ohio.  Bypasses of Lancaster and Nelsonville opened in 2004 and 2013, respectively.  Other sections of two-lane road are being twinned, some to freeway or, at a minimum, to expressway standards.  Currently, a $274 million widening project in...

Rep. Sue Myrick's letter to Gov. Easley and Sect. Tippett published in Charlotte Observer

US. Representative Sue Myrick's (R-Charlotte) letter to North Carolina's Governor Mike Easley and NC Transportation Secretary Lyndo Tippett was published in the Friday, November 30th edition of the Charlotte Observer . Why are we delaying the completion of 1-485 in Charlotte again? I read in The Charlotte Observer how rising prices of materials are leading to the delay. Why didn't these same rising costs delay the loops in Fayetteville and Wilmington? Why are we building loops in Fayetteville and Wilmington before we complete the one in Charlotte? We were working on the one in Charlotte back when I was mayor. That was 20 years ago! ... Last I looked Charlotte was the largest city in the state. There seems to be no recognition of that fact in Raleigh. No recognition that we are at a standstill with traffic. No recognition that we have a traffic problem. Nor is there any recognition of the fact that the state DOT utterly botched up the southern leg of our yet to be completed ...

I-90 in Albany, New York and the Berkshire Spur

Today's Albany Times Union has a segment in their weekly Getting There? column that explains some of the history behind how I-90 is designated in the Albany, NY area as well as the Berkshire Spur. The long and short of the article was that I-90 was originally designated on the unsigned portion of the Berkshire Spur, but as free I-90 was built, the designation was moved onto the free portion of road. Additionally, there were talks in 1999 between state and federal officials about the possibility of moving I-90 back onto the unsigned portion of the Berkshire Spur, while extending I-88 onto what we know as free I-90. There would have also had been an I-88/I-90 multiplex between Rotterdam and Albany as a result. http://www.timesunion.com/AspStories/story.asp?storyID=916307