Skip to main content

Echo Valley Road (Monterey County)


Echo Valley Road is an approximately three mile connecting highway through the Gablian Range in the Prunedale area.  The corridor begins at Monterey County Route G12 at San Miguel Canyon Road and extends east to an interchange located at US Route 101.  Echo Valley Road originated near the founding of Prunedale during the 1890s but did not become a modernized roadway until the middle of the twentieth century.  




Part 1; the history of Echo Valley Road

Echo Valley is located in the community of Prunedale.  Said community was founded near the junction of San Migeul Canyon, Langley Canyon and Echo Valley.  Watsonville settler Charles Langley (namesake of Langley Canyon) was one of the prominent early community settlers.  The Prunedale Post Office would open for the first time in 1894 but would close by 1908.  Early agriculture in the area consisted of Plum Trees which failed due to a lack of irrigation.  

What is now modern Echo Valley Road can be seen on the 1917 California State Automobile Association map.  Said map shows the roadway extending east from the site of Prunedale along modern San Miguel Canyon Road east to Legislative Route Number 2 at the San Juan Grade (future US Route 101).  The corridor is shown be a minor roadway and also comprises what is Crazy Horse Canyon Road.  


During 1932 US Route 101 was realigned off the San Juan Grade through the so-called "Prunedale Cutoff" through Langley Canyon.  The then new alignment of US Route 101 spurred development of Prunedale and the community reobtained Post Office service in 1953.  A modernized roadway through Echo Valley first appears on the 1956 United States Geological Survey map of the Prunedale area (courtesy historicaerials.com).




Part 2; a drive on Echo Valley Road

Eastbound Echo Valley Road begins from San Miguel Canyon Road (Monterey County Route G12) in Prunedale. 


Eastbound Echo Valley Road ascends into the Gabilan Range and crests an unnamed pass at 523 feet above sea level.  The summit of the unnamed pass faces towards Fremont Peak.  














Echo Valley Road ends at an interchange with US Route 101.  The roadway continues east as Crazy Horse Canyon Road east to the San Juan Grade.  




Comments

Popular posts from this blog

The case to move Interstate 73 in Southern Ohio onto US 33

Every decade or so, Ohio pushes to revisit the proposed Interstate 73 that would connect Michigan to Myrtle Beach, South Carolina.  It's been happening since Congress legislated the route in 1991.  Within Ohio, Interstate 73 generally follows the US 23 corridor from Portsmouth through Columbus to Toledo, and into Michigan. Since High Priority Corridor Five was created , Ohio has really done nothing to move forward with Interstate 73.  Sure, there have been feasibility studies here and there.  But actual dollars and construction just haven't occurred. The US 33 Nelsonville Bypass appears to have been built to Interstate standards. However, Ohio has been slowly upgrading US 33 to a full freeway through Southeastern Ohio.  Bypasses of Lancaster and Nelsonville opened in 2004 and 2013, respectively.  Other sections of two-lane road are being twinned, some to freeway or, at a minimum, to expressway standards.  Currently, a $274 million widening project in...

Rep. Sue Myrick's letter to Gov. Easley and Sect. Tippett published in Charlotte Observer

US. Representative Sue Myrick's (R-Charlotte) letter to North Carolina's Governor Mike Easley and NC Transportation Secretary Lyndo Tippett was published in the Friday, November 30th edition of the Charlotte Observer . Why are we delaying the completion of 1-485 in Charlotte again? I read in The Charlotte Observer how rising prices of materials are leading to the delay. Why didn't these same rising costs delay the loops in Fayetteville and Wilmington? Why are we building loops in Fayetteville and Wilmington before we complete the one in Charlotte? We were working on the one in Charlotte back when I was mayor. That was 20 years ago! ... Last I looked Charlotte was the largest city in the state. There seems to be no recognition of that fact in Raleigh. No recognition that we are at a standstill with traffic. No recognition that we have a traffic problem. Nor is there any recognition of the fact that the state DOT utterly botched up the southern leg of our yet to be completed ...

I-90 in Albany, New York and the Berkshire Spur

Today's Albany Times Union has a segment in their weekly Getting There? column that explains some of the history behind how I-90 is designated in the Albany, NY area as well as the Berkshire Spur. The long and short of the article was that I-90 was originally designated on the unsigned portion of the Berkshire Spur, but as free I-90 was built, the designation was moved onto the free portion of road. Additionally, there were talks in 1999 between state and federal officials about the possibility of moving I-90 back onto the unsigned portion of the Berkshire Spur, while extending I-88 onto what we know as free I-90. There would have also had been an I-88/I-90 multiplex between Rotterdam and Albany as a result. http://www.timesunion.com/AspStories/story.asp?storyID=916307