I promised in my earlier post that I'd put additional photos in a future entry regarding signage changes along I-40 in Raleigh. These changes are taking place with the re-designation of I-440 as an East-West route across the top of Raleigh and its discontinuance on I-40. NCDOT had a press release last week saying they had completed the I-440 re-signing. Here are some photos taken in January showing examples:
This is on Wade Avenue approaching the I-440 interchange, the previous 'Inner' and 'Outer' designations have been replaced by 'East' and 'West.'
Here's a closeup of the second sign in the interchange. Another 3 control city sign. The trivia about this sign is that only 1 of the cities (Wake Forest) does either of these routes go to. The other destinations might be more appropriate on a I-40 US 64 sign, since you need to get on 64.
This is signage along the roadway itself, all that was done here is place an 'East' panel over the I-440 shield.

Now for sign changes on I-40 itself. I took a detour further east on I-40 from I-440 East down to Jones Sausage Road (brief pause for any snickering) and back to see signage on I-40 West approaching the Beltline. The first sign is:
The construction signage does not relate to the signage project but an ongoing paving job on I-440. Notice the lack of control cities. A 1/2 mile further this is the next sign:
This sign assembly has both a new sign for I-40 and a revised sign for I-40, notice the only control city is Durham. Is this to help or warn drivers? It's the same for the next signs assembly as seen in the previous post:
They've left the previous ground signs telling people to use 440 for north and east Raleigh and I-40 for south and west Raleigh, but an overhead sign might be more helpful. While these are definite changes from the previous signs, not all has been changed along the I-40 portion, like:
This assembly I assume has been there since I-40 was connected to the Beltline and has survived several route changes, additions, and now subtractions. How long will it remain?
As for the signing of I-40 after the merge, there are new I-40 and US 64 signage:
These are new signs, but they don't follow the recent NCDOT practice of putting route shields with more than one designation on green signage. Maybe this contract has been put off for so long it still was using the old specifications. As for the rest of I-40/US 64 there have been some new signs, but, at least westbound, not too many. The signage where I-40 meets I-440 again has not changed.

I also took some photos related to the I-40 widening project in Cary which begins at the end of West I-440 and continues to Wade Avenue:
Barriers have been placed to protect workers in the median and bringing the new lanes down to grade has begun. To speed up the process NCDOT's contractor is using a conveyor system:
To take the dirt and rock from the median over the highway to awaiting trucks. Another conveyor belt will take asphalt to the site when the roadbeds are completed. It appears workers are concentrating their efforts now between Wade Avenue and the NC 54 exit due to the presumed convenient location of the porta-potty:
This design-build project is supposed to be completed by the end of June 2011. If you would like more information go to the official NCDOT site at: http://www.ncdot.gov/projects/I4744/

Comments

Popular posts from this blog

Grand Loop Road of Yellowstone National Park

  Grand Loop Road is a 140 mile loop highway which traverses the interior of Yellowstone National Park.  Grand Loop Road connects all of the major attractions and geological features of Yellowstone National Park along with the entrance roads.  Grand Loop Road is a seasonal highway and despite some conjecture never has been part of the US Route System.   Part 1; the history of Grand Loop Road The majority of history pertaining to Grand Loop Road was taken from the below National Park Service article: Historic Roads - Yellowstone National Park (U.S. National Park Service) (nps.gov) Yellowstone was declared the first National Park of the United States on March 1st, 1872.  The first real highway to access Yellowstone National Park came in 1873 when a tolled facility was constructed from Bozeman, Montana via Yankee Jim Canyon to Mammoth Hot Springs.  Numerous attempts were made to fund construction of roadway infrastructure during the early years of Yellows...

The last 1956-63 era California Sign State Route Spade?

Along southbound California State Route 170 (the Hollywood Freeway Extension) approaching the Hollywood Freeway/Ventura Freeway interchange a white California State Route 134 Sign State Route Spade can be observed on guide sign.  These white spades were specifically used during the 1956-63 era and have become increasingly rare.  This blog is intended to serve as a brief history of the Sign State Route Spade.  We also ask you as the reader, is this last 1956-63 era Sign State Route Spade or do you know of others?  Part 1; the history of the California Sign State Route Spade Prior to the Sign State Route System, the US Route System and the Auto Trails were the only highways in California signed with reassurance markers.  The creation of the US Route System by the American Association of State Highway Officials during November 1926 brought a system of standardized reassurance shields to major highways in California.  Early efforts to create a Sign State Route ...

California State Route 70; the Feather River Highway

From 2017 through to early 2019 I drove the majority of the California State Route 70; the Feather River Highway from CA 89 southwest to CA 99. CA 70 is an approximately 178.5 mile state highway which starts at US 395 near the Nevada State Line and travels west through the Feather River Canyon to CA 99.  CA 70 is often referred to as the Feather River Highway" given it's close association with the river.  Historically CA 70 was previously signed as US 40A and CA 24.  The Legislative Routes prior to the 1964 California Highway Renumbering that made up the current route of CA 70 are as follows: -  Legislative Route Number 21 from US 395 westward to Oroville. -  LRN 87 from Oroville south to Marysville. -  LRN 232 from Marysville to the current junction with CA 99.  CA 70 was even dual signed with CA 99 into Sacramento on what was LRN 232 for a time. The change from US 40A/LRN 21/LRN 87/LRN 232 can be seen by comparing the 1963 State Highway Ma...