Skip to main content

I-74/US 74 Freeway Now Open Eastbound from Maxton to Lumberton

Since Duke wasn't playing today and I figured all the Raleigh people may want to stay and watch the NC State-ECU game, I decided to take a tour to see the progress of the I-74 freeway in Robeson County. Since there had been no publication about an opening date I assumed the best I would find was a change in exit numbers based on an e-mail I sent to the project's engineer earlier this year in which he acknowledged the numbers were wrong. I thus was surprised when I got to (still) Exit 320 on I-74/US 74 and noticed traffic no longer had to get off the highway to proceed on the interstate eastbound. When I got to Exit still numbered 226 I had another surprise....
The road was open beyond the exit. Thus curious, I decided to proceed on. The next exit as listed in the plans should be Dew Road, Pembroke. It was, but notice the exit number...


It is now 203, 27 miles less than it should be and equal to the number for the milepost I sent to the NCDOT earlier in the year when I noticed the exit numbers were too large. The remaining exits match my mileposts (as posted in my I-74 Exit List) almost exactly:
Exit Plan Mile # Malme Mile # Actual Exit #
Dew Rd, Pembroke 230 203 203
Back Swamp Rd 234 207 207
I-95/US 301 235A/B 208A/B 209A/B
Alternate US 74 237 210 210
I assume as part of completing the project the rest of the exits starting in Laurinburg will be changed as well, I will post what those numbers should be on my exit list. I am assuming that NCDOT will not force the traveling public to use two sets of exit numbers on one continuous freeway.

Continuing on, here are some other photos of some of the signs along the eastbound route:

The speed limit is 70 mph, though they have not adjusted up the speed around the Exit (for now) 320 interchange which is still 55.
Here's the next exit eastbound Back Swamp Road, there's no obvious reason for an interchange here, development will occur, I guess, eventually.
Here's the first sign for the upcoming I-95/US 301 interchange, the only ground mounted sign.
The remainder are overhead assemblies, with separate ramps for north and southbound. The freeway becomes 3 lanes in each direction at that point.

Here's the overheads at Exit 209B. Coming back around I took the ramp that leads to C/D ramps paralleling I-95.

All is ready except opening the ramp and removing the cover on the I-74/US 74 West sign. The east signs on the C/D ramps were uncovered, but the interchange was not open and all I-74 signs on I-95 going south were covered as well.

Here's the last exit currently with a number, US 74 Alternate, there is one more exit, NC 41, but the signs haven't been updated there yet. They still have to do work to complete this final 2 mile section to bring it up to interstate standards, update the signs and close the former left turn ramps. The traffic on US 74 west still uses the old route alignment. The still need to fully grade between the old and new highways before this section can be open. The section west of I-95 was being worked on and appeared almost ready to open.

After turning around and using the existing US 74, I accessed the Dew Road interchange by taking Chicken Road off of US 74 to confirm all the westbound ramps were still not open to the east of NC 710. The eastbound signs were up, as expected, the one control city listed was Wilmington. The western ramps were closed and all the signs for the westbound roadway were up, but covered.

I believe construction could be totally finished in the next few weeks. I'll wait until an official announcement to make another tour, other interested parties are invited.

Comments

Anonymous said…
This comment has been removed by a blog administrator.
Bob Malme said…
NCDOT will open the rest of the freeway (at least west of I-95) after a ribbon cutting ceremony on Friday Sept. 26 at 10AM.
Bob Malme said…
The road is now open in both directions according to this NCDOT press release:
https://apps.dot.state.nc.us/pio/releases/details.aspx?r=1869s

Hopefully more photos of the route will be up soon.

Popular posts from this blog

New River Gorge National Park & Preserve - Thurmond

New River Gorge National Park and Preserve is best known for whitewater rafting and other forms of adventure tourism.  Yet, found in the hollows and isolated valleys are quiet farms and former coal mining towns.  Well off the beaten path and isolated from much of its surroundings, Thurmond provides a unique view into Central West Virginia's industrial past. Thurmond began as a railroad town in the late 1800s.  Sparked by the arrival of the Chesapeake & Ohio Railroad and the local coal industry, Thurmond quickly grew into a sizeable transportation and coal center.  When it incorporated as a town in 1903, Thurmond was a full-fledged community - home to two banks, two hotels, and many other services and stores. A CSX freight train passes the old coaling tower in Thurmond.  It was here that many steam locomotives would refill and refuel. Thurmond was home to a C&O railyard which serviced the numerous steam engines passing through the narrow valley.  Thu...

The Tale of Tollhouse Road, western California State Route 168 and failed Piute Pass Highway

Western California State Route 168 is entirely located in Fresno County and is linked historically to the Tollhouse Road corridor.   Tollhouse Road is one of the oldest highways in the Sierra Nevada range of Fresno County. The corridor presently begins in at Clovis Avenue in downtown Clovis and extends northeast to Huntington Lake. In 1866 the Woods Brothers established mining claims on Pine Ridge. In 1867 Fresno County would grant the brothers a toll franchise to construct a roadway to the desirable logging areas atop Pine Ridge and near Dinkey Creek. The Woods would establish a tollhouse at the start of their franchise road and lumber mill. The lumber mill attracted settlers which led to the establishment of the mountain town of Tollhouse. Fresno County would purchase the Tollhouse Road in 1878 and make it a public highway. The county would remove the tolls and incorporate the corridor into the existing county road network. Prior to the establishment of Clovis in 1...

Old Dunlap Road (former California State Route 180 in Yokuts Valley)

When California State Route 180 was commissioned in August 1934 the alignment in took in Sierra Nevada range was very different than from today.  The original highway alignment from Squaw Valley (now Yokuts Valley) to east Grant Grove (then part of General Grant National Park) originally followed what is now Ruth Hill Road, Dunlap Road, Pinehurst Road (modern California State Route 245), Dark Canyon Road (partially now Forest Road 14S45).  After funding fell through for the planned Kings Canyon Road the was corridor eventually picked up as a 30-mile-long cooperative project between the Division of Highways and Federal Government.  Much of current alignment of California State Route 180 bypassing Squaw Valley (now Yokuts Valley) and Dunlap was complete by 1941.  The post-1941 alignment of California State Route 180 in Squaw Valley was shifted onto what was once Dunlap Road in Squaw Valley.  This alignment itself was later bypassed by modern California State Route...