The few clues of the Northern Durham Parkway

Sometimes when you look through a box of maps for the first time in five years, you come across something you may have easily over looked.  Such was the case when I found a 2004 (so rather recent) map of Raleigh.  This map was made by the Dolph Map Company for WakeMed.  In the Northwestern corner of Wake County, there were two items to the map showing roads that are still not in existence 13 years later.

The road is the Northern Durham Parkway - this is a proposed 19 mile highway from US 501 north of Durham to the Raleigh-Durham International Airport.  The first proposals for this highway date back to 1967 when Eno Drive-Gorman Road was listed on the Durham Area Thoroughfare Plan. (1)  Other proposals called the highway the Northwest and Northeast Durham Loop. (2)  The route would serve as a northern and eastern bypass of Durham almost serving as a near loop.  The route was fought vigorously for three decades by the Eno River Association citing concerns for the the Eno River, nearby neighborhoods, and Eno River State Park.

In the late 1990s, Durham County Commissioners and the Durham City Council put together a compromise plan that eliminated the proposed loop west of US 501.  This plan would be called the Northern Durham Parkway. (2)  In December of 2002, it was agreed to go forward with the compromise plan - the Northern Durham Parkway. (3)  The route would now run from Interstate 540 at Exit 2 (Aviation Parkway) north to Interstate 85 and north to Old Oxford Road before turning to the Northwest to end at US 501.

The proposed route of the Northern Durham Parkway/NC 472 - Source: NCDOT
There is at least one example of planning maps that show the full route of the Northern Durham Parkway along the Eno River.  At one of NCDOT's transportation management centers, the route of the proposed Northern Durham Parkway is shown.


The Northern Durham Parkway would have served as a Northern Arc of Interstate 85 in Northern Durham County (Ben Thurkill)
In 2014, NCDOT completed a feasibility study that estimated the cost of completing the highway at between $254 and $361 million.  The price range is dependent on how much of the highway would be built as a freeway vs. how much built as a boulevard.  Section AA which is the Aviation Parkway extension to US 70/Glenwood Avenue would be built as a freeway in all scenarios.  One proposal has the highway being a freeway for sections AA, AB and AC - all the way to Interstate 85. NCDOT has reserved NC 472 for this route.  There is no current discussion proposing, that if the Northern Durham Parkway is built as a freeway from Interstate 540 to Interstate 85, it would be designated as a new Interstate.

Currently, two small sections of the highway are open.  Aviation Parkway from I-540 to Globe Road and a small section of highway called the Northern Durham Parkway off Sherron Road.



In addition, there is a small section of preserved right of way in the Copley Farm area just north of Mineral Springs Road (Section AC).  The preserved width of the right-of-way is 130' to carry a four lane divided highway. (4)

2017 Durham City/County Planning Department map that shows the reserved right of way for the Northern Durham Parkway near Mineral Springs Road (November 2017)
Additional clues to the Parkway's routing come into play with the 2004 Raleigh map find.  The map, as shown below, shows an extension of Aviation Boulevard (the Airport Blvd. notation is in error) beyond its current end at a 'T' intersection with Globe Road to just beyond T.W. Alexander Blvd.  It also shows that the intersection with Globe Road would become a partial-cloverleaf interchange.  This is confirmed in the 2014 NCDOT Feasibility Study.

Aviation (not Airport) Boulevard is shown going north beyond Globe Road towards T.W. Alexander.  This would be great except in 2004 Aviation ended and still ends today at Globe Road. (Dolph Map Co., 2004)
Further, this same map also includes an item that I am not sure is on NCDOT's books anymore.  It is a direct connector from Interstate 540 to the Northern Durham Parkway.  This connector would begin at Interstate 540 between Exits 4 and 7 (Glenwood/US 70 and Leesville Road).  In fact, if you are traveling on I-540 East and look closely you will see what is left of the grading of off and on ramps for the exit to the connector.  They are now overgrown with pine trees, but it's there.



You can somewhat see the grading for the ramps to the Northern Durham Connector Interchange.  What is more obvious is the reserved right of way to the north of Interstate 540.  It appears that the interchange was to be a trumpet interchange with the highway not continuing southwards towards Glenwood Avenue.  However, the 2004 map shows a different type of highway and interchange altogether.

Another highway that isn't there - the 540 connector to the Northern Durham Parkway (Dolph Map Co., 2004)
This shows a full fledged freeway to freeway cloverleaf interchange.  According to Brian LeBlanc, this was never to be a full freeway but a boulevard like connector.  Further supporting that this is just a map error is that a full freeway would be difficult to shoehorn south of I-540 through the number of commercial and light industrial businesses that occupy this corridor. These businesses can clearly be seen in the Google Satellite image earlier in the article.  I do not know if this connector is still a possibility; the 2014 NCDOT study does not include it.

As for the future of this highway, it is pretty much unknown.  It was listed as an unfunded project as late as June 2015.  Additionally, the current State Transportation Improvement Program does not have the project listed.  However, the region's growth will most likely cause the need for this highway to surface in the near future. When that may happen, it is unknown.  But thanks to a trip to the attic and a look through a box of old maps - a little more detail about this planned highway is now known

If you have any information about the Northern Durham Parkway, shoot me a note or leave a comment below.

Sources & Links:

Comments

Anonymous said…
I want to know what is the possibility of Northern Durham Pkwy expansion in near future if it comes into existence in terms of timelines like 2-5yrs or 5-10 yrs from now.
I am planning to buy a house which is near to this Expansion Route and concerned about the future effect on the house.
Anonymous said…
We’re building a home in NE Durham and after reviewing the re-zoning approval, you can see the city/county stills has an interest in maintaining right-of-way for the Northern Durham Pkwy project.

https://durhamnc.gov/AgendaCenter/ViewFile/Item/2029?fileID=7281
Adam said…
Thanks for the information and link! I added to the article the information about the preserved right of way! Thanks again! --Adam

Popular posts from this blog

Interstate 210 and California State Route 210 on the Foothill Freeway

This past December I was passing through the Los Angeles Area on a weekend I took a detour onto Interstate 210 eastbound on the Foothill Freeway to California State Route 2.  I-210 and CA 210 on the Foothill Freeway essentially serve as the closest thing to a Los Angeles bypass that the L.A. Metro Area has.


I-210/CA 210 on the Foothill Freeway is an approximately 85.31 mile highway which begins at I-5 in the northern outskirts of Los Angeles and travels east to I-10 in Redlands of San Bernardino County.  I-210 exists as the 44.9 mile segment of the Foothill Freeway between I-5 and CA 57 whereas CA 210 makes up the remaining 40.41 miles east to I-10.  I-210 originally utilized CA 57 from Glendora south on the Orange Freeway to I-10.  CA 57 south to I-10 is still FHWA recognized as part of I-210 which likely won't change until California seeks approval to add CA 210 to the Interstate System.



Part 1; the history of I-210 and CA 210

I-210 was approved as a chargeable Interstate during …

California State Route 1; the Cabrillo Highway through Big Sur and the Monterey Peninsula

This past January the winter weather was mild and conditions out in the Big Sur region were especially nice.  That being the case I decided on a weekend cruise northbound on California State Route 1 via the Cabrillo Highway from CA 46 near Harmony northward through Big Sur and the Monterey Peninsula to CA 156 in Castroville.


CA 1 through the Big Sur region isn't uncharted territory for Gribblenation.  Back in 2017 when the Mud Creek Slide, Paul's Slide and the Pfeiffer Canyon Bridge collapse occurred the topic of CA 1 in Big Sur was common on this blog site.  That being the case even though the topic of CA 1 through Big Sur has been covered extensively I never really examined much of the history of the highway in the Monterey Peninsula.  Aside from the fact that I wanted to feature CA 1 through the Monterey Peninusla I'm always game for a top level scenic highway.  To that end the photos that I took on this most recent trip to CA 1 far exceed what I was taking in 2017 and …

Locans, California ghost town site

This February I stopped at the site of the abandoned railroad siding known as Locans in eastern Fresno County.


Locans was a railroad sidings of the Southern Pacific Railroad spur line known as the Stockton & Tulare Railroad.  Locans was located on what is now Temperance Avenue just south of Bulter Avenue.  The Stockton & Tulare Railroad was completed in 1887 but it doesn't appear that Locans was one of the original sidings.  Locans doesn't appear on the 1889 George F. Cram Railroad map of California but nearby Butler does.


The first reference to Locans I can find is on the 1891 Thompson Atlas of Fresno County.  A large parcel of land next to the Stockton & Tulare Railroad can be seen east of of Butler owned by F. Locan.  Locan's land holdings surround a small siding known as Minneola which was about a half mile east of where the site of Locans would eventually be plotted.


Locan's property appears again on the Stockton & Tulare Railroad between Butler an…