Skip to main content

NCTA releases Mid-Currituck Bridge Draft Environmental Impact Statement

On March 31st, the North Carolina Turnpike Authority released their Draft Environmental Impact Statement (DEIS) and recommended alternative for the Mid-Currituck Bridge

Of the three alternatives that saw the most scrutinization, the NCTA has recommended Option MCB4 to be built.  However, the Turnpike Authority has yet to decide on alignment 'C1' or 'C2' at the eastern end of the bridge.  The eastern terminus of the bridge will be at NC 12 in or near Corolla.  Option C1 lands at the southern end of Corolla Bay and about two miles north of the Albacore Street retail area.  Option C2 avoids Corolla Bay and meets NC 12 about a half mile south of Albacore Street.

In addition, the NCTA has yet to decide on the location of the toll booths on the mainland (US 158) side of the bridge.  The decision on the location of the toll booths has become a double edged sword as potential impacts to Maple Swamp and the Currituck Sound community of Aydlett has cause the most controversy.   NCTA has not released a timeline on when they will make a decision on options 'C1' and 'C2' or the mainland toll booths location.

Also, MCB4 will include the construction of a third 'contraflow' hurricane evacuation lane on US 158 from the bridge northwards to NC 168.  There would also be some widening of NC 12 in Corolla where the bridge ends, but the length of the widening will be determined by the ultimate eastern terminus of the bridge.  Finally, a recommendation to convert the NC 12/US 158 intersection in Southern Shores to an interchange (either a SPUI or compressed diamond) was made.  However, funding at this time is not available for that project.

The Turnpike Authority will be hosting public hearings on the DEIS in May.  The schedule for the meetings is as follows:
  • May 18 - Ramada Plaza, Nags Head
  • May 19 - Outer Banks Center for Wildlife Education, Corolla 
  • May 20 - Currituck Cooperative Extension Center, Barco
Each hearing will begin with an open house starting at 3:30 pm, immediately followed by the public hearing at 7:00 pm.

The new target completion date for the bridge is now late 2014.

Story Links:
Mid-Currituck Bridge Draft Environmental Impact Statement ---North Carolina Turnpike Authority
Statement recommends Currituck bridge option ---Outer Banks Voice
Turnpike Authority Schedules Public Meetings for Bridge Project ---Carova Corner

Comments

Da-ud said…
Wouldn't a rotary at the US 158/NC 12 intersection be less environmentally intrusive than an interchange?

Popular posts from this blog

West Canyon Road (Snow Canyon State Park)

West Canyon Road is an approximately four-mile dirt service road located in Snow Canyon State Park.  West Canyon Road follows Snow Canyon from the Whiptail Trail to the northern State Park boundary and intersects numerous trailheads.   West Canyon Road was the original main road through Snow Canyon after it was designated as a Utah State Park in 1957 and opened to the public in 1962. Part 1; the history of West Canyon Road Snow Canyon is located in the Red Mountains north of the city of Ivins in Washington County, Utah.  Snow Canyon is one of many sandstone canyons located in the Red Mountains.  Part of the extinct Santa Clara Volcano punctured the Red Mountains via lava tubes. From approximately the year 200 to 1,250 the area around Snow Canyon was inhabited by the Ancestral Puebloans.  Mormon pioneers established Santa Clara south of Snow Canyon in 1854.  Local legend has it that the settlers discovered Snow Canyon in the 1850s while searching for m...

Indian Gulch Extension and the Indian Gulch ghost town site

Indian Gulch Extension is an approximately 6-mile-long rural highway corridor in the Sierra Nevada foothills of western Mariposa County.  Indian Gulch Extension begins at Indian Gulch Road near the namesake ghost town of Indian Gulch.  From the ghost town site Indian Gulch Extension extends southwesterly to the Merced County line where it becomes Waltz Road.   The former Gold Rush era community of Indian Gulch which was settled near Santa Cruz Mountain in 1849 and had standing structures until the early 1970s.  What is now Indian Gulch Extension was approved for construction by the Mariposa County Commissioners in 1862.  The purpose of the corridor was to provide Indian Gulch with a direct connection westward with the greater Stockton-Los Angeles Road.  The Stockton-Los Angeles Road would go onto define much of the Mariposa County and Merced County line.  Part 1; the history of Indian Gulch and Indian Gulch Extension Indian Gulch Road is named aft...

The reemergence of US Route 99 at the Ventura Freeway/Golden State Freeway interchange

During April 2023 a portion of the sign gantry on the eastbound Ventura Freeway (California State Route 134) approaching the Golden State Freeway (Interstate 5) fell.  The fallen portion of the sign gantry revealed a once covered US Route 99 shield.  The uncovered US Route 99 sign (blog cover courtesy Ian Ligget) is a 1956-63 era freeway specification US Route shield.  This blog will explore in brief how the Golden State Freeway was developed as US Route 99 and US Route 6 before becoming solely Interstate 5.   This blog is part of the larger Gribblenation US Route 99 Page.  For more information pertaining to the other various segments of US Route 99 and it's three-digit child routes check out the link the below. Gribblenation US Route 99 Page Part 1; visiting the US Route 99 shield at the Ventura Freeway/Golden State Freeway Interchange As noted in the introduction the US Route 99 shield can be seen on the eastbound Ventura Freeway (California Sta...