Prunedale Road is a short 2.6-mile-long frontage corridor of US Route 101 in the namesake Monterey County community of Prunedale.  Prior to 1932 US Route 101 bypassed Prunedale in favor of the San Juan Grade to the east.  Prunedale Road along with nearby Moro Road served as an alternative connecting highway between Salinas and San Juan Bautista.  Following the realignment of US Route 101 onto the Prunedale Cutoff the former through route along Prunedale Road would be rendered as a western frontage.  




Part 1; the history of Prunedale Road

Prunedale Road is located in and is named after the Monterey County community of Prunedale.  Said community was founded near the junction of San Migeul Canyon, Langley Canyon and Echo Valley.  Watsonville settler Charles Langley (namesake of Langley Canyon) was one of the prominent early community settlers.  The Prunedale Post Office would open for the first time in 1894 but would close by 1908.  Early agriculture in the area consisted of Plum Trees which failed due to a lack of irrigation.  

Upon the passage of the 1909 First State Highway Bond Act Legislative Route Number 2 (LRN 2) was defined as a highway running from San Diego north to the San Francisco city limit.  The corridor was planned to bypass Prunedale in favor of going over the Gabilan Range to San Juan Bautista following the general corridor now part of Old Stage Road.  

The rationale for selecting the routing of the San Juan Grade through the Gabilan Range (referenced as San Juan Mountain) is noted to be three-fold in the January 1913 California Highway Bulletin.  The route through the Gabilan Range was the most direct and particle route between Salinas Valley-Santa Clara Valley, within seven miles of the San Benito County seat of Hollister and had an estimated gradient ranging from 2-6%.  The existing route of American El Camino Real over Old Stage Road is noted to be direct, and it would be desirable for LRN 2 to follow nearby over a better grade.  




The January 1915 California Highway Bulletin noted LRN 2 had been completed over the San Juan Grade from the Monterey County Line north to San Jaun Bautista.  The San Juan Grade despite not yet being paved immediately saw service as a replacement for Old Stage Road.  LRN 2 north of San Juan Bautista north to the Santa Clara County is cited to have gone through the process of a rejected contract and was now being constructed via prison labor.  


The January 1915 California Highway Bulletin noted the San Juan Grade from Salinas to the San Benito County line had been completed as an unpaved highway. 


Early LRN 2 over the San Juan Grade can be seen bypassing Prunedale to the east on the 1917 United States Geological Survey map of San Juan Bautista.  Prunedale Road can be seen as part of the alternate through route to San Juan Bautista along with Moro Road through Langley Canyon.  The Prunedale School can be seen on Prunedale Road just south of where the current California State Route 156 west of US Route 101 overpasses.  Prunedale Road south of Prunedale is shown following modern Martines Road and Harrison Road into Salinas. 


During November 1926 the US Route System would be approved by the American Association of State Highway Officials.  The San Juan Grade and the entirety of LRN 2 were assigned as part of US Route 101.  

The October 1931 California Highways & Public Works featured the construction of the Prunedale Cutoff which would replace the San Juan Grade as the new alignment of US Route 101/LRN 2.  The Prunedale Cutoff alignment of US Route 101/LRN 2 is noted to bypass San Juan Bautista by way of the communities of Santa Rita, Prunedale and Dumbarton.  The Prunedale Cutoff is noted to have a planned crossing of the Gabilan Range at 550 feet above sea level versus the 1,050-foot elevation used by the San Juan Grade.  The article notes the Prunedale Cutoff was anticipated to be opened to traffic during the summer of 1932.  



The April 1932 California Highways & Public Works noted the new alignment of US Route 101/LRN 2 was scheduled to open to traffic on July 1.  The article stub notes that the San Juan Grade would be retained as part of the State Highway System.  The Prunedale Cutoff alignment of US Route 101/LRN 2 is noted to pass by the former bandit's lair known as the Pinecate Rocks.  


The opening of the Prunedale Cutoff as the new alignment of US Route 101/LRN 2 was featured in the August 1932 California Highways & Public Works.  The Prunedale Cutoff was opened to traffic on July 20, 1932, upon the completion of a dedication ceremony.  The Prunedale Cutoff is shown to have a terminal elevation of 473 feet in the Gabilan Range compared to the 1,016 feet on the San Juan Grade. 



The Prunedale Cutoff would bypass Moro Road and Prunedale Road.  Both corridors remained as frontages west of US Route 101 serving the Prunedale community.  Prunedale Road can be seen spanning from US Route 101 west of the highway northward to San Miguel Canyon Road (then LRN 22) on the 1939 United States Geological Survey map of San Juan Bautista.  




Part 2; a drive on Prunedale Road

As California State Route 156 westbound branches away from US Route 101 traffic can access both North and South Prunedale Road.  The northern branch of Prunedale Road passes through the current business district of Prunedale towards San Miguel Canyon Road (Monterey County Route G12).  


Southbound Prunedale Road crosses over California State Route 156 near the former site of the Prunedale School.  The roadway has a major intersection at Blackie Road.  Beyond Blackie Road the corridor of Prunedale Road crosses over US Route 101 and terminate at Reese Circle.












Comments

Popular posts from this blog

The case to move Interstate 73 in Southern Ohio onto US 33

Every decade or so, Ohio pushes to revisit the proposed Interstate 73 that would connect Michigan to Myrtle Beach, South Carolina.  It's been happening since Congress legislated the route in 1991.  Within Ohio, Interstate 73 generally follows the US 23 corridor from Portsmouth through Columbus to Toledo, and into Michigan. Since High Priority Corridor Five was created , Ohio has really done nothing to move forward with Interstate 73.  Sure, there have been feasibility studies here and there.  But actual dollars and construction just haven't occurred. The US 33 Nelsonville Bypass appears to have been built to Interstate standards. However, Ohio has been slowly upgrading US 33 to a full freeway through Southeastern Ohio.  Bypasses of Lancaster and Nelsonville opened in 2004 and 2013, respectively.  Other sections of two-lane road are being twinned, some to freeway or, at a minimum, to expressway standards.  Currently, a $274 million widening project in...

Rep. Sue Myrick's letter to Gov. Easley and Sect. Tippett published in Charlotte Observer

US. Representative Sue Myrick's (R-Charlotte) letter to North Carolina's Governor Mike Easley and NC Transportation Secretary Lyndo Tippett was published in the Friday, November 30th edition of the Charlotte Observer . Why are we delaying the completion of 1-485 in Charlotte again? I read in The Charlotte Observer how rising prices of materials are leading to the delay. Why didn't these same rising costs delay the loops in Fayetteville and Wilmington? Why are we building loops in Fayetteville and Wilmington before we complete the one in Charlotte? We were working on the one in Charlotte back when I was mayor. That was 20 years ago! ... Last I looked Charlotte was the largest city in the state. There seems to be no recognition of that fact in Raleigh. No recognition that we are at a standstill with traffic. No recognition that we have a traffic problem. Nor is there any recognition of the fact that the state DOT utterly botched up the southern leg of our yet to be completed ...

I-90 in Albany, New York and the Berkshire Spur

Today's Albany Times Union has a segment in their weekly Getting There? column that explains some of the history behind how I-90 is designated in the Albany, NY area as well as the Berkshire Spur. The long and short of the article was that I-90 was originally designated on the unsigned portion of the Berkshire Spur, but as free I-90 was built, the designation was moved onto the free portion of road. Additionally, there were talks in 1999 between state and federal officials about the possibility of moving I-90 back onto the unsigned portion of the Berkshire Spur, while extending I-88 onto what we know as free I-90. There would have also had been an I-88/I-90 multiplex between Rotterdam and Albany as a result. http://www.timesunion.com/AspStories/story.asp?storyID=916307