A detailed look at the Coalfields Expressway

Returning to the WVDOH maps I received on various projects. This time, a look at the Coalfields Expressway.

Recently, a small segment of the highway opened around Sophia earlier this year.

There are eight segments for the Coalfields Expressway (currently signed as WV 121), running from the Virginia State Line to the I-64/77 interchange south of Beckley.

Here's a look at them running South to North.

Segment 1 - Virginia State Line to Bradshaw (WV 80). Length - 7 miles:

The Coalfields Expressway will roughly follow existing WV 83 from the VA line to WV 80 in Bradshaw.

Segment 2 - Bradshaw (WV 80) to Welch (US 52) - Length - 14 miles:

This segment will parallel WV 83 to near the town of English. From that point, it will run parallel and to the west of WV 16 to US 52 a few miles west of Welch.

Segment 3 - Welch (US 52) to King Coal/Coalfields Interchange (Future I-73/74) - Length - 6 miles:

The Coalfields will run to Welch's west, and cross County Route 7 South and East of Capels. It will meet the King Coal at an already completed interchange that now sits empty.

Segment 4 - King Coal/Coalfields Interchange (Future I-73/74) to Pineville (WV 10/16) - Length - 8 miles:

Coalfields will intersect WV 16 near Wolf Pen. It meets WV 10/16 east of Pineville.

Segment 5 - Pineville (WV 10/16) to Mullens (WV 54) - Length: 7.5 Miles:

This section roughly parallels WV 16 to the north; ending at WV 54 north of Mullens.

Segment 6 - Mullens (WV 54) to Surveyor Road - Length - 10 miles:

This section is shown under construction in the 2006/07 West Virginia Highway Map. (See Below)


Segment 7 - Surveyor Road to Sophia (WV 16/54) - Length - 3 miles:

Parts if not all of this segment have opened for use. This segment is forked as near Sophia a part of the Coalfields branches to the existing five lane (four and center turn lane) WV 16.

Segment 8 - Sophia to I-64/77 Interchange - Length - 3.6 miles:

This segment will run to the current I-64/77 Interchange. This interchange is currently a 'Directional-Y' interchange. I have yet to see the design of what a Coalfields/I-77/I-64 Interchange will look like.

Comments

Anonymous said…
WILL WE SEE THIS COMPLETED IN OUR LIFETIME....I'M 60
Anonymous said…
Hope they buy me out for sure location groundhog in between Bradshaw and Jolo

Popular posts from this blog

I-40 rockslide uncovers old debates on highway

The Asheville Citizen-Times continues to do a great job covering all the angles of the Interstate 40 Haywood County rock slide. An article in Sunday's edition provides a strong historical perspective on how the Pigeon River routing of Interstate 40 came about. And perhaps most strikingly, in an article that ran just prior to the highway's opening in the fall of 1968, how engineers from both Tennessee and North Carolina warned "...that slides would probably be a major problem along the route for many years." On February 12, 1969, not long after the Interstate opened, the first rock slide that would close I-40 occurred. Like many other Interstates within North Carolina, Interstate 40 through the mountains has a history prior to formation of the Interstate Highway System and was also a heated political battle between local communities. The discussion for a road that would eventually become Interstate 40 dates back to the 1940's as the idea for interregional high

Mines Road

Mines Road is an approximately twenty-eight-mile highway located in the rural parts of the Diablo Range east of the San Francisco Bay Area.  Mines Road begins in San Antonio Valley in Santa Clara County and terminates at Tesla Road near Livermore of Alameda County.  The highway essentially is a modern overlay of the 1840s Mexican haul trail up Arroyo Mocho known as La Vereda del Monte.  The modern corridor of Mines Road took shape in the early twentieth century following development of San Antonio Valley amid a magnesite mining boom.  Part 1; the history of Mines Road Modern Mines Road partially overlays the historic corridor used by La Vereda del Monte (Mountain Trail).  La Vereda del Monte was part of a remote overland route through the Diablo Range primarily used to drive cattle from Alta California to Sonora.  The trail was most heavily used during the latter days of Alta California during the 1840s. La Vereda del Monte originated at Point of Timber between modern day Byron and Bre

Former California State Route 41 past Bates Station

When California State Route 41 was commissioned during August 1934 it was aligned along the then existing Fresno-Yosemite Road north of the San Joaquin River.  Within the Sierra Nevada foothills of Madera County, the original highway alignment ran past Bates Station via what is now Madera County Road 209, part of eastern Road 406 and Road 207.   Bates Station was a stage station plotted during the early 1880s at what was the intersection of the Coarsegold Road and Stockton-Los Angeles Road.   The modern alignment bypassing Bates Station to the east would be reopened to traffic during late 1939.   Part 1; the history of California State Route 41 past Bates Station Bates Station was featured as one of the many 1875-1899 Madera County era towns in the May 21, 1968, Madera Tribune .  Post Office Service at Bates Station is noted to have been established on November 23, 1883 and ran continuously until October 31, 1903.  The postal name was sourced from Bates Station owner/operator George Ba