Checking out I-40 Sign Changes in Greensboro

Took a Short (shorter than I'd planned, more later) trip through Greensboro on the new/old alignment of I-40 through Greensboro. Photos and comments below:

There was a notice by NCDOT that they were closing three left lanes going west around the old/new I-40/I-85 split east of Greensboro last Thursday night (5/21). I surmised that they were adding more to the I-85 signs that had become largely empty spaces since they removed the I-40 signage last September:
Turned out the assumption was correct, here's what the new signage looks like:
As you can see in this photo, and the closer view below, they've added a To US 421, since that route will be put on the Urban Loop, and a 'To North ( ). What is that for?
The only route that goes north from I-85 in its trip around the loop, now that the 421 route is changed, is I-73. But it will also go south from I-85 also in the future. Maybe that realization prompted the sign not to be put up? Maybe NCDOT is waiting until more signage is changed along the Loop? The next month or so may answer the question. If not, I may see if my contact who gave me heads up on when this project was starting can give me an answer.

Here's the photo at the split itself, the first few exit numbers beyond on once again I-40 are correct, but not all have changed:
Signs under the I-840 bridge in the distance still have Business 85 numbers. Here though are a couple of the first signs with the new I-40 exit numbers:
This one is for the future I-840 west, now just leading to US 70. The other is at the Exit 227 ramp showing...
The new numbers for future I-840 and McConnell Road, the remaining McConnell road signs by the bridge in the background feature the old Business 85 and tabs for the former I-85 numbers. The next sign with a new number also features other changes as well...

The shield for NC 6 has disappeared with the addition of the new exit number. The sign originally also had 'To North US 421' but that was removed when the route was routed onto I-40 a couple miles to the west. NC 6 was actually decommissioned about 4 years ago. Meanwhile, though the exit numbers have changed, and signs at the intersecting roadways have been changed to I-40, sign assemblies along the road have not changed, as the next photo shows...

The shields are both still Business 40/85. Plus they have not swapped out the mile posts as of yet:
The milepost is that of Business 85. The new exit number is for what was the exit for US 421 South. According to the 2010 Rand McNally Atlas there are no plans to make the old route of US 421 into a business route. If you see some drops in the photo, this is where it started raining, which would eventually cut the photos part of the trip short.
Another photo of Exit 222 where the removed US Route shield is more visible.
Another example of the lack of progress on the surface shields, the exit number is missing the US 421, but the shields seen beyond include a 'To North US 421.' The 6 shield assemblies in both directions (no photos) were still present beyond where US 29/70/220 enter. There were changes to the exit numbers though:
Exit 220, when I-40 was on the Loop, was for US 220 (I-73) South. Now the number is just for a road, though an important one, Randleman Road. The final new exit number signage are for the I-40/Business 85 split...
You'll notice that the exit tab is now on the left and that there is a missing North US 421 shield. US 220 is sent on I-40 only to take the next exit and cross now Business 85 again going south.
This was the last photo I could take before it started raining too hard, showing the split, the removed US 421 shield on the sign, but US 421 still included in the assembly beyond. You can also see construction on the new bridge that will carry I-40 west toward the interchange with Business 85. The US 421 shields have not been removed going further west to the other Loop interchange. There are also still a couple left going eastbound. The US 421 sign has been removed from the eastbound I-40 exit signs, and all the exit numbers have been changed, though there was a portable VMS put up indicating which exit to take for South 421. No other changes in exit signs were noted on the Loop.

They plan to close one direction of the whole I-40 section from the I-85 to US 29 the weekends of May 30-31 and June 6-7 to complete a resurfacing project. Hopefully, they can update the remaining signs at the same time. They can them move on to changing signs along the Loop. The project is supposed to be completed by July. My guess is they would prefer all the changes in place before the July 4 weekend, as they made these changes just before Memorial Day. I will hopefully be taking another trip, on a sunny day, to get photos of the remaining changes.

Comments

Mark Moore said…
Maybe the contractor here committed an error and meant to put south instead of north for I-73 and they caught themselves before putting I-73 there. If that's the case I'd except a "TO North I-73 Shield" for I-40 West through Greensboro added there as well
mike said…
No wonder my Garmin had me going through no road land for a couple of miles!
Anonymous said…
Does anyone know why the southern loop won't carry I-840? I think it'd be much easier to tell someone "To avoid Greensboro, take I-840 (the southern loop) until it dumps you back onto I-40". Every other city on the planet has a full beltway with the same number, why can't we?
Unknown said…
One of the main reasons that 840 wasn't put on the southern part of the loop was that it would mean another shield to be put on the signs, which are already confusing as it stands now. This is why I-40 was moved back to the original route. Also, if 840 is a true loop, it can't be signed east-west uniformly, so some other system would have be devised like changing east-west to north-south at some point or use INNER and OUTER loop terms like Raleigh did with I-440. People find the latter confusing still, so Raleigh is getting rid of the INNER/OUTER stuff. Charlotte, however, includes INNER/OUTER along with N/S/E/W labels.

In my opinion, they should tone down the "TO" shields. They are everywhere now in Greensboro and really confuse me, especially when they precede the actual road's shield (like TO I-40 before I-73)
By the way "TO NORTH" on that I-85 sign is just wrong. No numbered highway is easier to get to going North on that path.

Popular posts from this blog

Cajon Pass; Cajon Pass Toll Road, National Old Trails Road, US Route 66/91/395 and Interstate 15

This past weekend I spent some time in Cajon Pass traversing the many historic road alignments. Cajon Pass is located in San Bernardino County, California along the San Andreas Fault.  Cajon Pass  serves the boundary line between the Mojave Desert, the San Gabriel Mountains, San Bernardino Mountains and San Bernardino Valley.  Cajon Pass is historically one of the most traveled transportation corridors in American California and presently is served by four rail lines, Interstate 15 and California State Route 138. While Cajon Pass is known mostly for carrying US Route 66 it has carried numerous other signed highways that have had a significant impact on regional and national road travel.  While this is my best attempt to compile everything from the best sources I could find into one single transportation history blog regarding road travel in Cajon Pass I suspect as time goes on this article will be frequently updated.  If you have any information that you ...

Pardee Dam Road

Pardee Dam is a 358-foot-high concrete structure located near Campo Seco at the Calaveras County and Amador County Line.  Pardee Dam impounds the Mokelumne River which forms the namesake Pardee Reservoir.  Pardee Dam was completed during 1929 and is part of the East Bay Municipal Utility District.  Pardee Dam is accessed by the namesake Pardee Dam Road which crosses the structure via the one-lane road seen as the blog cover photo.   Part 1; the history of Pardee Dam Road The closest community to Pardee Dam is that of Campo Seco on the Calaveras County side of the Mokelumne River.  Campo Seco was founded in 1850 by Mexican Miners who worked placer claims in Oregon Gulch during the height of the California Gold Rush.  Campo Seco would reach a population of about three hundred by 1860 spurred by the numerous mining claims in the area.  Main Street of Campo Seco flowed directly into the Campo Seco Turnpike which had been authorized by the California L...

California State Route 82/Old US Route 101 on the El Camino Real from San Francisco to Interstate 380

After completing Interstate 380 I made my way northward into the City Limits of San Francisco to drive the northernmost portion of California State Route 82. CA 82 is 52 mile State Route between I-280 in San Francisco southward to Interstate 880 in San Jose.  CA 82 is significant due to it being part of the historical surface alignment of US Route 101 and the El Camino Real. The "El Camino Real" was a Spanish Highway in Las Californias and Alta California which connected the 21 Catholic Missions along the coast.  Essentially the route of the El Camino Real was plotted out in the late 1700s from two Spanish survey expeditions.  The Missions were plotted approximately 30 miles apart along the 600 mile route so that they would be a single day journey by horse.  The El Camino Real name fell into disuse after the Mexican Revolution of 1821 but was revived by American highway promoters in the 1890s and 1900s.  Today the El Camino Real is mostly associated...