Skip to main content

Route and Directional Changes Coming to Triangle Area Roads

For Raleigh and Durham area motorists, construction and or new highways is the norm.  It is a growing region, and with that comes traffic, an endless sea of orange barrels, and testing of patience.  And the first half of 2022 will be no different - specifically around Research Triangle Park.

There are a few new numbers, and a directional change that I can see will cause some confusion to unfamiliar motorists.


First, the number changes.  Interstate 885 is coming - yes, sometime soon we hope - and as a result, the southern half of the Durham Freeway, currently NC 147, will have a new number.  Once the East End Connector opens, that's a big if, considering that CSX and NCDOT cannot get their act together, Interstate 885 will be born.  The new Interstate starts where US 70 meets Interstate 85 in Durham, continues along East US 70, cuts across the east side of Durham on the new connector, and then south on the Durham Freeway to Interstate 40.

As a result of the new Interstate 885, NCDOT has decided to renumber Toll NC 147, or the Triangle Parkway, to Toll NC 885.  Interstate 885 will transition to TOLL NC 885 at Interstate 40 and continue southeast to TOLL NC 540 near Morrisville.

There is no change to the number of NC 540 and its offshoots (TOLL and Interstate) - they will remain the same.  However, there is a directional change that could confuse motorists.  Currently, where I-540 changes to NC 540 at Interstate 40 in Western Wake County, NC 540 continues with the West direction until TOLL NC 147, where it changes to a North/South header.

These signs at the I-40 East (Exit 283) for I/NC 540 are going to change. You'll either go East or East. (Doug Kerr - 2014).

That's all going to change this Spring or by the Fall of 2023*.  At Interstate 40, where Interstate 540 West turns into NC 540, the direction will also change.  You will now be continuing on NC 540 EAST.  From this approach, this is no big deal - you are on 540 - it's now a black and white diamond vs. a red-white-blue Interstate - the West to East change will probably go unnoticed.

The planned new signaged for Interstate and NC 540 East (Exit 283) on Interstate 540. (NCDOT)

The new signage that will replace the 2014 photo from Doug Kerr.  Less shields - but the same direction.  Could it cause confusion for out-of-towners? (NCDOT)

However, if you want to get on 540 (either version) from Interstate 40, it'll be a little confusing as your choices will only be EAST or EAST.  And if you are unfamiliar with the difference between I-540 and NC 540 - well, you're chances of making a wrong turn are going to go up.

Along Interstate 40 West, NCDOT will only re-sticker the West NC 540 with an East Banner. (NCDOT)

Is it a big deal?  Probably not.  Am I writing this just for content?  Maybe.  But as the sign plans show - you're going to have 540 East and 540 East to choose from at the split on the flyover ramp from I-40 East.  If you are on I-40 West - you don't have the split ramp, but you'll have to decide which exit to use.

Why is this being done?  Maybe to prepare for NC 540's extension to I-40 in Garner? 540 will be more of an East/West Route at that time.  Of course, when 540 eventually gets around the corner and up to Knightdale, we'll have a West/West fun. 

The changes aren't anything new - as this is the same part of the state that had different routes on and off the Beltline during the 1980s/90s, Inner/Outer Beltline for a time, I-540 was North/South for a bit and then went entirely East/West, NC 540 was signed as Interstate 540 and changed right before it opened, and let's not forget I-495 to I-87 along US 64 in Eastern Wake County.  Speaking of the Inner/Outer concept - why not go back to it for 540.  Yes, it didn't work for the Beltline, but it does work with I-485 in Charlotte.

*: The contract should be finished by September 2023, so hey, maybe it'll change again.  

Sources & Links:




Comments

Popular posts from this blog

Grand Loop Road of Yellowstone National Park

  Grand Loop Road is a 140 mile loop highway which traverses the interior of Yellowstone National Park.  Grand Loop Road connects all of the major attractions and geological features of Yellowstone National Park along with the entrance roads.  Grand Loop Road is a seasonal highway and despite some conjecture never has been part of the US Route System.   Part 1; the history of Grand Loop Road The majority of history pertaining to Grand Loop Road was taken from the below National Park Service article: Historic Roads - Yellowstone National Park (U.S. National Park Service) (nps.gov) Yellowstone was declared the first National Park of the United States on March 1st, 1872.  The first real highway to access Yellowstone National Park came in 1873 when a tolled facility was constructed from Bozeman, Montana via Yankee Jim Canyon to Mammoth Hot Springs.  Numerous attempts were made to fund construction of roadway infrastructure during the early years of Yellows...

The last 1956-63 era California Sign State Route Spade?

Along southbound California State Route 170 (the Hollywood Freeway Extension) approaching the Hollywood Freeway/Ventura Freeway interchange a white California State Route 134 Sign State Route Spade can be observed on guide sign.  These white spades were specifically used during the 1956-63 era and have become increasingly rare.  This blog is intended to serve as a brief history of the Sign State Route Spade.  We also ask you as the reader, is this last 1956-63 era Sign State Route Spade or do you know of others?  Part 1; the history of the California Sign State Route Spade Prior to the Sign State Route System, the US Route System and the Auto Trails were the only highways in California signed with reassurance markers.  The creation of the US Route System by the American Association of State Highway Officials during November 1926 brought a system of standardized reassurance shields to major highways in California.  Early efforts to create a Sign State Route ...

California State Route 70; the Feather River Highway

From 2017 through to early 2019 I drove the majority of the California State Route 70; the Feather River Highway from CA 89 southwest to CA 99. CA 70 is an approximately 178.5 mile state highway which starts at US 395 near the Nevada State Line and travels west through the Feather River Canyon to CA 99.  CA 70 is often referred to as the Feather River Highway" given it's close association with the river.  Historically CA 70 was previously signed as US 40A and CA 24.  The Legislative Routes prior to the 1964 California Highway Renumbering that made up the current route of CA 70 are as follows: -  Legislative Route Number 21 from US 395 westward to Oroville. -  LRN 87 from Oroville south to Marysville. -  LRN 232 from Marysville to the current junction with CA 99.  CA 70 was even dual signed with CA 99 into Sacramento on what was LRN 232 for a time. The change from US 40A/LRN 21/LRN 87/LRN 232 can be seen by comparing the 1963 State Highway Ma...