Skip to main content

A detailed look at the King Coal Highway

A few weeks ago, I received a packet from the West Virginia Division of Highways. I had requested maps on their proposed routings for the King Coal, Coalfields, and Tolsia Highways. King Coal and Tolsia are designated to be a part of the fun and exciting I-73/74 project.

The reason why I requested these maps is that these three routes are widely discussed but no one (that I know of) really has any clue on what the routings of these three highways are to/or could be.

So let's take a closer look at the King Coal Highway (Future I-73/74):

WVDOH has broken down the route into segments similar to what they have done with Corridor H. In total, there are ten segments and two connector routes that are to be built for the King Coal.

I will be heading South to North starting at the US 52 interchange with US 460 (just west of I-77 exit 1) to US 119 near Belo and where US 119 intersects WV 65.

Segment 1: Bluefield (US 52/460) to Mercer County Airport (WV 123). Length 2.3 miles.

The status for this section is that the US 52/460 interchange has been built and partially open while the King Coal waits to be extended northward. Currently, construction is underway to extend the highway from the US 52/460 interchange northward. A $16.3 million project is extending the highway over US 19 to Stoney Ridge. That project is about 34% complete.

Mercer County officials hope to see about $53 million in new funding to complete this segment of highway to the Mercer County Airport.

Segment 2: Mercer County Airport (WV 123) to Littlesburg (WV 20). Length 3 miles.

Mercer officials hope that this section will receive funding soon in addition to or part of the $53 million request they have made.

Segment 3: Littlesburg (WV 20) to Montcalm . Length 2.7 miles.

This segment crosses over WV 71 and over the Bluestone River.

Segment 4: Montcalm to Northfork. Length 16 miles.

The King Coal remains north of US 52 and pretty much will hover along the Wyoming/McDowell County Line. The Shawnee Parkway will also intersect the King Coal within this segment.

Segment 5: Northfork to Coalfields Expressway Interchange. Length 8 miles.

King Coal will continue to hover the Wyoming/McDowell County line to the interchange with the Coalfields Expressway north of Welch. The Coalfields/King Coal interchange has been completed but sits empty and unused until the two highways finally reach the three level interchange.

Segment 6: Coalfields Expressway Interchange to US 52 at the Wyoming/McDowell County Line. Length 17 miles.

This will be the first time since Bluefield that the King Coal will intersect the current route of US 52.

Segment 7: US 52 at the Wyoming/McDowell County line to Mingo/Wyoming/McDowell County Lines (County Route 13). Length 5 Miles.

The King Coal now running to the south and west of US 52 continues to hug the McDowell/Wyoming County line until it nears the tri-point of Mingo/Wyoming/McDowell south of Gilbert.

Segment 8: Mingo/Wyoming/McDowell County Line (CR 13) to Mountain View (WV 44 connector). Length 11 miles.

Now entirely in Mingo County. This segment will end at the WV 44 Connector a few miles south of Mountain View and where WV 44 currently ends at US 52.

The WV 44 connector will run about 1-2 miles north from the King Coal to where WV 44 meets US 52.

Segment 9: Mountain View (WV 44 Connector) to Delbarton (US 52). Length 15 miles.

This segment ends at US 52 between WV 65/Delbarton and US 119 in Williamston. From here it appears that the King Coal will use a brief segment of US 52 before splitting in two.

Segment 10: Delbarton (US 52) to Belo (US 119) Length 6.8 miles.

This segment will run from US 52 to where WV 65 North meets US 119 near Belo. From here there will be a brief routing along US 119 before the continuation of I-73/74 northwards along the Tolsia Highway.

Segment 10A: Williamson Connector - Delbarton (US 52) to Goodman (US 52/119). Length 5.7 miles.

The connector will branch off of the King Coal west of Delbarton and cross over US 52 north of Williamson before meeting current US 52/119 near Chattaroy.

So that's it, and about all I know on it. The maps painted a much clearer picture of what the planned route of this highway will be. (Now if I can get there to take photos) When I work on my WV updates later this summer, I will include this on a new page and also try to scan the large King Coal Highway (Build Alternatives) map that I received.

Comments

Popular posts from this blog

New River Gorge National River Area To Become A National Park

Great news for those that enjoy National Parks, West Virginia's New River Gorge Region, or West Virginia tourism.  Included within the Fiscal Year 2021 Omnibus Appropriations Bill signed by President Trump last night (December 27th) is the New River Gorge Park and Preserve Designation Act.   The act will designate the existing New River National River and over 72,000 acres of land within it as a National Park and Preserve. The New River Gorge Bridge will continue to be the centerpiece of the new New River Gorge National Park and Preserve. (Adam Prince, 2007) The river and surrounding land, which was added to the National Park System in 1978, will be our 63rd National Park.   The designation preserves over 7,000 acres as a National Park.  This area will not allow any hunting.  The remaining 65,000 acres of the existing park will be designated as a preserve allowing hunting and fishing. The main attractions to the New River Gorge - whitewater rafting, camping, hiking, mountain bikin

Douglas Memorial Bridge; the ruins of US Route 101 and the Redwood Highway over the Klamath River

Near the village of Klamath in southern Del Norte County, California sits the ruins of Douglas Memorial Bridge which once carried US Route 101 and the Redwood Highway over the Klamath River.  The Douglas Memorial Bridge was a arch concrete span which once crossed the Klamath River.  The Douglas Memorial Bridge was noted for it's unique grizzly bear statues which still adorn the remains of the structure.  Completed in 1926 the Douglas Memorial Bridge was the original alignment of US Route 101 ("US 101") and stood until it was destroyed by the Christmas Floods of 1964.  The Douglas Memorial Bridge is named in honor of G.H. Douglas who was a Assemblyman of the First District of California.  Below the Douglas Memorial Bridge can be seen during it's prime (courtesy bridgehunter ).  Part 1; the history of the Douglas Memorial Bridge The history of what would become US 101/Redwood Highway begins with the approval of the 1909 First State Highway Bond Act .  The First Stat

The Great PA 48 Clearance Sale

It's not often that any department of transportation sells land it purchased.  They are usually in the business of acquiring land for right-of-way.  But in 1982, the Pennsylvania Department of Transportation did exactly that.  Offering to buyers land it purchased just 15 years earlier for the never-built Route 48 Expressway. Background: The sale was a result of the 1970s cash crunch the PennDOT experienced.  Many projects were cut back, shelved, or eliminated.  The 'New 48', or the North-South Parkway, which was touted for nearly 20 years as a connection from the industrial Mon Valley to the Turnpike and Monroeville was one of the casualties. In the mid-late 1960s, movement to construct the new highway began with targeting a two-mile stretch of highway from the Route 48 intersection at Lincoln Way in White Oak to US 30 in North Versailles.  The plan was then to continue the highway northwards to Monroeville.  Extension south across the Youghiogheny River and to PA 51 would