As Adam indicated in his previous photo post, we were out Saturday (4/10) checking on the progress of the Triangle Expressway, the Future Toll portions of NC 540 and NC 147. The trip went in the opposite direction as before, so this progress report will start with...
1. The Western Wake Freeway (NC 540):
As seen from the current end of NC 540 looking west, there has been some substantial work on grading the road and the start of installing bridges since our last visit in February:
Both cement and steel bridge supports can be seen. They have piled the material needed for the next bridge project on the median between the unopened lanes of NC 540:
The first major road closure will occur tomorrow (4/12) as explained in this message sign:
McCrimmon Parkway will be closed as a bridge is put in to take the parkway over the freeway.
Here's a view of what they will have to remove:
The parkway is behind the guardrail. The photo was taken from the edge of the Panther Creek High School stadium access road. The stadium bleachers will have a good view of construction, and of the toll road traffic, after completion. Here's the view looking toward NC 55 from where the Parkway bridge will be constructed:
As you can see on the left, there has already been a start to landscaping the highway. The tracks to the right are how contractor vehicles enter and leave the roadbed (with drivers to busy to return a wave). The photo below looks the other direction, south of McCrimmon Parkway:
It appears they are starting bridge construction along the highway in the distance. The cement slab at bottom right is part of a culvert they are building, closeup photo below:
Since last February, construction, has proceeded across Carpenter Fire Station Road in Cary and further south toward US 64. The photo below is looking south along Carpenter...
Here's a view to the north:
As construction moves along, we have tried to find parking areas that are best to observe the construction. The newest one we found is the parking lot for the relatively new USA Baseball complex, here's a photo of the future toll road taken walking from the parking lot to within the toll road's right-of-way:
While most of the construction ends about here, around the curve behind the hill of dirt...
Clearing continues south past Green Level Road East where the contractor has cleared enough space for an office trailer and parking lot for employee vehicles. This is where the first interchange south of NC 55 will be built. The most interesting items in this area are that some houses have not been cleared but are apparently being used by the fire department for training exercises. Here's one that's been mostly burned down:
The tree clearing stops south of Green Level, a little more than a mile north of US 64, the next major route to be affected by the West Wake Freeway construction.

2. The Triangle Parkway (NC 147)
We saw less progress here than on the NC 540 portion, surprising, since this section is only 3 miles long and is supposed to be complete next year. There were some signs of progress at the southern end, as seen below from the current NC 540 Davis Drive offramp:
Some initial construction work and clearing has gone north of here. You can view additional clearing that has taken place south of Davis Drive as it curves back toward Hopson Road:
However, little progress can be seen to the north as viewed from the future Hopson Road bridge and interchange:
Which appears similar to the photos of the area taken in February, except that one of the construction trailers has been moved. A clue to the lack of progress may be seen south of Hopson...
Where currently the high-power electric transmission poles and lines appear to be in the future parkway's right-of-way. Whether this is according to schedule, or is due to a delay in talks with the power company, is not known. Any lag in progress here may threaten to delay the planned opening date of 2011.
They are making progress at the northern end where the current NC 147 meets its future pathway:
The grade has been cut down to meet the current roadway and it appears work on a culvert is starting where the two cranes are located. There is also construction starting along current NC 147 southbound by the I-40 interchange. I will try to find out whether there is any problems that would cause a delay in constructing the parkway before the next update in late May.

Comments

Popular posts from this blog

The case to move Interstate 73 in Southern Ohio onto US 33

Every decade or so, Ohio pushes to revisit the proposed Interstate 73 that would connect Michigan to Myrtle Beach, South Carolina.  It's been happening since Congress legislated the route in 1991.  Within Ohio, Interstate 73 generally follows the US 23 corridor from Portsmouth through Columbus to Toledo, and into Michigan. Since High Priority Corridor Five was created , Ohio has really done nothing to move forward with Interstate 73.  Sure, there have been feasibility studies here and there.  But actual dollars and construction just haven't occurred. The US 33 Nelsonville Bypass appears to have been built to Interstate standards. However, Ohio has been slowly upgrading US 33 to a full freeway through Southeastern Ohio.  Bypasses of Lancaster and Nelsonville opened in 2004 and 2013, respectively.  Other sections of two-lane road are being twinned, some to freeway or, at a minimum, to expressway standards.  Currently, a $274 million widening project in...

Local Sign Find - The last remnant of Business Interstate 95 between Kenly and Rocky Mount , NC

As you head north on Interstate 95 at Exit 107 for Kenly and US 301, you'll notice something odd about the overhead sign for the exit.  Peeling off the sign for all that can see is the word 'NORTH' off-center from the US 301.  This old sign (probably close to original from when this section of I-95 opened - more on that in a little bit) gives a hint to a short-lived Business Interstate Route that ran from here to Rocky Mount. The last hint of the Kenly-Wilson-Rocky Mount Business I-95 (Shaun White - August 2020) Interstate 95 in North Carolina has a unique history.  But one of the overlooked and forgotten pieces of Interstate 95 in North Carolina is the 38 mile section between Kenly and Rocky Mount.  When opened to traffic in late 1978, it was the next to last piece of Interstate 95 in North Carolina to open replacing a four lane US 301 from Battleboro through Rocky Mount and Wilson to eventually tying back into the Interstate in Kenly. Though it was not delayed in l...

Nostalgia fast food with style - Returning to Rax

Nostalgia. It sells. It evokes, and more accurately, warps memories of days gone by.  Things were better, simpler, and we eat it up. Nostalgia can make you drive three hours and over a hundred miles out of your way just to reconnect with a dying fast-food restaurant you last enjoyed in the early to mid-90s.  That person was me - that restaurant was Rax. I could go on about Rax's history, but in short, Rax was briefly a very popular roast beef fast-food chain.  Growing up in the 80s and early 90s in Western PA, Rax was the good fast-food spot.  The milkshakes.  (Personally, the chocolate chip milkshake was heaven.)  Uncle Alligator Kids Meal with the chocolate chip cookie. Take that McDonald's Happy Meal!  The fancy salad and hot foods bar.  Going to Rax was special.  Like so many similar restaurants, various investments, management decisions, etc., led Rax to almost disappear overnight.  By the time I graduated college in late 1999, abou...