Skip to main content

Madera County Road 426


Road 426 is an approximately seven-mile-long rural highway corridor which begins at Road 222 on the shore of Bass Lake and terminates at California State Route 41 in Oakhurst. The corridor was developed during the 1850s during the emergence of Fresno Flats (now Oakhurst) and lumber milling at Crane Valley (now Bass Lake). The section west of Road 223 and Teaford Saddle was part of the Millerton-Fresno Flats Road whereas the segment east was part of the Crane Valley Road.




Part 1; the history of Madera County Road 426

Madera County Road 426 was a segment of what was the Millerton-Fresno Flats Road.  Fresno Flats (now Oakhurst) was settled in 1858 following the Mariposa War along the Fresno River.  The community was originally centered around ranching and servicing the nearby mill operations in Crane Valley.  The stage road eventually bypassed Millerton when the Fresno County seat was moved to Fresno in 1874.

The Fresno-Fresno Flats Road can be seen on the 1882 Bancroft's Map of California. The road can be seen crossing Teaford Saddle north of Fine Gold and entering Fresno Flat. An eastern fork in the road is shown serving travel to the mills of Crane Valley and the North Fork San Joaquin River (now North Fork Willow Creek).


As the automotive era in the twentieth century began the segments of the Fresno-Fresno Flats Road were assigned names.  The entire corridor was named as a component of "Crane Valley Road" which also included modern Road 222 and Road 221 from the Forks Resort south to Road 200. 

Crane Valley Road can be seen in detail on the 1912 United States Geological Survey Map of Mariposa.


During the mid-twentieth century the road names of Madera County were dropped in favor of a numbering system.  Crane Valley Road was subsequently reassigned as Roads 426, 222 and 221.  Road 426 appears on the 1953 United States Geological Survey Map of Bass Lake.




Part 2; a drive on Madera County Road 426

Northbound Madera County Road 223 ends at a fork in Madera County Road 426.  Signage indicates Bass Lake is one mile to the east whereas Oakhurst is six miles to the west. 


Eastbound Road 426 descends from Road 223 and Teaford Saddle to Road 222 on the shore of Bass Lake near the Forks Resort.  



Westbound Road 426 descends gradually from Road 223 and enters Oakhurst. 

































Road 426 passes through Oakhurst and crosses the Fresno River.  West of the river the highway terminates at California State Route 41.  




Comments

Popular posts from this blog

The case to move Interstate 73 in Southern Ohio onto US 33

Every decade or so, Ohio pushes to revisit the proposed Interstate 73 that would connect Michigan to Myrtle Beach, South Carolina.  It's been happening since Congress legislated the route in 1991.  Within Ohio, Interstate 73 generally follows the US 23 corridor from Portsmouth through Columbus to Toledo, and into Michigan. Since High Priority Corridor Five was created , Ohio has really done nothing to move forward with Interstate 73.  Sure, there have been feasibility studies here and there.  But actual dollars and construction just haven't occurred. The US 33 Nelsonville Bypass appears to have been built to Interstate standards. However, Ohio has been slowly upgrading US 33 to a full freeway through Southeastern Ohio.  Bypasses of Lancaster and Nelsonville opened in 2004 and 2013, respectively.  Other sections of two-lane road are being twinned, some to freeway or, at a minimum, to expressway standards.  Currently, a $274 million widening project in...

Rep. Sue Myrick's letter to Gov. Easley and Sect. Tippett published in Charlotte Observer

US. Representative Sue Myrick's (R-Charlotte) letter to North Carolina's Governor Mike Easley and NC Transportation Secretary Lyndo Tippett was published in the Friday, November 30th edition of the Charlotte Observer . Why are we delaying the completion of 1-485 in Charlotte again? I read in The Charlotte Observer how rising prices of materials are leading to the delay. Why didn't these same rising costs delay the loops in Fayetteville and Wilmington? Why are we building loops in Fayetteville and Wilmington before we complete the one in Charlotte? We were working on the one in Charlotte back when I was mayor. That was 20 years ago! ... Last I looked Charlotte was the largest city in the state. There seems to be no recognition of that fact in Raleigh. No recognition that we are at a standstill with traffic. No recognition that we have a traffic problem. Nor is there any recognition of the fact that the state DOT utterly botched up the southern leg of our yet to be completed ...

Local Sign Find - The last remnant of Business Interstate 95 between Kenly and Rocky Mount , NC

As you head north on Interstate 95 at Exit 107 for Kenly and US 301, you'll notice something odd about the overhead sign for the exit.  Peeling off the sign for all that can see is the word 'NORTH' off-center from the US 301.  This old sign (probably close to original from when this section of I-95 opened - more on that in a little bit) gives a hint to a short-lived Business Interstate Route that ran from here to Rocky Mount. The last hint of the Kenly-Wilson-Rocky Mount Business I-95 (Shaun White - August 2020) Interstate 95 in North Carolina has a unique history.  But one of the overlooked and forgotten pieces of Interstate 95 in North Carolina is the 38 mile section between Kenly and Rocky Mount.  When opened to traffic in late 1978, it was the next to last piece of Interstate 95 in North Carolina to open replacing a four lane US 301 from Battleboro through Rocky Mount and Wilson to eventually tying back into the Interstate in Kenly. Though it was not delayed in l...