This past month I drove the entirety of Redinger Lake Road located in Madera County along the horseshoe bend region of the San Joaquin River. Redinger Lake Road carries the designation of "Road 235" and is a 8.6 mile road which begins at Powerhouse Road (Road 222) at Kerckhoff Lake in Sierra National Forest and ends to the east at Italian Bar Road (Road 225) along Redinger Lake. Redinger Lake Road was completed by 1950 and was used as a haul road during the construction of Redinger Dam. Redinger Dam was completed by 1951 and is part of the Big Creek Hydroelectric Project. Internally Redinger Dam is also known as Big Creek Dam #7. Redinger Dam is a 250 foot high concrete gravity dam which impounds the San Joaquin River. Redinger Dam has a maximum capacity of 35,000 acre feet of water. My approach to Redinger Lake Road was from Powerhouse Road northbound on the shore of Kerckhoff Lake. From Powerhouse Road I turned east onto Redinger Lake Road. ...
Because every road has a story.