Skip to main content

A Drive Along (Part of) I-395

Got a chance this past Saturday to drive along Connecticut's I-395 from where the route joins the original Connecticut Turnpike, that is secretly designated (not signed) as CT 695 to where CT 2A leaves the interstate south of Norwich. I-395 is the first freeway to be given milepost-based exit numbers by the State of Connecticut (along with CT 2A and CT 695). The original numbers run from 77 to 100 and are those of the Connecticut Turnpike (up to 90) which start at the New York border The new numbers will run from 2 to 53. The state's plan is to convert the rest of its freeways over the next 10-20 years as part of exit sign replacement contracts. The I-395 project was split in two with the first section to be started that between I-95 and old Exit 88. Many photos have already been taken of signs along this section, check out Jay Hogan's I-395 Flickr Page.

Here are some of the photos taken of new exit signs and numbers north of Exit 88.

OLD EXIT 90 / NEW EXIT 35
I only got to take photos of this exit northbound. The new signs are ground-mounted, replacing overhead signs. The overheads are still in place with I-395 pull-through signage:

Here's the next overhead assembly with the new exit sign in the distance:
Here' a closeup view of the 1/2 Mile Sign:
The same situation approaching the exit ramp itself, old overhead with missing Exit sign and new sign ground-mounted beyond:
Hopefully, they'll cut back some brush and move the sign in front. They've also replace the exit signs after the off-ramp on SR 695, photos below.

OLD EXIT 89 / NEW EXIT 32
The first new signs I saw heading southbound were for the CT 14 exit. These photos show the typical new signage set-up for each interchange. Starting with the 1-Mile Advance Sign:
In addition to the new number on the exit tab, there is an additional tab above with the old exit number which will stay up for 2 years to acclimate motorists to the new numbering system. The 1/2 mile advance sign does not have the Old Exit tab:
In this case, the sign apparently is not finished with the bottom panel still needing to be installed. Between the 1-Mile Advance and the Exit signs at the interchange's off-ramp there are typically several auxiliary and blue informational signs with the new number. Here's an auxiliary for CT 14:
A blue services sign can be seen in the distance. The final signs are at the off-ramp itself:
Connecticut exit signs seem to feature larger exit tabs than most states. At the gore point the signs show both the new and old number, as with the 1-Mile sign the Old Exit tab will stay up for two years:
Similar signage for CT 14 is also installed northbound. Here's the progression as seen above, starting at the 1/2 mile advance sign:
Here's signage at the interchange itself:
With the new number/old number gore sign in the background.

OTHER SIGNS
With the new milepost numbers has come new mileposts which are posted every 2/10 of a mile with an I-395 shield and direction provided at the mile. Here's two examples, southbound:
And northbound:
New route shields, or reassurance markers have been placed following each exit, again southbound:
Here' with a route marker for CT 2A East where it runs concurrently with I-395 south of Norwich. And northbound:

SIGNS ALONG SR 695
In addition to I-395, CTDOT has started placing new signs on the section of the original Connecticut Turnpike that runs between I-395 and US 6, with Secret Route (SR) number 695. The signs have only been placed heading east toward US 6 as of now. Here's the 1/2 mile advance sign for Ross Road with new Exit 1 tab (the previous sign had no exit number):
Again, some pruning could be done to make the sign more visible. Here's the signage at the off-ramp:

SOME ADDITIONAL PHOTOS
Here's some additional photos taken mostly southbound of signs from the first phase of the project that have not appeared elsewhere online.
NEW EXIT 29 / OLD EXIT 88
The one mile advance sign southbound:
And the 1/2 mile advance sign:
NEW EXIT 28 / OLD EXIT 87
The one mile advance sign southbound:
NEW EXIT 24 / OLD EXIT 86
The 1/2 mile advance sign southbound:
In this case, the new sign hasn't been installed but the new Exit and Former Exit tabs have been placed on the existing sign.
NEW EXIT 14 OLD EXIT 82
The 1/2 mile advance sign southbound
And here's the signage at the exit itself, an overhead mixture of the old and new:
New numbers, old signs.
NEW EXIT 13 OLD EXIT 81
Here's the new 1/2 mile advance exit sign southbound:
 NEW EXIT 11 / OLD EXIT 80
Here's a shot northbound both of reassurance markers and new exit sign for Exit 13:
And finally, an exit sign that seems to be missing its exit tab:


Comments

roadman said…
As always, excellent photos Bob. And many of them prove one problem with going from overhead to ground-mounted panels - the need to do periodic clearing and grubbing of the roadside brush.

Popular posts from this blog

Paper Highways: The Unbuilt New Orleans Bypass (Proposed I-410)

  There are many examples around the United States of proposed freeway corridors in urban areas that never saw the light of day for one reason or another. They all fall somewhere in between the little-known and the infamous and from the mundane to the spectacular. One of the more obscure and interesting examples of such a project is the short-lived idea to construct a southern beltway for the New Orleans metropolitan area in the 1960s and 70s. Greater New Orleans and its surrounding area grew rapidly in the years after World War II, as suburban sprawl encroached on the historically rural downriver parishes around the city. In response to the development of the region’s Westbank and the emergence of communities in St. Charles and St. John the Baptist Parishes as viable suburban communities during this period, regional planners began to consider concepts for new infrastructure projects to serve this growing population.  The idea for a circular freeway around the southern perimeter of t

Hernando de Soto Bridge (Memphis, TN)

The newest of the bridges that span the lower Mississippi River at Memphis, the Hernando de Soto Bridge was completed in 1973 and carries Interstate 40 between downtown Memphis and West Memphis, AR. The bridge’s signature M-shaped superstructure makes it an instantly recognizable landmark in the city and one of the most visually unique bridges on the Mississippi River. As early as 1953, Memphis city planners recommended the construction of a second highway bridge across the Mississippi River to connect the city with West Memphis, AR. The Memphis & Arkansas Bridge had been completed only four years earlier a couple miles downriver from downtown, however it was expected that long-term growth in the metro area would warrant the construction of an additional bridge, the fourth crossing of the Mississippi River to be built at Memphis, in the not-too-distant future. Unlike the previous three Mississippi River bridges to be built the city, the location chosen for this bridge was about two

Memphis & Arkansas Bridge (Memphis, TN)

  Like the expansion of the railroads the previous century, the modernization of the country’s highway infrastructure in the early and mid 20th Century required the construction of new landmark bridges along the lower Mississippi River (and nation-wide for that matter) that would facilitate the expected growth in overall traffic demand in ensuing decades. While this new movement had been anticipated to some extent in the Memphis area with the design of the Harahan Bridge, neither it nor its neighbor the older Frisco Bridge were capable of accommodating the sharp rise in the popularity and demand of the automobile as a mode of cross-river transportation during the Great Depression. As was the case 30 years prior, the solution in the 1940s was to construct a new bridge in the same general location as its predecessors, only this time the bridge would be the first built exclusively for vehicle traffic. This bridge, the Memphis & Arkansas Bridge, was completed in 1949 and was the third