Campus Parkway is a 4.5-mile expressway corridor located in and around the city of Merced.  Campus Parkway spans from California State Route 99 to Yosemite Avenue and is part of the larger conceptual Campus Loop corridor.  The Campus Loop in full scale a series of planned roadways which if built will encircle Merced with an expressway grade beltway and permit easier access to the University of California-Merced campus.  Campus Parkway was completed in three phases in 2009, 2020 and 2022. 



Part 1; the history of Campus Parkway

The purpose of Campus Parkway is to enhance access to the campus of University of California-Merced (UC-Merced).  In full scale the corridor begins at California State Route 99 Exit 185 and extends 4.5 miles northward as a four-lane expressway to Yosemite Avenue.  The Campus Parkway corridor can be seen in contrast to the rest of the larger proposed Campus Loop which also includes Atwater-Merced Expressway. 


Currently access to the UC-Merced is mostly provided by way of substandard two-lane roadways.  The concept of a Merced campus as part of the University of California system was borne during the late 1980s and early 1990s due to increased Central Valley enrollment.  The University of California Board of Regents selected Merced for the planned new campus during May 1995.  Construction of the UC-Merced campus broke ground during October 2002 and would open for classes during September 2005.  

The Draft Environmental Impact Report for Campus Parkway was submitted via the provisions of the California Environmental Quality Act (CEQA) on April 22, 2005.  The corridor was planned as spanning from California State Route 99 north to Yosemite Parkway.  The project also included an overpass of overpass the Burlington North Santa Fe Railway and California State Route 140.  Access to California State Route 140 was proposed to be facilitated via a ramp structure.   


An initial affirmative Notice of Determination regarding Campus Parkway was issued by CEQA on December 26, 2006.  Further facets of the project were approved on September 26, 2007



Phase I of Campus Parkway included construction of the interchange with California State Route 99 and the roadway to Childs Avenue in 2009.  The Phase II corridor broke ground during early 2018 and was scheduled for completion during the first quarter of 2020.  Phase II would extend from Childs Avenue north to the ramp connecting to California State Route 140.  Phase II was funded by way of Senate Bill 1 Transportation Package.  Said bill allocated $100,000,000 in funding to Phase II and Phase III of the Campus Parkway project.  

Campus Parkway Phase II construction can be seen in a southward aerial photo facing towards California State Route 140 circa December 2018.  The connecting ramp to California State Route 140 can be seen on the left.  


Phase II construction can be seen in a January 2019 photo facing northward towards California State Route 140.  


The Phase II Campus Parkway completion dedication ceremony was held on February 3, 2020. 


Phase III of the Campus Parkway project broke ground shortly after completion of Phase II.  The Phase III corridor would extend the roadway from California State Route 140 north to the planned terminus at Yosemite Avenue.  Initial projections had Phase III opening to traffic during June 2023 but was ultimately completed ahead of schedule.  The Phase III dedication ceremony celebrating the completion of Campus Parkway was held on July 8, 2022 (photo Merced County Times). 




Part 2; a drive on Campus Parkway

Northbound Campus Parkway begins at California State Route 99 Exit 185 in the city of Merced.  The exit signage notes Campus Parkway to be the preferred access way to UC Merced.  




Campus Parkway turns northward and crosses over the Burlington North Santa Fe Railway and California State Route 140 at the Merced city limit.  State Highway access is permitted to the state highway via a connecting ramp signed as "Campus Parkway Access."










Campus Parkway passes through a roundabout at Olive Avenue.  The corridor continues northward to a terminus located at another roundabout found at Yosemite Avenue.  Beyond Yosemite Avenue local signage advises traffic to follow Lake Road to UC Merced.











Comments

Popular posts from this blog

Abandoned Fowler Avenue in Clovis, California

Originally Fowler Avenue in the city of Clovis had a brief discontinuation approaching Herndon Avenue.  Fowler Avenue traffic heading northbound was required to detour briefly onto westbound Herndon Avenue.  During 2001 this discontinuation was removed when Fowler Avenue was reconfigured to access the Sierra Freeway (California State Route 168) via an interchange.  This led to a segment of the original alignment of Fowler Avenue just south of Herndon Avenue to be abandoned.  Despite a shopping center opening over part of the original Fowler Avenue alignment in 2016 much of the abandoned roadway remains.   The history of the abandoned original alignment of Fowler Avenue in Clovis The original alignment of California State Route 168 departed downtown Clovis eastbound along Tollhouse Road.  This original alignment did not interact with Fowler Avenue at the Herndon Avenue intersection.  Fowler Avenue north of Tollhouse Road ran north to Herndon Avenue...

What's In a Name?: When the Roads Really Do Tell a Story

  Our tagline on the Gribblenation blog is "because every road tells a story". Some roads tell different stories than others. Along our travels, we may see historic markers that tell us a little story about the roads we travel or the places we pass by. Some historic markers are more general, as to telling us who lived where or what old trail traversed between two towns. During my travels across New York State and other states or provinces, I pass by many historic markers, some with interesting or amusing references to roads. I wanted to highlight a few of the markers I've seen along my travels around the Empire State and help tell their stories. Those stories may be as specific as explaining the tales of a tree that was used to help measure a distance of eight miles from Bath to Avoca in Steuben County, as referenced on the Eight Mile Tree historical marker above. They may also help point the way along historical roads first used centuries ago, or may help tell a local l...

Hot Springs Drive (Tulare County Mountain Road 56)

Hot Springs Drive is an approximately twenty-mile rural highway in the Sierra Nevada foothills of Tulare County.  The Hot Springs Drive corridor begins at Old Stage Road at Fountain Springs and extends eastward to Parker Pass Road near California Hot Springs.  Hot Springs Drive is carried by Tulare County Mountain Road 56 and acts as an extension of Avenue 56 (Tulare County Route J22).   What is now California Hot Springs originated as the Deer Creek Hot Springs Resort in 1882.  The resort on Deer Creek was originally served by a Control Road which required traffic alternate at different times of the day.  The modern California Hot Springs resort would incorporate in 1905 following an ownership change.  The Control Road corridor was replaced by Hot Springs Drive around 1915 which intended to serve increasing amount of automotive traffic to California Hot Springs.  Much of the resort would later burn in 1968 but was rebuilt in the 1980s. ...