The few clues of the Northern Durham Parkway

Sometimes when you look through a box of maps for the first time in five years, you come across something you may have easily over looked.  Such was the case when I found a 2004 (so rather recent) map of Raleigh.  This map was made by the Dolph Map Company for WakeMed.  In the Northwestern corner of Wake County, there were two items to the map showing roads that are still not in existence 13 years later.

The road is the Northern Durham Parkway - this is a proposed 19 mile highway from US 501 north of Durham to the Raleigh-Durham International Airport.  The first proposals for this highway date back to 1967 when Eno Drive-Gorman Road was listed on the Durham Area Thoroughfare Plan. (1)  Other proposals called the highway the Northwest and Northeast Durham Loop. (2)  The route would serve as a northern and eastern bypass of Durham almost serving as a near loop.  The route was fought vigorously for three decades by the Eno River Association citing concerns for the the Eno River, nearby neighborhoods, and Eno River State Park.

In the late 1990s, Durham County Commissioners and the Durham City Council put together a compromise plan that eliminated the proposed loop west of US 501.  This plan would be called the Northern Durham Parkway. (2)  In December of 2002, it was agreed to go forward with the compromise plan - the Northern Durham Parkway. (3)  The route would now run from Interstate 540 at Exit 2 (Aviation Parkway) north to Interstate 85 and north to Old Oxford Road before turning to the Northwest to end at US 501.

The proposed route of the Northern Durham Parkway/NC 472 - Source: NCDOT
There is at least one example of planning maps that show the full route of the Northern Durham Parkway along the Eno River.  At one of NCDOT's transportation management centers, the route of the proposed Northern Durham Parkway is shown.


The Northern Durham Parkway would have served as a Northern Arc of Interstate 85 in Northern Durham County (Ben Thurkill)
In 2014, NCDOT completed a feasibility study that estimated the cost of completing the highway at between $254 and $361 million.  The price range is dependent on how much of the highway would be built as a freeway vs. how much built as a boulevard.  Section AA which is the Aviation Parkway extension to US 70/Glenwood Avenue would be built as a freeway in all scenarios.  One proposal has the highway being a freeway for sections AA, AB and AC - all the way to Interstate 85. NCDOT has reserved NC 472 for this route.  There is no current discussion proposing, that if the Northern Durham Parkway is built as a freeway from Interstate 540 to Interstate 85, it would be designated as a new Interstate.

Currently, two small sections of the highway are open.  Aviation Parkway from I-540 to Globe Road and a small section of highway called the Northern Durham Parkway off Sherron Road.



In addition, there is a small section of preserved right of way in the Copley Farm area just north of Mineral Springs Road (Section AC).  The preserved width of the right-of-way is 130' to carry a four lane divided highway. (4)

2017 Durham City/County Planning Department map that shows the reserved right of way for the Northern Durham Parkway near Mineral Springs Road (November 2017)
Additional clues to the Parkway's routing come into play with the 2004 Raleigh map find.  The map, as shown below, shows an extension of Aviation Boulevard (the Airport Blvd. notation is in error) beyond its current end at a 'T' intersection with Globe Road to just beyond T.W. Alexander Blvd.  It also shows that the intersection with Globe Road would become a partial-cloverleaf interchange.  This is confirmed in the 2014 NCDOT Feasibility Study.

Aviation (not Airport) Boulevard is shown going north beyond Globe Road towards T.W. Alexander.  This would be great except in 2004 Aviation ended and still ends today at Globe Road. (Dolph Map Co., 2004)
Further, this same map also includes an item that I am not sure is on NCDOT's books anymore.  It is a direct connector from Interstate 540 to the Northern Durham Parkway.  This connector would begin at Interstate 540 between Exits 4 and 7 (Glenwood/US 70 and Leesville Road).  In fact, if you are traveling on I-540 East and look closely you will see what is left of the grading of off and on ramps for the exit to the connector.  They are now overgrown with pine trees, but it's there.



You can somewhat see the grading for the ramps to the Northern Durham Connector Interchange.  What is more obvious is the reserved right of way to the north of Interstate 540.  It appears that the interchange was to be a trumpet interchange with the highway not continuing southwards towards Glenwood Avenue.  However, the 2004 map shows a different type of highway and interchange altogether.

Another highway that isn't there - the 540 connector to the Northern Durham Parkway (Dolph Map Co., 2004)
This shows a full fledged freeway to freeway cloverleaf interchange.  According to Brian LeBlanc, this was never to be a full freeway but a boulevard like connector.  Further supporting that this is just a map error is that a full freeway would be difficult to shoehorn south of I-540 through the number of commercial and light industrial businesses that occupy this corridor. These businesses can clearly be seen in the Google Satellite image earlier in the article.  I do not know if this connector is still a possibility; the 2014 NCDOT study does not include it.

As for the future of this highway, it is pretty much unknown.  It was listed as an unfunded project as late as June 2015.  Additionally, the current State Transportation Improvement Program does not have the project listed.  However, the region's growth will most likely cause the need for this highway to surface in the near future. When that may happen, it is unknown.  But thanks to a trip to the attic and a look through a box of old maps - a little more detail about this planned highway is now known

If you have any information about the Northern Durham Parkway, shoot me a note or leave a comment below.

Sources & Links:

Comments

Anonymous said…
I want to know what is the possibility of Northern Durham Pkwy expansion in near future if it comes into existence in terms of timelines like 2-5yrs or 5-10 yrs from now.
I am planning to buy a house which is near to this Expansion Route and concerned about the future effect on the house.
Anonymous said…
We’re building a home in NE Durham and after reviewing the re-zoning approval, you can see the city/county stills has an interest in maintaining right-of-way for the Northern Durham Pkwy project.

https://durhamnc.gov/AgendaCenter/ViewFile/Item/2029?fileID=7281
Adam said…
Thanks for the information and link! I added to the article the information about the preserved right of way! Thanks again! --Adam

Popular posts from this blog

The Dummy Lights of New York

  A relic of the early days of motoring, dummy lights were traffic lights  that  were  placed  in the middle of a street intersection. In those early days, traffic shuffled through busy intersections with the help of a police officer who stood on top of a pedestal. As technology improved and electric traffic signals became commonplace, they were also  originally  positioned on a platform at the center of the intersection. Those traffic signals became known as  " dummy lights "  and were common until  traffic lights were moved  onto wires and poles that crossed above the intersection.  In New York State, only a handful of these dummy lights exist. The dummy lights  are found  in the Hudson Valley towns of Beacon and Croton-on-Hudson, plus there is an ongoing tug of war in Canajoharie in the Mohawk Valley, where their dummy light has been knocked down and replaced a few times. The dummy light in Canajoharie is currently out of commission, but popular demand has caused the dummy

Colorado Road (Fresno County)

Colorado Road is a rural highway located in San Joaquin Valley of western Fresno County.  Colorado Road services the city of San Joaquin in addition the unincorporated communities of Helm and Tranquility.  Colorado Road was constructed between 1910 and 1912 as a frontage road of the Hanford & Summit Lake Railway.  The roadway begins at California State Route 145 near Helm and terminates to the west at James Road in Tranquility.   Part 1; the history of Colorado Road Colorado Road was constructed as frontage road connecting the sidings of the Hanford & Summit Lake Railway.  The Hanford & Summit Lake Railway spanned from South Pacific Railroad West Side Line at Ingle junction southeast to the Coalinga Branch at Armona.  The Hanford & Summit Lake Railway broke ground during August 1910 and was complete by April 1912. The Hanford & Summit Lake Railway established numerous new sidings.  From Ingle the sidings of the line were Tranquility, Graham, San Joaquin, Caldwell, H

Madera County Road 400 and the 1882-1886 Yosemite Stage Road

Madera County Road 400 is an approximately twenty-four-mile roadway following the course of the Fresno River in the Sierra Nevada Mountains.  Road 400 begins at California State Route 145 near Madera and terminates to the north at Road 415 near Coarsegold.  Traditionally Road 400 was known as "River Road" prior to Madera County dropping naming conventions on county highways.  Road 400 was part of the original Yosemite Stage Route by the Washburn Brothers which began in 1882.  The Yosemite Stage Route would be realigned to the west in 1886 along what is now Road 600 to a rail terminus in Raymond.  Parts of Road 400 were realigned in 1974 to make way for the Hensley Lake Reservoir.  Part 1; the history of Madera County Road 400 Road 400 is historically tied to the Wawona Road and Hotel.  The Wawona Hotel is located near the Mariposa Grove in the modern southern extent of Yosemite National Park.   The origins of the Wawona Road are tied to the Wawona Hotel but it does predate th