Skip to main content

Righting a Freeway Wrong: The Hunts Point Improvement Project

 

When I last spoke about construction projects in the City of New York, we discussed the new connector ramp between the RFK Bridge and the Harlem River Drive, a much-needed piece of the transportation puzzle that filled a glaring “missing link” in the whole network. A short distance away from there, in the Hunts Point section of the south Bronx, a much larger project of similar intent is now underway that promises to improve traffic circulation in a part of the City that has been lacking logical connectivity for decades.

The Hunts Point Cooperative Market is a massive whole sale food market complex built on 60 acres of prime real estate along the Bronx River. The campus operates 24/7 and is the largest food distribution center of its kind in the world, earning combined annual revenues of over $2 billion. Yet there’s always been one major problem with it all – the Market has always lacked direct & logical connections to the area’s expressway network, which has constantly resulted in heavy commercial traffic overburdening the local street grid in the neighborhood. The long-proposed and currently-underway “Hunts Point Interstate Access Improvement Project” is aimed at providing these missing connections to the nearby Bruckner Expressway (Interstate 278) and Sheridan Boulevard (NY Route 895), enabling the surface street grid of Hunts Point to function properly once again.


The above photos detail a trip along the westbound  side of the Bruckner Expressway (I-278) through the Hunts Point Project work area. Temporary unconventional traffic shifting and realignments will be necessary in the coming years as construction proceeds in the vicinity.

The scope of this project includes the reconstruction of the Bruckner Expressway/Boulevard mainline between Bronx River Avenue and Hunts Point Avenue, including the replacement of bridge decks and the widening of mainline roadways through the area. New flyover ramps are to be constructed that will directly connect the eastbound Bruckner/southbound Sheridan corridors with the truck entrances to the Hunts Point Market, and connect the Market with the northbound Sheridan, taking that substantial commercial traffic off of local streets and streamlining access to Market Terminals. The project’s timeline and staging are complicated by a variety of factors. Amtrak & CSX Railroads own & operate busy trackage, both along the Northeast Corridor (which runs directly through the project area), and on a separate active siding that connects the NEC mainline with the Terminal Markets. The vital Bruckner & Sheridan transportation arteries must be kept open through the project’s duration, meaning that special considerations related to work staging and traffic management are to be utilized.

New support structures, bridges, and retaining walls are part of the scope of improvements necessary along the Sheridan Boulevard arm of the project; many of these improvements are well underway.

This $460 million design-build contract is being executed by a joint venture contracting team led by Skanska and ECCO III Enterprises and substantial completion of the project is anticipated by the end of 2022. This is the first of three planned contracts aimed at renewing the entire Bruckner Expressway corridor between the RFK Bridge and Bronx River Parkway; the following two contracts will further address travel deficiencies in the area by adding additional ramps along the Bruckner corridor, and rehabbing the existing elevated viaduct through Hunts Point. All in all, about a decades-worth of work lies ahead for a long-neglected area of the City that will finally be getting a semblance of the modern transportation infrastructure it deserves.


Work is underway on the full rehab of the Bruckner Expressway overpass above Bronx River Avenue. The staged work involved installing a new deck, new bridge bearings, and performing significant structural repairs to key substructure components.

Comments

Unknown said…
The HuntsPoint construction work is a complete and utter disaster for the people of the neighborhood and the Hunts Point Market.
I have worked in The Point for over 30 years. I have never experienced such congestion and lawlessness on the streets. The people responsible for this project including the political people should move there offices down here and experience the disaster they have created.
Unknown said…
It’s unbelievable that a 15 min drive in the morning turns to 45 min to a 1hr drive. Going home …well I leave work at 5:30 and I get home between 6:30or 7:00. This is an absolute disgrace and these politicians should be sitting in these dangerous congested traffic. Frustrating people trying to get home. Please do something… at least come and see what’s going on. For startes have the lights alternate as you go down hunts point to the bruckner. This is crazy with all the technology, politicians we can’t figure something out? Please do something you owe it to the community, you owe it to the workers you owe it to the Hunts Point Market. Very frustrated driver!

Popular posts from this blog

Grand Loop Road of Yellowstone National Park

  Grand Loop Road is a 140 mile loop highway which traverses the interior of Yellowstone National Park.  Grand Loop Road connects all of the major attractions and geological features of Yellowstone National Park along with the entrance roads.  Grand Loop Road is a seasonal highway and despite some conjecture never has been part of the US Route System.   Part 1; the history of Grand Loop Road The majority of history pertaining to Grand Loop Road was taken from the below National Park Service article: Historic Roads - Yellowstone National Park (U.S. National Park Service) (nps.gov) Yellowstone was declared the first National Park of the United States on March 1st, 1872.  The first real highway to access Yellowstone National Park came in 1873 when a tolled facility was constructed from Bozeman, Montana via Yankee Jim Canyon to Mammoth Hot Springs.  Numerous attempts were made to fund construction of roadway infrastructure during the early years of Yellows...

The last 1956-63 era California Sign State Route Spade?

Along southbound California State Route 170 (the Hollywood Freeway Extension) approaching the Hollywood Freeway/Ventura Freeway interchange a white California State Route 134 Sign State Route Spade can be observed on guide sign.  These white spades were specifically used during the 1956-63 era and have become increasingly rare.  This blog is intended to serve as a brief history of the Sign State Route Spade.  We also ask you as the reader, is this last 1956-63 era Sign State Route Spade or do you know of others?  Part 1; the history of the California Sign State Route Spade Prior to the Sign State Route System, the US Route System and the Auto Trails were the only highways in California signed with reassurance markers.  The creation of the US Route System by the American Association of State Highway Officials during November 1926 brought a system of standardized reassurance shields to major highways in California.  Early efforts to create a Sign State Route ...

California State Route 70; the Feather River Highway

From 2017 through to early 2019 I drove the majority of the California State Route 70; the Feather River Highway from CA 89 southwest to CA 99. CA 70 is an approximately 178.5 mile state highway which starts at US 395 near the Nevada State Line and travels west through the Feather River Canyon to CA 99.  CA 70 is often referred to as the Feather River Highway" given it's close association with the river.  Historically CA 70 was previously signed as US 40A and CA 24.  The Legislative Routes prior to the 1964 California Highway Renumbering that made up the current route of CA 70 are as follows: -  Legislative Route Number 21 from US 395 westward to Oroville. -  LRN 87 from Oroville south to Marysville. -  LRN 232 from Marysville to the current junction with CA 99.  CA 70 was even dual signed with CA 99 into Sacramento on what was LRN 232 for a time. The change from US 40A/LRN 21/LRN 87/LRN 232 can be seen by comparing the 1963 State Highway Ma...