Skip to main content

Tour of Phase III of the Triangle Expressway

On Thursday, December 20th, the third - and at this point final - phase of the Triangle Expressway opened to traffic.  The opening extended the NC 540 Toll Road and additional five miles from US 64 in Apex to the NC 55 Bypass in Holly Springs.

Prior to the expressway's opening, I was fortunate enough to tour the highway via the Expressway Trot 5k on December 2nd.  On Christmas Eve, I took a spin on the new road for the first time.

For the entire flickr set, head here.

Since I never was able to get a good photo of it prior (and because I live on the opposite end of Wake County from here), I finally am able to post a photo of the 'END' NC 540 shield for the brief free section of NC 540. (I-40 to NC 54).

IMG_6727

Prior to that shot, the VMS announced that the highway is now open to NC 55 in Holly Springs.  This message alternates with a message explaining that tolls on that section will begin on January 2, 2013.

IMG_6726

And here's the newly opened stretch of highway!

IMG_6731

Don't let the empty roadway fool you - there was a fair amount of cars traveling the toll road on this afternoon.

IMG_6733

Designers of the toll road have mentioned that they included some visual aesthetics to enhance the driving experience and to differentiate if from a normal limited access highway.  The fancier concrete sign bridges, brick overpass foundations, and also brick sound barriers are part of those aesthetics.

IMG_6735

In addition, trees and shrubs have recently been planted in the grass median throughout the length of the toll road.

Here's the TriEx South at South Salem St. (Old US 1).

IMG_6740

Overheads for US 1 North and South just after the South Salem Street interchange.

IMG_6741

Toll NC 540 ends at the NC 55 Holly Springs Bypass.  What's interesting about this interchange is that traffic wanting to get on Bypass NC 55 West is directed over the median and onto the northbound Toll 540 carriageway to crossover NC 55 before taking a loop ramp onto Bypass NC 55 West.

IMG_6748

Here's the overhead for entering the Triangle Expressway from Highway 55 East.

IMG_6751

I detoured onto US 1 briefly so I could check out the signage for the new toll road on US 1 and also I was informed that the flyover ramp from US 1 North to Toll NC 540 North was actually pretty neat.

Here's the overheads on US 1 North at the Triangle Expressway Interchange (Exit 93)

IMG_6760

I think this is the first time in North Carolina a split ramp on a flyover interchange is split into A/B ramps.  I know that the ramps from I-40E to I-540/NC 540 or I-95N to I-40 does not have an A/B split.

IMG_6762

Chris Allen had given me a heads up on the flyover ramp from US 1 North to Toll 540 North.  And it is actually pretty interesting.  The ramp goes under the Triangle Expressway before going over US 1 to reach NC 540 North.  The signature red brick of the Triangle Expressway actually makes an impression here.

IMG_6763

Finally, I exited onto S. Salem St to check out how the new toll road is signed on more of a surface street/rural road.  Interestingly, there's an additional sign outside of the 'TOLL' 'NC 540 diamond' and Arrow.

IMG_6772




Comments

James Mast said…
"I think this is the first time in North Carolina a split ramp on a flyover interchange is split into A/B ramps."

Not true. The Northern I-485 interchange with I-77 did this first on the Inner loop ramp.

http://goo.gl/maps/d5rOM
Chris Allen said…
Thank you for not saying "Chris Allen had mentioned the US 1 flyover ramp, but I actually thought it was totally lame and uninteresting and a complete waste of my time." :)
Brent White said…
James, I-77 Southbound at I-277 has had the split into A/B ramps at least since 1994.
James Mast said…
Brent, that's not a flyover like the I-485/I-77 interchange is.

Popular posts from this blog

Old River Lock & Control Structure (Lettsworth, LA)

  The Old River Control Structure (ORCS) and its connecting satellite facilities combine to form one of the most impressive flood control complexes in North America. Located along the west bank of the Mississippi River near the confluence with the Red River and Atchafalaya River nearby, this structure system was fundamentally made possible by the Flood Control Act of 1928 that was passed by the United States Congress in the aftermath of the Great Mississippi River Flood of 1927 however a second, less obvious motivation influenced the construction here. The Mississippi River’s channel has gradually elongated and meandered in the area over the centuries, creating new oxbows and sandbars that made navigation of the river challenging and time-consuming through the steamboat era of the 1800s. This treacherous area of the river known as “Turnbull’s Bend” was where the mouth of the Red River was located that the upriver end of the bend and the Atchafalaya River, then effectively an outflow

Memphis & Arkansas Bridge (Memphis, TN)

  Like the expansion of the railroads the previous century, the modernization of the country’s highway infrastructure in the early and mid 20th Century required the construction of new landmark bridges along the lower Mississippi River (and nation-wide for that matter) that would facilitate the expected growth in overall traffic demand in ensuing decades. While this new movement had been anticipated to some extent in the Memphis area with the design of the Harahan Bridge, neither it nor its neighbor the older Frisco Bridge were capable of accommodating the sharp rise in the popularity and demand of the automobile as a mode of cross-river transportation during the Great Depression. As was the case 30 years prior, the solution in the 1940s was to construct a new bridge in the same general location as its predecessors, only this time the bridge would be the first built exclusively for vehicle traffic. This bridge, the Memphis & Arkansas Bridge, was completed in 1949 and was the third

California State Route 203 the proposed Minaret Summit Highway

California State Route 203 is an approximately nine-mile State Highway located near Mammoth Lakes in the Sierra Nevada Mountains of Mono County.  California State Route 203 as presently configured begins at US Route 395, passes through Mammoth Lakes and terminates at the Madera County line at Minaret Summit.  What is now California State Route 203 was added to the State Highway System in 1933 as Legislative Route Number 112.  The original Mammoth Lakes State Highway ended at Lake Mary near the site of Old Mammoth and was renumbered to California State Route 203 in 1964.  The modern alignment of the highway to Minaret Summit was adopted during 1967.   The corridor of Minaret Summit and Mammoth Pass have been subject to numerous proposed Trans-Sierra Highways.  The first corridor was proposed over Mammoth Pass following a Southern Pacific Railroad survey in 1901.  In 1931 a corridor between the Minarets Wilderness and High Sierra Peaks Wilderness was reserved by the Forest Service for po